A04_SOW_Urgent_Admin_Heat_Coil_Replacement.pdf
PDF 195 KB Posted
- Attached to
- FY22 VAFO URGENT ADMIN HEAT REPAIR
- Solicitation number
- 140P4222Q0016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P4222Q0016_Amd_0002.pdf | ||
| VAFO_201534A_100_CD_Drawings_PDF_0002.pdf | ||
| Sol_140P4222Q0016_Amd_0001.pdf | ||
| Sol_140P4222Q0016.pdf | ||
| B03_Wage_Determination_PA20220083.pdf | ||
| Experience_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work
Replace in-duct heating coils at the Administration Building
Valley Forge National Historical Park
(VAFO)
King of Prussia, PA
Prepared by: James Moore Date:
4/Nov/2021
1) Background
a) This Scope of Work (SOW) is for the VAFO Administration Building located at 1400 N Outer Line Drive, King of Prussia, PA 19406.
b) The administration building was constructed in the late 1960s and has been operating with the original HVAC equipment until a project was completed in 2019 to upgrade the HVAC equipment.
This project only included cleaning of the 5 heating coils. In October of 2021 one of the heating coils was faulting and problems were found with the internal wiring. This unit has been disconnected and is currently not in operation. Another heating coil, the largest of the 5, is functioning on only 2 of the 3 coils. All 5 units to be replaced are past their expected serviceable life and are in need of replacement.
c) The project includes design and replacement of five (5) in-duct heating coils and associated components to include, but not limited to, contactors, transformers, and fuse boxes. Additionally, the new HVAC system is controlled by a Building Automation System (BAS) and the awarded contractor shall be responsible for ensuring proper communication and operation between the new heating coils and the existing BAS system.
d) Attachment(s) provided at the end of this document
i) Attachment A: 2019 HVAC project heating coil schedule
2) Scope
a) Contractor is responsible to field verify all estimated quantities
i) It is STRONGLY encouraged that each bidder visits the site and fully acquaints themselves with the problems and conditions they will encounter if they become the successful bidder. Since absence from visiting the project will not be considered as an excuse for misunderstanding of the requirements of the contract, bidders are strongly encouraged to visit the park and attend the pre-bid site visit(s).
b) This contract requires the independent Contractor, functioning not as an agent of the Government, to provide all personnel, facilities, tools, labor, equipment, supervision, transportation (except as otherwise specified in the Contract), correspondence, supplies, staging and materials necessary to:
i) Replace five (5) in-duct heating coil units and associated components. The schedule of heating coils from the 2019 project is provided toward the end of this document as Attachment A.
Additionally, the new coils must be tied into the existing BAS and ensure proper operation and communication. Contractor must be knowledgeable of and adhere to all federal, state, and local regulations governing the types of work included in this document. Contractor shall plan, schedule, coordinate, and assure effective performance to provide the services required.
3) Objectives
a) The goals of this project are to A) Replace 5 heating units and associated components that are past their serviceable life with new units, sized appropriately to provide adequate heat to the zones they cover. B) Reduce energy consumption through the use of high efficiency components.
4) Tasks and Requirements
a) General
i) The contractor shall be familiar with the requirements stated in this scope of work and meet with the park staff to gain a clear understanding of the design and functional requirements of work desired.
ii) The contractor will confirm existing site conditions and measurements. Drawings, shop drawings, material samples and product submittals related to the proposed work will be prepared and submitted the NPS. NPS approval will be obtained prior to ordering materials.
Work will be executed as described in the approved drawings and submittals.
iii) If any materials encountered during the deconstruction/demolition or construction phase are found to contain lead, asbestos, PCBs, or other harmful substances, they are to be handled and removed or abated in accordance with local, state, and federal laws and requirements concerning hazardous waste.
iv) Contractor(s) and their employees shall not conduct work with or on hazardous materials without proper training, certifications, protective equipment, and required notifications.
v) Contractor(s) shall be licensed in respective jurisdictions. Contractor(s) is solely responsible for measuring and verifying in field, prior to bidding, all existing dimensions, sizes, areas and conditions. Also prior to bidding, Contractor(s) shall investigate and verify nature and extent of work necessary and advise NPS in writing of any discrepancies and/or omissions in requirements.
vi) Contractor shall be responsible for securing any required permits from the state, county or local offices as well as making all required notifications for hazardous material work.
vii) Submit samples, product manufacturer’s information and shop drawings as applicable for NPS review and approval, allowing sufficient time in project schedule for Technical and Compliance reviews. Upon approval, provide and install new replacements, repairs and related work as applicable.
viii) The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW
ix) Any on site storage of materials shall be coordinated with the COR. Store and protect all materials in accordance with manufacturer’s requirements.
x) Erect, establish and maintain safety & security barricades, scaffolding, shoring and ladders sufficient to secure the structures and sites during the course of work and safely perform the work in accordance with all regulations.
xi) The Contractor shall provide proper safety equipment to employees and ensure a safe work environment for employees, the general public, and Government employees at all times. The Contractor shall work to ensure free, unobstructed, and safe access to and about work areas.
xii) Protect, and do not disturb, all existing historic fabric including masonry and walks. The Contractor shall take the measures needed to protect artifacts, historic furnishings, and fabric that are adjacent to work areas. Scaffolding and ladders shall be erected so that no damage is done.
