This statement of work outlines requirements for a water tank rehabilitation and wastewater system replacement project at Balsam Mountain Campground and Heintooga Picnic Area in Great Smoky Mountains National Park. The scope of work includes refurbishing an existing water tank and installing a liner; constructing a new access road to the water tank; replacing waterlines; rehabilitating an existing well; installing new septic tanks and drain fields at two comfort stations; and restoring all disturbed areas. The contractor will be responsible for providing all required labor, materials, and equipment. Work is to be completed by May 13, 2024 while the sites are closed for the season. Bids are being solicited under solicitation number 140P5323R0022 for this water tank and wastewater system rehabilitation project at Great Smoky Mountains National Park.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Water Tank Rehab Improvement Project Balsam Mountain Campground/Heintooga Picnic
Area Swain County, NC Great Smoky Mountains National Park
3/3/23
1. General Information The Great Smoky Mountains National Park (GRSM) is located in Tennessee and North Carolina and consists of nearly 521,000 acres. The park was established by Congress on June 15, 1934.
The Park’s mission is to protect, preserve, and interpret the natural, cultural, and historical resources for the benefit and inspiration of present and future generations. There are over 9 million visitors annually.
2. Facility Background Balsam Mountain Campground and the Heintooga Picnic Area are located in a relatively remote part of GRSM in North Carolina. Balsam Mountain Campground is located close to the end of Heintooga Ridge Road on Balsam Mountain at 5,310 feet elevation. Heintooga Picnic Area is located at the end of Heintooga Ridge Road. Heintooga Ridge Road intersects the Blue Ridge Parkway just northwest of the intersection of the Blue Ridge Parkway and Highway 19. Due to the high elevation, both sites are closed in the winter months.
Balsam Mountain Campground offers approximately 43 small campsites with wood-framed, gravel pads for pitching tents, fire rings, and picnic tables. The campground includes a dish washing station and restrooms with flush toilets and drinking water. There are no hookups or showers at the campground and no electricity is available in the restrooms or campsites. There is also a Ranger Station structure at the entrance to the campground. Heintooga Picnic Area has 41 picnic sites, each with a table and charcoal grill. The picnic area also has restrooms with running water, but no electricity or pavilions.
EXISTING WATER SYSTEM
The existing water system consists of a well, a pump house, a 30,000-gallon water storage tank and a water system consisting of approximately 2,740 linear feet of 4-inch PVC, and 7,900 lf of 2-inch waterline. These lines have reached the end of their service life and need to be replaced.
The water storage tank is the original in-ground concrete water storage tank built back in 1960.
The Park has had success refurbishing these tanks and lining them with a polyurethane liner.
The well is located adjacent to the roadway in a concrete vault. To meet current state codes, the well must be raised above grade. A small structure will need to be constructed around the well.
EXISTING WASTEWATER SYSTEM
There are two comfort stations at the Balsam Mountain Campground and two comfort stations at the Heintooga Picnic Area. The campground has a sewer collection system that drains several hundred feet through the woods to a 5,000-gallon septic tank. The septic tank in turn, drains to a dosing tank which alternately discharge to two separate sand filters. The effluent disperses underground with no discharge. The Heintooga Picnic area has a sewer collection system from each comfort station that drains to a single 3,000-gallon septic tank located between the two comfort stations, deep in the woods. The system has a drain field that works fine, but since the septic tank is so far in the woods, it is very difficult to pump it out on a regular basis.
3. Scope of Proposed Work The scope of work for each system is as follows:
WATER SYSTEM IMPROVEMENTS
1. Water Tank – Refurbish and Install a Liner It is proposed to refurbish the existing water tank, followed by adding a liner to the tank to preserve the tank for future use. All of the internal piping, controls, access hatch and ladder are to be replaced; and a french drain is to be installed around the perimeter of the tank. The tank shall be pressure washed, cracks shall be sealed, and an elastomeric polyurethane spray on liner installed on the inside and the outside top of the tank. New piping shall extend outside of the tank and have new valves installed per the plans.
2. Water Tank Access Drive The existing water tank is located across from the campground area, high up on a hill. The original access to the tank was via a long road from the location of the existing well, up the creek, to a reservoir constructed in the creek. The road then followed the waterline from the reservoir to the water tank – a distance of several thousand feet, high up the hill. The road going up the creek bank has been washed out, and it would be too invasive to the creek to try and re-establish the road. It is proposed to construct a new road from Heintooga Ridge Road, near the campground, up to the tank. The proposed road will require clearing the trees, grading the road-bed, installing drainage culverts where shown on the plans and placing stone on the prepared subgrade. The road will not be paved.
