A04-Specification.pdf

PDF 754 KB Posted

Attached to
MI-PENDILLS CRK NFH-UV SYSTEM REPL Federal contract opportunity
Solicitation number
140F0222R0006
Issued by
Department of the Interior Fish and Wildlife Service Region 2

About this file

This document outlines technical specifications for replacement of an ultraviolet disinfection system at Pendills Creek National Fish Hatchery in Michigan. The project involves furnishing and installing one open channel UV system in an existing concrete flume, with an option to add a second system. Key requirements include low pressure high intensity UV lamps in a polypropylene housing, quartz sleeves, electronic ballasts, controls for dose pacing and monitoring, and commissioning and training by the manufacturer. Ancillary items such as spare parts and safety equipment are also specified. The work shall be performed on a lump sum basis by a contractor licensed in Michigan and includes equipment procurement, installation, startup and training of hatchery staff.

View the file

Other files for this federal contract opportunity

Other files attached to MI-PENDILLS CRK NFH-UV SYSTEM REPL, newest first.
File Type Posted
PPQ.docx DOCX document
CPARS_Notice.pdf PDF
B03-DOL_Wage_Determination.pdf PDF
Sol_140F0222R0006.pdf PDF
A06-Drawings.pdf PDF
BidBond__Form_SF24.pdf PDF
Safety_Checklist.pdf PDF
Bid_Form.doc DOC document
Notice_to_Offerors.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Page J - 1

PART III, SECTION J

LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

INDEX

TECHNICAL PROVISIONS/SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01100 SUMMARY OF THE WORK

SECTION 01310 PROJECT COORDINATION

SECTION 01330 SUBMITTALS

SECTION 01420 DEFINITIONS AND STANDARDS

SECTION 01440 Component and System Testing

SECTION 01770 PROJECT CLOSEOUT

Division 15

SECTION 15050 Basic Materials and Methods

SECTION 15179 Open Channel Vertical UV System

Division 16 Electrical

SECTION 16050 Electrical Basic material and Methods

ATTACHMENTS

PRECONSTRUCTION SAFETY CHECKLIST

DRAWINGS

Original 2011 Contract Drawings

Drawing of new UV treatment rack installation location.

DIVISION 1 SECTION 01100

GENERAL REQUIREMENTS SUMMARY OF THE WORK

01100-1

PART 1 - GENERAL

1.1 Project Title: Pendills Creek NFH Ultraviolet Disinfection System

Pendills Creek NFH uses ultraviolet (UV) disinfection to control fish pathogens for the incoming fish production water supply. Recently an influx of sand and detritus plugged the mud valves and backed the water up into the filter building, flooding the existing UV system. The flooding event destroyed the two existing UV disinfection systems. The UV disinfection systems in the filtration building are imperative to maintaining fish health in the hatchery. This contract shall replace the damaged UV systems.

1.2 Work Under These Specifications

Base Bid

A. Contractor shall furnish materials, labor and equipment required to provide one open channel, gravity flow, low pressure high intensity ultraviolet lamp (UV) disinfection system complete with an in-situ automatic mechanical wiping system including a variable output electronic ballasts. The new system is required to occupy the same space as the existing UV system. Demolition of the existing system and cleanup of all mud and debris has already been completed by the hatchery staff.

The UV system when installed shall be complete and operational with all control equipment and accessories as shown and specified herein. This system will be capable of disinfecting aquaculture water.

The system shall be installed by the contractor and tested by the commissioned by the UV manufacturer/distributor only.

The contract will include equipment procurement, installation, startup, and training for hatchery personnel.

All electrical work required to be performed by a Michigan licensed electrician

Base bid is for one (1) fully functioning UV system occupying one channel including startup, training and all spare parts as described in the specifications.

This work will not be measured for payment and shall be performed on a lump sum basis.

B. Bid Additive #1 for a second fully functioning UV system occupying the second

01100-2 existing channel including startup and commissioning additional training is not required.

Contractor shall furnish materials, labor and equipment required to provide a second open channel, gravity flow, low pressure high intensity ultraviolet lamp

(UV) disinfection system complete with an in-situ automatic mechanical wiping system only including a variable output electronic ballasts. The new system is required to occupy the same space as the existing UV system. Demolition of the existing system has already been completed by the hatchery.

The UV system to be complete and operational with all control equipment and accessories as shown and specified herein. This system will be capable of disinfecting aquaculture water.

The system shall be installed by the contractor and tested by the commissioned by the UV manufacturer/distributor only.

The contract will include equipment procurement, installation, startup.

All electrical work required to be performed by a Michigan licensed electrician

This work will not be measured for payment and shall be performed on a lump sum basis.

1.3 Location and Inspection of Site

A. The work site is located at:

U.S. Fish and Wildlife Service

21990 W. Trout Lane, Brimley, MI 49715.

The mailing address is shown on the Solicitation, Offer, and Award (Standard

Forms 1442 or, 18 block 9) as attached to this Invitation. The Station Manager

Denise Johnston may be contacted for further information at the above referenced address or by telephone at (906)437.5231.

B. All prospective bidders/quoters, contractors, subcontractors, and related persons are encouraged to visit the site(s) of the proposed Work and to assess the location(s) and extent of the Work prior to submitting bids/quotes. Persons may inspect the site by contacting the Station Manager.

1.4 Specifications and Drawings for Construction

01100-3

A. The successful bidder will be provided, upon request, up to 5 sets of additional full-size prints of the contract drawings as necessary for execution of this contract. These drawings will be provided at no additional cost to the successful bidder/quoter.

B. Exact location of all affected utilities will be the responsibility of the contractor.

Drawings may not completely show all utilities. Site verification is required in addition to contacting any local authorities and utility companies to determine exact locations of utilities.

C. In case of difference between drawings and specifications, the specifications shall govern.

1.5 Work Not Included In This Contract

A. All items indicated "NIC" on drawings or in specifications are items not included in this contract.

B. Work in place is generally shown as "Existing" on the Contract Drawings.

C. Work to be performed under other contracts and not included as part of this contract is generally shown as "By Others" on the Contract Drawings.

