A04_SOW_Wapanocca_Culverts.pdf

PDF 72 KB Posted

Attached to
Corrugate Metal Pipe Culverts Wapanocca National W
Solicitation number
140FGA24Q0037
Issued by

About this file

This document is a Statement of Work (SOW) for the procurement of corrugated metal pipe (CMP) culverts for the Wapanocca National Wildlife Refuge (NWR) in Arkansas. The US Fish & Wildlife Service is seeking to purchase six aluminized steel CMP culverts, three 20-foot-long and three 40-foot-long, both with a 48-inch diameter and 14-gauge thickness. Additionally, three 48-inch diameter aluminized steel bands are required. The period of performance is from October 1, 2024 to July 31, 2025, with delivery to the Wapanocca NWR Shop. This is a Lowest Price, Technically Acceptable (LPTA) acquisition, with Solicitation Number 140FGA24Q0037 issued by the Department of the Interior Fish and Wildlife Service.

View the file

Other files

File Type Posted
Sol_140FGA24Q0037.pdf PDF
A04_Price_Schedule_Culverts.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Wapanocca Culverts

The US Fish & Wildlife Service is seeking to purchase culverts for the Wapanocca National

Wildlife Refuge (NWR) in Arkansas. Contractor shall supply and deliver six aluminized steel corrugated metal pipe (CMP) culverts with the following specifications:

• Three (3), 20-foot-long aluminized steel CMP that are 48” diameter and 14 gauge thickness

• Three (3), 40-foot-long aluminized steel CMP that are 48” diameter and 14 gauge thickness

• Three (3), 10-C aluminized steel bands that are 48” diameter

Period of Performance: October 1, 2024 – July 31, 2025

Delivery:

Wapanocca NWR Shop

Attn: Steven Rimer

1004 Driver Road

Turrell, AR 72384

The contractor shall notify Steven Rimer, 870-564-2429, after award to set up a delivery schedule. Deliveries will be allowed Monday through Friday (except holidays) 7:30 am –

4:00 pm and as climatic conditions allow. Unloading the product is the sole responsibility of the delivery carrier. No labor or equipment will be provided by the government to unload the supplies.

This is a Lowest Price, Technically Acceptable (LPTA) acquisition.