3. Waterlines The existing 2-inch pump line and the existing 4-inch distribution line both run up the hill through the woods to the existing water tank. Once the new road is graded out, a new 2-inch HDPE pump line and a new 4-inch HDPE distribution line shall be installed, prior to placing the stone base course. The new lines shall connect to the existing lines running along the side of Heintooga Ridge Road.
4. Well The well needs some improvements to stay current with state codes. The well-head is to be raised, and a new concrete pad poured around it. A new enclosure is to be installed over the well. A draw-down test shall be performed to verify the condition and capacity of the well.
A new pump shall also be provided and installed – the existing pump is a 2-horsepower pump, but the model of the existing pump is not known. The replacement pump shall match the existing or be equivalent. The well is 120 feet in depth.
WASTEWATER SYSTEM IMPROVEMENTS
1. Septic Tanks It is proposed to abandon the existing septic tank and drain field at the Heintooga Picnic Area. It is proposed to install a new septic tank and drain field adjacent to each of the two comfort stations. The proposed drain fields will include approximately 800 linear feet of infiltration chambers for each comfort station.
4. Contractor Responsibilities Contractor shall provide the following materials and services:
(All materials and installations shall be in accordance with the North Carolina Department of Environment and Conservation standards and specifications)
WATER SYSTEM IMPROVEMENTS
WATER TANK – REFURBISH AND INSTALL A SPRAY-ON LINER:
The contractor shall provide and install all required inside and outside piping, controls, access hatch, and ladder as noted on the plans. He shall also provide all labor and materials to install the french drain around the tank. Following completion of all improvements, the contractor shall pressure wash the tank, seal all cracks, and install a new elastomeric polyurethane spray-on liner per the plans and specifications.
WATER TANK ACCESS DRIVE:
The contractor shall provide all labor and materials to construct a new access road, approximately 700 feet long to the existing water tank, as noted on the plans. The final surface of the drive shall be compacted base stone.
WATERLINES:
The contractor shall provide all labor and materials required to install the new 2-inch HDPE pump line and the 4-inch HDPE distribution line in the new access drive. The new lines shall be connected to the new lines coming out of the water tank, and the existing lines located along Heintooga Ridge Road. All valves and fittings shall be provided and installed as noted on the plans and specifications. All installed pipes, valves and fittings shall be pressure tested and disinfected in accordance with the plans and specifications.
WELL REHABILITATIOIN:
The existing well head is in an underground vault and needs to be raised to grade. After raising the well head to grade, a concrete slab shall be poured around it, and an enclosure provided and installed to protect the well. As part of this work the well pump shall be replaced.
AREA RESTORATION:
All areas disturbed by the contractor shall be restored to original condition. Any pavement areas which must be crossed will be removed and replaced to original conditions in accordance with the plans and specifications. Areas outside of paved areas shall be graded, seeded with the approved Park seed mix, and mulched with approved matting. Areas outside of the immediate work area shall not be disturbed.
WASTEWATER SYSTEM IMPROVEMENTS
NEW SEPTIC TANKS AND DRAIN FIELDS:
Contractor shall provide and install new septic tanks, distribution boxes, and drain fields at both comfort stations for the Heintooga Picnic Area per the construction plans. The proposed drain fields will each consist of approximately 800 linear feet of new infiltration chambers or pipe. All clearing and grading necessary for the proposed work shall be included in the scope of work.
DEMOLITION:
The septic tank at the Heintooga Picnic Area shall be pumped dry, and have a bolted lid installed or the existing lid can be welded closed. The sewer lines entering the tank shall be exposed and capped on both sides of the tank – note that the lines are very shallow, and easily exposed.
AREA RESTORATION:
All areas disturbed by the contractor shall be restored to original condition. Any pavement areas which must be crossed will be removed and replaced to original conditions in accordance with the plans and specifications. Areas outside of paved areas shall be graded, seeded with the approved Park seed mix, and mulched with approved matting. Areas outside of the immediate work area shall not be disturbed.
5. Government Furnished Property, Materials & Supplies The GSMNP will not be providing property, materials or supplies for the subject project.
6. Business Hours The contractor shall typically complete on-site work or delivery, including unloading, during normal business hours of 7:30 am to 4:30 pm, Monday through Thursday, excluding weekends and Federal holidays. However, upon coordination with the COR, the contractor may work earlier or later as required. The contractor may also work weekends if necessary, upon coordination with the COR. The contractor shall coordinate the specific on-site work schedule with the Contracting Officer and COR five days prior to performance start date. While on site, the COR may be reached by mobile phone during normal business hours.
7. Management During Normal Working Hours The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure safety of the public and on-time completion of this contract.
8. Maintenance of Traffic Some of the work may be done while the Balsam Mountain Campground and the Heintooga Picnic Area are open and occupied; therefore, the contractor will need to provide traffic control in these areas as necessary. The contractor shall follow the Manual of Uniform Traffic Control Devices (MUTCD) for any traffic control that might be required. The Contractor shall use appropriate traffic control devices needed for all work and for protecting workers and visitors.