1.6 Items Provided By The Government

A. Work to be accomplished by the Government or manufactured items to be provided by the Government are generally shown as "By Government" on the

Contract Drawings.

1. Unless specifically provided herein, no materials or equipment shall be furnished by the Government under this Contract.

1.7 Engineering Services:

A. The Government has established a baseline and a benchmark for this project. The drawings relate the project to the baseline and benchmark. From this baseline and benchmark the Contractor shall furnish and place all stakes, marks, and templates required for the performance and completion of the work. Any baseline monuments or benchmarks disturbed or removed during construction shall be reset by the Contractor at their expense.

GENERAL REQUIREMENTS SUMMARY OF THE

WORK

01100-4

1.8 Temporary Facilities

A. Maintain and restore all government roads, service areas and utilities used to pre-construction condition.

B. Temporary toilet facilities must be provided.

1.9 Site Access and Right of Way

A. The construction access limits on Government property will be established by the

Government and the Contractor shall be responsible for complying with these limits and governing all work accordingly. All temporary access roads shall be removed following work completion unless directed otherwise by the Contracting

Officer.

B. All bidders are reminded that they are responsible for contacting the local entity such as township, county, or state having jurisdiction in the project vicinity to insure bidders/quoters are aware of any requirements of the local entity. These requirements are between the entity and the bidder. Load limits and other restrictions shall be obeyed. If the Contractor proposes to cross private property, permission must be obtained from the owner to use private property or roads in the conduct of the Work.

C. Work scheduled on Saturdays, Sundays, Federal Holidays or other than normal working hours shall be approved in advance by the Government.

1.10 Safety - In addition to FAR 52.236-13 Accident Prevention

A. Contractor shall fill out and submit the “Preconstruction Safety Checklist” to the

Contracting Officer (CO) prior to beginning construction.

B. The contractor shall designate a safety officer to ensure a safe work site. The safety officer shall perform daily work site inspections to assure compliance with all safety regulations and standards.

C. The Contractor’s Safety Plan shall be available on-site. The Contractor shall provide Material Safety Data Sheets (MSDS) for all hazardous materials brought on-site. MSDS shall be made available in a conspicuous location.

GENERAL REQUIREMENTS SUMMARY OF THE

WORK

01100-5

D. All equipment and work activities shall comply with OSHA Regulations and all accidents incidental to work performed under this contract shall be reported in accordance with OSHA reporting requirements. Additionally a copy of the accident report shall be provided to the Contracting Officer.

E. The contractor shall provide and install barricades, signs, or other warning devices to delineate the construction area and restrict public access to the construction site. Follow Manual of Uniform Traffic Control Devices (MUTCD).

F. Provide at least one non-freezing-type fire extinguisher in each workshop and shed used for storage of materials on the premises. Place in location readily accessible to workers.

G. Provide at least one non-freezing-type fire extinguisher of the appropriate class for each group of workers performing flammable procedures.

H. Provide and maintain a basic first aid kit for use of workers.

(a) Provide first aid supply commensurate with size of project with items necessary for first aid treatment of all injuries. The first aid supply shall include items identified on MSDS (see paragraph B of this section) in applicable locations.

(b) Advise all workers of the location of first aid supplies.

(c) Post telephone numbers of nearest hospital or ambulance service and fire station in conspicuous location. Advise all workers of location of telephone numbers.

I. Provide necessary Personnel Protective Equipment (PPE) as identified by MSDS and OSHA regulations. Provide documentation, workers have been trained in use of PPE prior to individual use.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

(END OF SECTION 01100)

DIVISION 1 SECTION 01 3100

GENERAL REQUIREMENTS PROJECT COORDINATION

01 3100-1

1.1 Jobsite Administration - Superintendence, Subcontract administration and Quality

Control, is the responsibility of the Contractor.

A. Final decisions relative to items in conflict shall be made by the Contracting

Officer.

B. The Government shall have the authority to temporarily suspend the Work for such time as necessary because of the failure on the part of the Contractor to perform any of the provisions of the Contract. No extension of contract performance time will be permitted until the Government determines that the defi-ciencies in performance, which caused the temporary suspension, have been corrected.

C. The Contractor shall have responsible superintendence on site during all project operations. Contractor shall notify Government of any changes of superintendents.

D. The Contractor shall notify the COR at least ten (10) days prior to the anticipated date of completion of all Work specified herein. Upon completion of the Work, the COR shall proceed with the final inspection which shall be completed as promptly as practicable. The time required for such inspection and for performing any corrective Work shall be included in the contract performance time.

1.2 Modification/Change Order procedures

A. In the event of the need for a Change Order, the Contractor will receive a letter requesting a price quote for proposed changes to the Contract.

B. For evaluation purposes, the Contractor's quote shall be broken down to show the costs of labor and materials for each proposed category of Work included with the change, along with the total cost for Contractor's overhead, profit, and bond for the proposed changes.

C. All Contract time extensions required as a result of a proposed change must be justified and supported in detail at the time of the proposal.

DIVISION 1 SECTION 01 3100

GENERAL REQUIREMENTS PROJECT COORDINATION

01 3100-2

1.3 Preconstruction Conference

A. Soon after award of the Contract and prior to commencing construction, the

Contractor and any subcontractors shall attend a preconstruction conference with representatives of the Government. Timely notification of the meeting will be given to the Contractor. Time, date, and place of the conference will be determined by the Contracting Officer. Requirements pertaining to Contract administration, construction operations and the project schedule will be discussed.

The project schedule shall be in accordance with Section 01330. The

Preconstruction Safety Checklist shall be submitted for review during this conference.

1.4 Progress Meetings

A. Periodic general project meetings will be conducted with a representative of the

Contractor at the project site or by telephone by the Government's representative for the purpose of coordinating, expediting, and assessing the work progress.

B. The Contractor shall provide reports of progress on the project, discuss the work schedule for the coming period and present all conflicts, discrepancies or other difficulties for resolution. A record of discussions and decisions will be prepared by the Government and distributed to those attending and others affected.