One lane closures are allowed, traffic shall be controlled with flaggers and appropriate signage.
Contractor shall provide advance notice if the closure is expected to exceed 10 minutes.
9. Safety & Environmental Compliance The contractor shall comply with pertinent provisions of the Occupational Safety and
Health Act (OSHA), and state, local, safety, laws.
The contractor shall comply with pertinent Environmental Protection Agency laws and regulations.
Contractor shall comply with the requirements of FAR 52.236-7 Permits and responsibilities.
Installed waterlines and sewer lines must pass both a pressure test and/or disinfection test per the project specifications, as applicable.
The GRSM safety officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten Government and contractor employees or damage to Government property.
The contractor shall immediately report to the Contracting Officer, COR and GRSM safety officer all accidents resulting in employee injury or death or damage to property while performing this contract.
10. Insurance The Contractor shall be insured in accordance with the Solicitation documents. The Government is not responsible for damage to Contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The Government will not accept any liability due to contractor employee negligence.
11. Motor Vehicle & Traffic Regulations Contractor employees operating motor vehicles shall possess an appropriate, valid, driver's license. Driver and vehicle permits, licenses, registrations and proof of insurance shall be maintained in the vehicle at all times and made available upon request. Contractor employees shall comply with federal vehicle motor law requiring seat belts be worn at all times. Contractor employees shall adhere to the posted speed limits. Commercial vehicles are prohibited on the Blue Ridge Parkway without prior notification of the Park. Contractor shall contact the Dispatch Office at 865-436-1294 to notify the Park of an incoming commercial vehicle.
12. Statement of Work - Requirements Summary The contractor shall install all proposed waterlines and appurtenances in strict conformance with the requirements outlined in the North Carolina Department of Environmental Quality “Rules Governing Public Water Systems”, Section .0100 – Protection of Public Water Supplies, Subchapter 18C – Water Supplies.
The contractor shall install all proposed wastewater systems and appurtenances in strict conformance with the requirements of the Swain County Health Department, Environmental Health.
13. Maintenance of Roadways Contractor shall show due diligence to ensure that asphalt on roadways and developed parking areas are protected from damage.
14. Gates (N/A) Contractor shall be responsible for ensuring gates are locked at the end of each shift.
1. Contractor shall provide a lock to be used on a joint locking system serving both the Park and the Contractor.
2. Gates shall be closed during the day and at the end of each day.
15. Employee Parking All contractor employees shall comply with parking procedures published for the GRSM.
16. Replacement of Contractor Employee for Security Reasons The Government retains the right to request removal of the contractor’s employee(s), regardless of prior clearances.
17. Non-Payment for Additional Work Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the contractor.
Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.
18. Conflict of Interest The contractor shall not employ off-duty COR’s or other Government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.
19. Quality Control The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure the work performed conforms to the contract requirements. The Statement of Work - Requirements Summary (Section 12) provides requirements for the installation of waterlines, wastewater lines, and appurtenances that are the minimum requirements for the installation of the new water and wastewater systems. The contractor’s QCP shall address methods for remedying any non-compliant work. The Contractor shall develop QCP and submit with proposal package. The Contractor’s QCP includes:
Required services identified in the “Statement of Work - Requirements Summary” Contractor’s surveillance methodology Method and timeframe for responding to COR or customer complaints Progress meetings with Government stakeholders
20. Contractor’s Proposal Package The following deliverables are to be submitted with offer in response to RFQ.
Technical approach to perform required services.
Identification of key personnel to be responsible for the on-site work and their qualifications.
Contractor safety plan.
Contractor’s QCP Proof of Insurance–Business Liability & Workers Compensation.
21. Inspection.
The Government will conduct inspections during and upon completion of required services.
Final payment will be processed upon confirming that all noted contractor performance deficiencies have been satisfactorily corrected.
22. Schedule The Balsam Mountain Campground and the Heintooga Picnic Area are closed from October 4, 2023 to May 13, 2024. Proposed work within the campground and picnic areas shall commence after October 5, 2023. All work on the water tank, well, and wastewater drain fields shall be done while the campground and picnic area are closed. Work shall be complete and operational for use by the Campground by May 13, 2024. Work on the proposed new water tank access road may be done any time, preferably during the warmer, dry months. The contractor shall provide a realistic schedule for the completion of the proposed work; and notify the Park if there is not sufficient time in the schedule prior to accepting the contract.
23. Liquidated Damages (NA)
24. Referenced Documents The Design Plans and Specifications for the “Balsam Mountain Campground/Heintooga Picnic Area - Sewer and Water System Replacement Project”.
25. Base Price Schedule See attachment.
26. Location Map See attachment