PART 3 - EXECUTION (not Applicable)

(END OF SECTION 01 3100)

DIVISION 1 SECTION 01 3300

GENERAL REQUIREMENTS SUBMITTALS

01 3300-1

1.1 General:

A. Refer to technical specifications for all submittals required.

B. When specifically requested by the Contracting Officer (CO), Contractor’s

Officer’s Representative (COR) or the Government’s Construction Inspector, the

Contractor shall provide copies of manufacturer's written installation instructions and/or recommendations for review and approval prior to accomplishing equipment installation.

1.2 Submittal Register:

A. Furnish digital .pdf copies of all required submittals. Submit material samples via mail.

B. The approval of submittals shall not relieve the Contractor to comply with the terms and conditions of the Contract Drawings and Specifications. The

Contractor shall be responsible to determine correct dimension, design, connection, detail and satisfactory construction of all Work.

1.3 Project Schedule: Contractor shall provide as required by Federal Acquisition Regulation

(FAR) clauses. *

1.4 Price Breakdown - Lump Sum Items: Contractor shall provide as required by FAR clauses. *

1.5 Subcontractor's List

A. Submit a list of subcontractors who will be working on the project.

1.6 Submittal of Progress Payment Certificate: Contractor shall provide as required by FAR clauses. *

1.7 Guarantees, Warranties and Certificates: Refer to Section 01 7700

1.8 Operating and Maintenance Instruction: Refer to Section 01 7700

1.9 Delivery Tickets

DIVISION 1 SECTION 01 3300

GENERAL REQUIREMENTS SUBMITTALS

01 3300-2

A. The Contractor shall submit to the Government's on site representative, one legible copy of each delivery ticket for all material delivered to the construction site.

B. The delivery ticket shall show brand name, catalog number, and number of items received.

1.10 Waste Manifests

A. The Contractor shall submit copies of all waste manifests.

B. Manifests shall state type of waste (i.e., construction debris, hazardous asbestos, etc.), location of disposal, landfill designation, EPA registration of landfill, and

EPA registration for transportation of any hazardous wastes.

* The applicable FAR clauses will be provided in full text to the resultant contractor at the pre-construction conference.

(END OF SECTION 01 3300)

DIVISION 1 SECTION 01420

GENERAL REQUIREMENTS DEFINITIONS AND STANDARDS

01420-1

1.1 Regulatory Requirements

A. All work shall be accomplished in strict accordance with OSHA and all other regulations, codes, and laws in effect at the time the work is performed for the location where it is to be performed.

1.2 Means and Methods

A. Means and methods used in the performance of this Contract must be in accordance with all applicable Federal Acquisition Regulations in addition to

OSHA regulations, 29 Code of Federal Regulations, acceptable industry practices as recognized by societies, associations, building codes, manufacturers’ specifications and any applicable state safety and health requirements.

1.3 Permits

A. All permits required to support construction activities such as road permits for oversize, overweight vehicles and equipment, bridge permits, and utility hookup permits, shall be obtained, and paid for by the Contractor.

(END OF SECTION 01420)

01440-1 Component Start-up and System Testing

Pendills Creek NFH Influent Treatment Building UV System

DIVISION 01 – GENERAL REQUIREMENTS Section 01440

Component Start-Up and System Testing

1. GENERAL

1.1 COMPONENT START-UP

A. Component Start-up, Calibration, and Initial Performance Testing:

1. Component Start-up Test Duration: 1.0-day minimum

2. After notification from the Contractor that the components have been installed and factory/field calibrated by the manufacturers personnel, the

Contractor shall spend a day starting up and demonstrating component operation to the CONTRACTING OFFICER’S REPRESENTATIVE

(COR) or the Hatchery Staff. The Contractor shall make adjustments where required and operate components within their normal anticipated range of operation.

3. The Component Start-up Test shall be conducted before the “Substantial

Completion” stage of the project and prior to the System Test. All operational deficiencies discovered during the Component Start-up Test shall be corrected before the System Test occurs.

B. Component Start-up and Calibration:

1. The following components shall be operated during the Component Start-up Test:

a. UV treatment system and all related components.

C. Contractor Personnel Required:

1. The Contractor shall have qualified technicians on site at all times during the UV Component Start-up who are completely familiar with the installed project components and are capable of starting/stopping equipment components and making corrective adjustments where required. For

Component Start-up of the east equipment, the COR and hatchery staff will observe component testing and calibration that the Contractor shall complete and document. During Component Start-up of the east equipment, the Contractor will develop a written list of operational deficiencies and corrective adjustments needed. The Contractor shall add to the list any deficiencies that the COR detects.

1.2 SYSTEM TESTING AND TRAINING

A. System Test Results and Approval of Systems:

1. The above System Test is intended to reveal system characteristics when operating in a series of different design conditions as well as to reveal operational deficiencies. It is not intended as a substitute for the individual requirements for items defined in the detailed sections of these

01440-2 Component Start-up and System Testing specifications and all items will be accepted in accordance with those individual requirements.

2. Deficiencies of specified items during the System Test will be remedied during the System Test and that operational phase may be repeated (with the Owner) as necessary to assure compliance with the specifications.

Deficiencies not corrected during the System Test shall be documented by the Contractor for corrective action. The Contractor shall add to the list any un-corrected deficiencies detected by the COR.

3. If during the System Test, components or subsystems are found by the

COR to be inoperable or not substantially complete (due to the

Contractor’s failure to properly install them per the Drawings, Specifications and manufacturer’s instruction or failure to complete the

Component Start-ups) such that in the opinion of the COR typical system-wide operation cannot be demonstrated, the Contractor shall pay for the

COR’s time and travel expenses for all subsequent system test(s).

END OF SECTION 01440

15050-1 Basic Materials and Methods

DIVISION 15 – MECHANICAL Section 15050

Basic Materials & Methods

1. GENERAL

1.1 WORK INCLUDES

A. Base Bid:

1. Contractor provide:

a. All labor, materials and equipment basic to the mechanical portion of the project as described herein.

b. Products included are:

1. 2.1 BOLTS, NUTS AND WASHERS

2. 2.2 HANGERS & SUPPORTS

3. 2.3 GROUT

5. 2.5 SUBMERSIBLE CAULK

1.2 RELATED REQUIREMENTS

A. Specified Elsewhere:

1. All other DIVISION 15 Sections.

1.3 SUBMITTALS

A. None Required.

2. PRODUCTS

2.1 BOLTS, NUTS, & WASHERS

A. All bolts and nuts shall conform to ASTM C307.

B. Bolts and nuts and washers outdoors or which will be continuously submerged in water or buried underground shall be stainless steel (except bolts in mechanical joint pipe).

C. Bolts, nuts and washers outdoors or joining flanged or mechanical joint pipe indoors (including restraint harness) which are to be painted, may be carbon steel.

D. Bolts, nuts and washers in rooms with two or more open water tanks (such as production rooms) and within six feet of floor shall be stainless steel.

E. All bolts, nuts, and washers not covered above shall be galvanized or stainless steel.

2.2 HANGERS AND SUPPORTS

A. Hangers and supports shall be galvanized, stainless steel, fiberglass reinforced polyester (FRP), aluminum, or factory epoxy coated steel with stainless steel fasteners unless specifically noted otherwise on the Drawings or in the

Specifications. Hangers and supports for copper piping shall be stainless steel, frp, copper coated or insulated.

15050-2 Basic Materials and Methods

B. Hangers and supports' model numbers listed in this section are provided for identification of type, not material or finish. Where Drawings or Specifications do not indicate what types of hangers to use, provide standard products by any of the manufacturers listed.

C. Pipe and equipment hangers and supports shall be rated to carry the weight of piping and shall be of the following types:

1. Brackets:

a. Grinnell

b. Michigan

c. B-Line

2. Hanger Rods, Coach Screw Rods, Eye Rods, U-Bolts

a. Grinnell

b. Michigan

c. B-Line

3. Offset Pipe Clamps and Hold-Down Anchor Clamps

Offset Hold Down

B-Line B3148 B3256

Grinnell 103

Michigan 700

4. Continuous Channel Strut shall be 1-5/8" wide 12 gage minimum stainless steel, FRP, or 0.105” aluminum. Plate accessories such as post bases and gussets in these areas shall be same as strut or steel with a factory-baked finish with a 600-hour minimum failure rate in ASTM B117 salt spray testing unless specifically noted otherwise on the Drawings. Nuts, bolts, washers, accessories, and pipe clamps shall be stainless steel, aluminum, frp, galvanized or electro-deposited, phosphatized and baked epoxy coated.

a. Manufacturers:

1. Unistrut

2. B-Line

3. Power-Strut

4. Aickinstrut/ Plastic Piping Systems

5. Strut Tech

2.3 GROUT

A. Approximately three (3) parts sand, one (1) part Portland cement, 6 +1 percent entrained air and water to produce a slump which allows grout to completely fill required areas and surround adjacent reinforcing.

B. Minimum 28-day compressive strength: 4000 psi.

2.4 GARDEN HOSE

A. Inside diameter at least 5/8 inch. Length shall be 6 to 10 feet.

15050-3 Basic Materials and Methods

B Vinyl construction with 3 or 4 plies of reinforcement.

C. Male and female 3/4” hose thread fittings at ends.

D. Acceptable manufacturers include Swan and Apex.

2.5 SUBMERSIBLE CAULK

A. Polyurethane based, single component, gun grade, adhesive and sealing compound.

B. Suitable for adhesion to aluminum and concrete and other cement-based materials.

C. Suitable for joints up to ¼ inch.

D. Suitable for long term submersion in water.

E. Manufacturers and Models:

1. Sika Sikaflex–11FC or Sikaflex–1a

3. EXECUTION

3.1 HANGERS AND SUPPORTS INSTALLATION

A. Hangers

1. Provide supports, where pipe changes direction, adjacent to valves and fittings and at equipment.

2. Vertical pipe runs shall be supported and laterally braced.

3. Piping shall be supported so that excessive loads will not be placed upon one hanger.

4. Piping shall be properly supported from hangers securely attached to the building construction.

5. All piping shall be supported in a manner to minimize undesirable stress on bodies of valves and other fittings.

6. All piping shall be supported from walls on brackets, directly from ceiling above, or be floor stands.

7. Where exposed structure is available, the pipe shall be supported from this.

8. No cutting, drilling, welding, or burning of any structural member

(including purlins of metal buildings) shall be allowed. Power driven studs and welding studs shall not be used.

9. All bolts and threaded rods shall be used with double nut and washer or single nut, washer, and lock washer wherever a single unsecured nut could work loose and allow either threaded rod or supported piping to drop.

10. Cast in place concrete anchors shall be positioned and secured to reinforcing.

B. Auxiliary Strut Support

15050-4 Basic Materials and Methods

1. Where auxiliary strut is needed for support of equipment or piping it shall be sized and joined as detailed on drawings or as listed in this specification.

2. Continuous FRP channel strut may be used for auxiliary support provided the strut is capable of supporting the total load (pipes full).

C. Maximum spacing of horizontal piping supports for individual pipes shall be listed below unless otherwise noted or shown on Drawings.

Pipe Material Maximum Spacing

1. Steel (schedule 40) or ductile iron.

1-1/4" and under 8'-0"

1-1/2" and larger 12'-0"

2. Copper Tubing (hard tempered)

1" and under 6'-0"

1-1/4" and larger 7'-0" or per Copper

Development Assoc.

3.2 GROUT INSTALLATION

A. Placing Grout:

1. Place grout in compliance with American Concrete Institute.

2. Place in a continuous operation.

3. Place by methods which prevent aggregate segregation.

4. Do not allow grout to free fall more than 4 ft.

5. Where free fall of grout will exceed 4 ft., place by means of tremie pipe or chute.

B. Curing:

1. Begin curing grout as soon as free water has disappeared from exposed surfaces.

2. Cure grout by use of moisture retaining cover, burlap kept continuously wet or by membrane curing compound.

3. Provide protection as required to prevent damage to grout and to prevent moisture loss from grout during curing period.

4. Provide curing for minimum of seven days.

5. Form materials left in place may be considered as curing materials for surfaces in contact with the form materials.

C. Form Removal:

1. Remove forms after grout has hardened sufficiently to resist damage from removal operations or lack of support.

END OF SECTION 15050

DIVISION 15 – MECHANICAL Section 15179

Open Channel Vertical UV Disinfection

15179 - 1 Open Channel Vertical UV Disinfection

1. GENERAL

1.1 WORK INCLUDES:

1. Furnish all labor, materials, equipment, and appurtenances required to provide a minimum of one open channel, gravity flow, low pressure high intensity ultraviolet lamp (UV) disinfection system complete with an in-situ automatic mechanical wiping system including variable output electronic ballasts. The new system is required to occupy the same space as the existing UV system. Demolition of the existing system has already been completed by the hatchery staff.

a. Provide spare parts and safety equipment as described.

b. The system to be provided by the Contractor including testing, commissioning, and training of the hatchery staff by the manufacturer, as specified in this Section.

1.2 RELATED REQUIREMENTS

A. Specified Elsewhere:

1. Section 15010: General Requirements for Mechanical Work

2. Section 10505: Basic Materials and Methods

3. Division 16: ELECTRICAL

1.3 QUALITY ASSURANCE

A. The manufacturer shall be regularly engaged in the manufacture of UV systems with a proven track record of at least ten (10) operating installations of a similar proposed UV system of similar size and lamp configuration and control type.

B. The manufacturer shall provide documentation of previous experience with open channel UV disinfection systems in fish hatchery applications with dose pacing and UV disinfection systems in RAS applications with variable output electronic ballasts.

C. Documentation of UV manufacturer's service capabilities including location and experience shall be submitted.

D. The manufacturer shall have local representative office or partner in the USA with an available stock of basic spare parts.

1.4 SUBMITTALS

A. Submit for review, Shop Drawings showing the following:

1. Complete description in sufficient detail to permit an item comparison with the specification.

2. Dimensions of system

15179 - 2 Open Channel Vertical UV Disinfection

3. Installation requirements.

4. Descriptive information including catalog cuts and manufacturers' specifications for major components.

5. Electrical schematics and layouts.

6. Hydraulic calculations demonstrating compliance with the required hydraulic characteristics.

7. Installation, Operation and Maintenance Instructions including safety procedures.

8. List of spare parts and safety equipment.

9. Name, address, and phone number of local representative service office for maintenance and repair of system

1.5 WARRANTY

A. Equipment:

1. The equipment furnished under this section shall be free of defects in material and workmanship, including damages that may be incurred during shipping for a period of 2 years from date of start-up.

2. PVC and polyethylene structural components shall be warranted against

UV degradation for no less than 3 years.

B. UV Lamps:

1. The UV lamps to be warranted for a minimum of 16,000 hours when operated in automatic mode, prorated after 2,000 hours. On/off cycles are limited to five (4) per day average per 24-hour period, accumulated over the total guaranteed life of the Lamp.

C. Ballasts: shall be warranted for 4 years, prorated after 1 year.

2. DESIGN CRITERIA

Provide equipment that will apply a UV dose to influent water with the following characteristics:

a. Dose rate of 74 mJ/cm2

b. Flow rate 5,000 gpm (max)

c. 32 degF water

d. 80%UVT.

Requirements:

a. The UV Dose will be adjusted using an end of lamp life factor of 0.8 to compensate for lamp output reduction over the time period corresponding to the manufacturer’s lamp warranty.

15179 - 3 Open Channel Vertical UV Disinfection

b. The UV Dose will be adjusted using a quartz sleeve fouling factor of 0.85 when sizing the UV system in order to compensate for attenuation of the minimum dose due to sleeve fouling during operation.

2.1 MANUFACTURER

A. The physical layout of the system shown on the drawings and the equipment specified herein are based upon a system manufactured by

Ultraaqua UV Systems represented by Water Management Technologies in Baton Rouge, LA with phone (225) 755-0026. This shall be used as the basis of design but other manufacturers that meet or exceed these features will be considered.

Product: MR50‐350PP Channel UV with UV intensity monitoring, Modbus scada integration, automatic wiping system. Sized for 5000 gpm, 80% UVT at a dose rate of 74mJ/cm2. The UV unit is a vertical model with qty (50) 350watt lamps. Power supply 208V/3P/4 wire.

Includes:

‐UV lamp bank(s) in non‐corrosive polypropylene (PP)

‐Lamp bank guide rails in non‐corrosive PP

‐UV lamp temperature alarm switch (lamp protection if water level decreases suddenly) ‐Lamp bank top compartment flood alarm switch

‐ULTRATHERM™ UV lamps

‐360° Channel type PTFE UV‐sensor (for UV intensity monitoring)

‐Quartz sleeve wiping system ULTRAWIPER™ (for keeping quartz sleeves clean)

‐Advanced Control cabinet for UV dose pacing (for reducing energy consumption) and external MODBUS™

‐GFRP closed cabinet IP65 rated

‐ULTRATOUCH™ controller HMI 4,3” multi‐color touch display

(menu driven, easy to use) ‐7 meter lamp cables (can be extended up to 30 meters)

The system shall also contain or be capable of:

‐Automatic operation – optimized power consumption

15179 - 4 Open Channel Vertical UV Disinfection

‐4,3” multicolour ULTRATOUCH™ display as standard – easy and simple to control

‐1" blue LED for each UV‐lamp for individual lamp state

‐Hygienic and clean maintenance compartment

‐Service work incl. quartz sleeve and UV‐lamp replacement are done without the need of any tools

‐Non‐corrosive, rigid polypropylene construction – designed for very harsh environments

‐No submerged electrical connections – All connections shall be located in the upper compartment

‐Advanced auto wiping system ULTRAWIPER™ – keeps quartz sleeves clean

3. PRODUCTS

General: Design, Construction and Materials:

The low-pressure high intensity UV lamps are mounted in a module that is installed through the upper support flange of the vertical glassware rack assembly. Each bank of lamps is positioned vertically and perpendicular to the direction of water flow.

Each lamp module acts as a completely independent entity as it can be serviced i.e. the lamp can be removed from its sleeve for service without disrupting water flow or turning the complete system power off. Each sleeve module can also be removed from the lamp array without disrupting water flow or turning the complete system power off. Each lamp is powered by its own independent electronic ballast for greater system reliability.

All wiring to the lamp is done outside of the vertical glassware rack assembly; no wiring is exposed/submerged in water. The UV lamp field is completely shielded to contain the

UV energy from the lamp field and cannot be opened during operation. Cleaning of the unit’s sleeve assemblies is done without the use of any chemicals; each module can be easily removed one at a time and wiped down with a clean damp rag.

A. All lamp banks with welded metal components in contact with effluent will be UV stabilized polypropylene.

UV stabilized Polypropylene is robust and non-corrosive material thus suitable for aquaculture environment.

B. All wiring exposed to UV light will be rubber coated. 4. All wires connecting the lamps to the ballasts will be enclosed inside the frame of the UV lamp bank and not exposed to water.

15179 - 5 Open Channel Vertical UV Disinfection

3.1 Lamp Array Configuration:

A. The lamp array configuration will be the uniform array with all lamps staggered to each other and vertically aligned in the channel for the easy access to the lamps. Horizontal array shall not be accepted due to the increased complexity of the maintenance.

B. The system will be designed for complete immersion of the UV lamps including both electrodes and the full length of the lamp tube in the effluent.

3.2 UV Lamp bank:

The UV Lamp Bank vessel is a channel system manufactured of heavy wall PVC and HDPE plastic, which is used to direct the water to be treated through the UV Sterilizes lamp field array. The channels lamp field array will have an overall size of approximately 75-inches long x 34-inches wide with an operating water depth of 66 inches. This is to occur in an existing concrete flume that has 75” high walls and is 34” wide.

Contractors shall confirm flame dimensions in field.

A. Each UV lamp bank will consist of UV lamps mounted on a non-corrosive

UV stabilized polypropylene bank. Lamp bank shall be constructed in the way that it can take minimum 12-inch water level variations in order to have protection against the floods. All the UV lamps, wiping motor, 360°

UV intensity detection system shall be accessible via sealed, top compartment during the operation, without lifting the lamp bank from the water. Top compartment shall be lockable in order to ensure that no unwanted persons have access to UV lamps or electronics.

B. Each lamp will be enclosed in its individual quartz sleeve, one end of which will be dome closed and the other end sealed by a lamp end seal.

C. The closed end of the quartz sleeve will be held in place by means of a retaining O-ring.

3.3 LPHO UV Lamps:

A. Low Pressure High Output (LPHO) UV Lamps shall be minimum 200 W low pressure amalgam design. The lamp shall be preheated to promote

15179 - 6 Open Channel Vertical UV Disinfection longevity. Lamps that are not amalgam or that are based on driving a low-pressure lamp at amperages greater than 500 milliamps will not be allowed.

B. Lamps should be able to remove without lifting the bank from the channel.

Lamps should be able to remove from the Quartz sleeves without using any tools.

C. Electrical connections will be at one end of the lamp and have four pins, dielectrically tested for 2,000 Vrms. Lamps that do not have 4 pins will be considered instant start. To be considered as an alternate, instant start lamp systems will supply replacement spare lamps equal to 50% of the total number of lamps in the system.

D. Lamps will be operated by electronic ballasts with variable output settings.

3.4 UV Lamp Quartz Sleeves:

A. Clear fused quartz circular tubing

B. Lamp sleeves will be domed at one end.

C. The nominal wall thickness will be 1.5 mm.

3.5 Electrical

A. Power supply 208V/3P/4 wire.

B. UV manufacturer to supply and install all cabling and conduit between lamps and ballasts.

C. UV manufacturer to perform all terminations between lamps and ballasts.

D. Power factor will not be less than 98% leading or lagging.

3.6 Control Cabinet details (CC):

A. Power distribution will be through environmentally sealed receptacles on the CC(s) to allow for local connection of UV modules.

B. Data concentration will be through integrated circuit boards located inside the Control Cabinet.

C. CC enclosure material shall be high corrosion resistant.

D. All internal components will be sealed from the environment.

15179 - 7 Open Channel Vertical UV Disinfection

E. All Power Distribution Centers to be UL approved or equivalent with a rating of Type IP 65

3.7 Control and Instrumentation:

A. Control Cabinet Interface (CCI):

a) The operator interface shall be minimum 7-inch multi-color high resolution touch display screen will be menu driven with automatic fault message windows appearing upon alarm conditions.

b) Alarms will be provided to indicate to plant operators that maintenance attention is required or to indicate an extreme alarm condition in which the disinfection performance may be jeopardized. The alarms will include but not be limited to:

i) Lamp Failure

ii) Multiple Lamp Failure

iii) Low UV Intensity

iv) Module Communication Alarm

c) The 50 most recent alarms will be recorded in an alarm history register and displayed when prompted.

d) Bank status will be capable of being placed either in

Manual, Off or Auto mode.

e) During manual, automatic and remote modes of system operation, the water level sensor will ensure that lamps extinguish automatically if the water level in the channel drops below an acceptable level.

f) Digital I/O modules will be provided to remotely indicate status and alarms such as:

i) Alarm conditions (major, critical)

ii) Bank Status (one for each UV bank supplied)

15179 - 8 Open Channel Vertical UV Disinfection

3.8 UV Detection System:

A. 360° UV sensor installed inside its own quartz sleeve will continuously monitor the UV intensity produced in each bank of UV lamps.

B. The sensor will measure only the germicidal portion of the light emitted by the UV lamps. The detection system will be factory calibrated.

Detection systems that can be field calibrated will not be permitted.

3.9 Dose-Pacing:

A. A dose-pacing system will be supplied to modulate the lamp UV output in relationship to either a 4-20 mA DC signal from a flow meter (by Others) or by manually entering the max flow rate.

B. The system to be dose-paced such that as the flow and effluent quality change, the design UV dose is delivered while conserving power.

C. The dose-pacing system will allow the operator to vary the design dose setting. Logic and time delays will be provided to regulate UV bank

ON/OFF cycling.

3.90 Safety Equipment:

The following safety equipment to be supplied:

A. Operators kit including face shield, gloves, and cleaning solution.

4.0 INSTALLATION

A. Lifting mechanism/ Crane:

1 Crane or lifting mechanism to be provided in order to lift the lamp bank for installation periodical maintenance including cantilevers and any other required ancillary parts. The lifting capacity of the crane and the type of crane to be approved by the

UV system manufacturer.

15179 - 9 Open Channel Vertical UV Disinfection

B. CONTROL SYSTEM OVERVIEW

The UV Sterilizer system is designed to operate automatically. The operation of the unit is managed by its microprocessor controller system, which continuously monitors and controls the system’s functions. The microprocessor controller is the brain of the system and communicates with the operator interface for complete control and monitoring of the system. The UV Sterilizer system operates using an automatic or manual dose paced control system, to maintain an adequate UV dosage for the water flow conditions while conserving power and extending lamp life. The flow pacing is accomplished by turning on groups of (7) lamp rows with a minimum of (2) rows (14) lamps being on at all times. In automatic mode the number of UV lamp rows being on (2+) is in response to manual flow input and the UVT system. Each lamp bank uses a communications control board (CCB), which monitors the lamps status. Each CCB is located inside the PSCE’s enclosure housing and communicates with the microprocessor controller via a bus network. The microprocessor controller polls each CCB in sequence to continually update the status of each lamp. The information from the CCB’s are decoded by the microprocessor controller and then checked for errors prior to being displayed on the data status screen. (See the section on controller functions for details on alarms and the types of information displayed by the data display system). This system shall also allow the Government to do manual dose pacing by manually selecting the quantity of lamps rows to be on based upon tables supplied by the UV manufacturer that indicate lamps required to achieve the minimum required UV dose at a known water flow rate and UVT displayed by the

UVT monitor.

5. EXECUTION

5.1 INSTALLATION

A. In accordance with contract Drawings, manufacturers' shop Drawings and manufacturer’s instructions.

5.2 MANUFACTURER'S SERVICES

Site visit at a minimum for one person onsite for 2 full days on site total for

Start-up, Commissioning/field testing services and Training. This portion of the contract cost shall include all travel time, flight, lodging, rental car and all other travel related expenses as required.

A. Installation assistance and certification:

1. As required for proper installation prior to start up.

B. Start-up and field testing:

1. Two full days on site, C. Operator Training:

15179 - 10 Open Channel Vertical UV Disinfection

1. One full day on site.

D. Warranty Service:

1. As required during the warranty period.

6. CLOSEOUT

At the completion of the contract submit the following spare/additional parts for future maintenance

I. Spare Parts

A. 5- spare Ultratherm 350 Long life HO UV lamp

B. 5- spare Quartz Sleeve 350 Series L1790

C. 5- spare O‐Ring for Quartz 220/350

D. 2- spare Ultratherm lamp driver 2x350W Modbus

E. 2- spare 230/350 Lamp/Quartz Assembly 2.0m

F. 5- spare220/350 wiper ring PTFE

G. 2- spare 20/350/440 UV Sensor Channel‐Type

Modbus‐5‐500Wm2

II O & M Manuals

END OF SECTION 15179

DIVISION 16 – ELECTRICAL Section 16050

Basic Electrical Materials and Methods

16050-1 Basic Electrical Materials and Methods

Pendills Creek NFH Influent Treatment Building UV Treatment

1. GENERAL

1.1 WORK INCLUDES

A. Contractor provides:

1. Boxes as required for installation.

2. Sealing of all raceway penetrations.

3. Supporting devices for all raceways and boxes as required for installation.

1.2 RELATED WORK

A. Specified Elsewhere:

1. Section 15179: Open Channel Vertical UV Disinfection.

1.3 SYSTEM DESCRIPTION

A. Basic materials include:

1. Raceways & Fittings.

2. Sealing.

3. Wire and cables.

4. Boxes.

5. Supporting Devices.

B. Provide all new materials, without blemish or defect, in accord with standards specified and U.L. listed or labeled.

1.4 REFERENCES

A. Specified references, or cited portions thereof, current at date of bidding documents unless otherwise specified, govern the work. In conflict between referenced standards and contract documents, notify CONTRACTING

OFFICER’S TECHNICAL REPRESENTATIVE (COTR) immediately. Confirm notification in writing. Do not proceed with the work until COTR issues written instructions.

B. American National Standards Institute (ANSI):

1. C80.1: Specification for Rigid Steel Conduit, Zinc-Coated.

2. C80.3: Specification for Electrical Metallic Tubing, Zinc-Coated.

3. C80.4: Specification for Fittings for Rigid Metal Conduit and

Electrical Metallic Tubing.

4. VE-1: Metal Cable Tray Systems.

5. VE-2: Metal Cable Tray Installation Guidelines.

C. American Society for Testing and Materials (ASTM):

1. A123: Standard Specification for Zinc (Hot Dipped Galvanized)

Coatings on Iron and Steel Products.

16050-2 Basic Electrical Materials and Methods

2. B633: Standard Specification for Electrodepositing Coating of

Zinc on Iron and Steel.

D. National Electrical Manufacturers Association (NEMA):

1. FB-1: Conduit and Cable Assemblies.

2. OS-1: Sheet Steel Outlet Boxes, Device Boxes, Covers and Box

Supports.

3. TC-2: Electrical Plastic Tubing and Conduit.

4. TC-3: PVC Fittings for Use with Rigid PVC Conduit and Tubing.

5. WC-5: Thermoplastic Insulated Wire and Cable

6. 250: Enclosures for Electrical Equipment

E. National Fire Protection Association (NFPA):

1. NFPA 70: National Electrical Code (NEC).

2. NFPA 101: Life Safety Code.

F. Underwriters Laboratories, Inc. (UL):

1. All materials UL listed and labeled.

1.5 SUBMITTALS

A. Product Data:

1. No submittal required when using specified materials where manufacturers are not listed.

1.6 DELIVERY, STORAGE, AND HANDLING

A. Materials shall be suitably packaged by manufacturer to prevent damage during shipment. Damaged materials will not be acceptable for use.

B. Store materials on site in clean, dry storage area; when outside, elevated above grade and enclosed with durable watertight wrapping.

C. Handle all materials carefully to prevent damage. Minor scratches, marks, or blemishes to finish shall be repaired to satisfaction of COTR.

1.7 PROJECT CONDITIONS

A. If the existing conditions prohibit proper installation or installation as shown on the drawings, Contractor shall contact the COTR for a solution.

B. Contractor shall protect all electrical items and shall repair or replace items which are damaged during construction.

2. PRODUCTS

2.1 RACEWAYS

A. Conduit:

1. Steel Rigid Metal (RGS): ANSI C80.1 & UL-6.

2. Intermediate Metal Conduit (IMC): ANSI C80.1 & UL-6.

3. Rigid Non-Metallic (PVC): NEMA TC-2.

16050-3 Basic Electrical Materials and Methods

4. Steel Flexible Metal (FLEX): UL-1.

5. Steel Liquidtight Flexible (LT FLEX): UL-1.

6. Rigid Aluminum (RAC): ANSI C80.5, UL-6A, Type 6063 Alloy, Temper

T-1.

B. Tubing:

1. Steel Electrical Metallic (EMT): ANSI C80.3 & UL 797.

C. Surface Metal Raceway:

1. Sizes and channels as shown

2. Galvanized steel with snap-on covers

3. Mounting screw knockouts in base approximately 8 inches on center.

4. Prime coated, ready for field painting.

D. Fittings:

1. RGS and IMC:

a. ANSI C80.4.

b. Locknuts; steel or malleable iron.

c. Bushings; insulating or insulated throat type.

d. Couplings; threaded or gland compression malleable iron type.

e. Set screw or indenter type fittings not acceptable.

2. EMT:

a. Couplings and Connectors; steel compression type.

b. Set screw or indented type fittings not acceptable.

3. FLEX:

a. Malleable iron, threadless, squeeze clamp type for non-jacketed conduit.

4. LT FLEX:

a. Steel or malleable iron compression type with insulated throat and

"O" ring assembly.

5. RAC:

a. Type 6063 Alloy, Temper T-1

b. Threaded fitting only.

c. Set screw or indented type fittings not acceptable.

2.2 CABLE TRAYS

A. Acceptable Manufacturers:

1. B-Line

2. T.J. Cope

3. Husky/Burndy

4. Thomas and Betts

5. P-W Ind.

16050-4 Basic Electrical Materials and Methods

B. Construction:

1. Ladder type conforming to NEMA VE-1.

2. Side channels and transverse elements: hot rolled ASTM A1011 carbon steel galvanized per ASTM A123.

3. All hardware galvanized or stainless steel.

4. Size as indicated on drawings.

5. Side Rails:

a. I-Beam or channel.

b. Flange in or out (full width top opening).

6. Transverse elements:

a. Solid bar, tube, or channel with stiffened flanges.

7. Maximum 6-inch centerline rung spacing.

8. UL classified per NFPA 70 as an equipment grounding conductor.

C. Fittings:

1. Radius of bends:

a. As required for cable layout in tray.

2. Degree of arc for elbows:

a. As required for cable tray layout.

2.3 SEALING

A. Thermal Seal:

1. Seal penetrations of thermally insulated equipment or rooms to prevent heat transfer.

2. Seal exterior of raceway with fiberglass or other material compatible to equipment or room and approved by COTR.

3. Seal interior or raceway with duct sealing compound at entry to equipment or room.

B. Water Seal:

1. Seal penetrations of perimeter walls or floors below grade to prevent entry of water.

2. Use materials compatible with wall or floor construction and approved by

COTR.

2.4 WIRE AND CABLE

A. Building Wire:

1. 98% conductivity Copper only.

2. 600 Volt insulation, type THWN-2

3. Complying with UL-83 & ICEA S-61-402 or S-66-524.

4. Wire #10 and smaller solid conductors. Wire #8 and larger stranded conductors.

16050-5 Basic Electrical Materials and Methods

5. Branch Circuit Wiring:

a. Conductors sized in accord with NEC 75oC Ampacity tables.

b. Minimum wire size shall be #12 AWG

c. Increase one (1) wire size when furthest outlet is greater than 75 feet from panelboard.

6. Wiring for systems other than power:

a. Comply with system manufacturer's standards.

b. Minimum wire size shall be #14 AWG unless otherwise specified.

7. Where conductors of different systems are installed in same raceway box, or other type enclosure, comply with NEC 210.5.

B. Joints and Splices:

1. Wire No. 8 or smaller:

a. Compression or crimp type with insulating wrap cover

b. Insulated twist-on spring connector.

2. Wire No. 6 or larger:

a. Mechanical compression or bolted type connector covered with insulating tape or heat shrinkable insulation equal to conductor insulation.

2.5 BOXES

A. Pull and Junction Boxes:

1. NEC - 314 and U.L. 50.

2. Boxes of minimum 14-gauge galvanized steel, prime coated in finished areas.

3. Surface mounted boxes:

a. Screw-on or hinged cover.

b. Provide silicon bronze standard retaining screws where accessible only to authorized personnel, security type in all other locations.

c. Screws spaced twelve inch maximum.

B. Outlet Boxes:

1. Exterior boxes or exposed interior in wet/damp locations:

a. Cast aluminum.

b. Deep type.

c. Corrosion proof fasteners.

d. Watertight, gasketed, threaded…