xiii) Any activities that produce flames or sparks will require the submission of a hot work permit to the park’s safety coordinator. Copies of this form will be provided to the contractor and shall be submitted five (5) business days prior to the activity.
xiv) All excavations or digging shall require prior notification of five (5) business days to schedule the archeologist.
xv) No excavations shall be left open overnight. Open holes and trenches are to be covered and the area is to be surrounded with construction fencing.
xvi) Preservation of Natural and Cultural Features: Confine all operations to work limits of the project. Prevent damage to all natural and cultural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants with native seed and/or plants, repairing or replacing materials in-kind if necessary, all at the direction of the CO and at no additional expense to the Government. Do not remove, injure, or destroy trees or other plants without prior approval. Consult with Contracting Officer Representative (COR) and remove only roots and branches that interfere with construction and are approved by the COR.
xvii) Restoration of all ground and areas disturbed in execution of this contract shall be fully restored to original condition, including all grading, seeding (with Park approved native seed mixture), and mulching. Perennial ryegrass is not permitted. Any completed trail surface disturbed as part of this contract shall be restored to original condition.
xviii) Archeological Resources: If any evidence of prehistoric, historic, and recent 20th century artifacts, including charcoal, human bones, ash, fire rocks, and building materials that indicate the presence of past human occupation is encountered during construction, all work in that area shall stop immediately and the discovery shall be reported to the Contracting Officer Representative. The contractor shall coordinate with the parks Archeologist to be on site during excavation(s).
xix) Any damage resulting from Contractor’s operation shall be immediately brought to the attention of the Contracting Officer’s Representative.
xx) Coordinate all work with prevailing weather conditions to Park’s satisfaction.
xxi) The Contractor shall take all necessary and reasonable measures to keep these sites clean of trash and debris. Work areas shall be cleaned immediately as work in that area is completed, and before moving to a new work site. Place all trash and debris in approved containers, remove, and properly dispose of trash off site daily. Keep work site(s) clean on a daily basis.
Any materials that can be recycled must be recycled.
xxii) The Contractor shall remove all materials and equipment, including ladders and scaffolding, from the site(s) at the completion of each day’s operations unless otherwise approved by the Contracting Officer’s Representative.
xxiii) At the completion of all work, the Contractor shall remove all equipment, tools, surplus materials, and shall clean all work areas. The Contractor shall be responsible for providing all tools, supplies, materials, and labor necessary for cleanup.
xxiv) Demolition materials shall become the property of the Contractor. Dispose of all removed materials in accordance with local regulation and best practices.
xxv) Hauling Restrictions: Comply with all legal load restrictions in the hauling of materials. Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.
xxvi) Existing Utilities: Contractor shall be permitted to use existing electric and water services located on the site.
xxvii) Building surfaces that have been altered for the installation of system equipment shall be refinished to match original condition by skilled personnel of the trades involved at no additional expense to the Government. No structural members shall be cut or altered without prior approval of the Contracting Officer’s Representative. Any damage resulting from Contractor’s operations shall be immediately brought to the attention of the COR.
xxviii) The contractor shall be responsible for the documentation of all efforts to include design drawings, shop drawings, product submittals, licensing agreements, quality control documents, material testing results, permitting, and all other documentation associated with the project.
xxix) Any design drawings or shop drawings of the proposed work will be prepared using an electronic drawing program such as AutoCAD or similar. Drawings will be scaled and contain detail sufficient to communicate the intent of the designer and permit a thorough and detailed on-site inspection of the work by NPS inspectors. Hand drawn sketches of the proposed work are not acceptable shop drawings and will be rejected without review. Product submittals may be cut sheets but must clearly indicate and highlight the specific item to be used. Product submittals that do not indicate and highlight the specific item to be approved will be rejected without review.
xxx) All work, including those elements that are typically hidden from normal view or inspection, shall be installed in a neat and workmanlike manner.
xxxi) Upon completion of all work and demobilization of equipment and materials the contractor shall remove all construction associated debris and equipment from the work site, repair any damage to adjacent structures and reseed damaged lawn areas affected by the work.
xxxii) Codes, Regulations and Standards
(1) The NPS requires that all work be performed to all applicable codes, regulations and standards. These codes include, but are not limited to:
(a) International Building Code
(b) Secretary of the Interior’s Standards for the Treatment of Historic Properties
(c) Uniform Mechanical Code
(d) 40 CFR 745.61-339, U.S. Environmental Protection Agency-LEAD-BASED PAINT
POISONING PREVENTION IN CERTAIN RESIDENTIAL STRUCTURES
(e) 29 CFR 1926.62, U.S. Department of Labor, OSHA-SAFETY AND HEALTH REGULATION
FOR CONSTRUCTION, LEAD
(f) Title 35 Pennsylvania Statue Chapter 203, Department of Labor—LEAD-BASE PAINT
OCCUPATION ACCREDITATION AND CERTIFICATION
(g) Title 25 Pennsylvania Consolidated Statue Chapters 260-270, Department of
Environmental Protection—HAZARDOUS WASTE
(h) NESHAP, 40 CFR Part 61, Subpart M
(i) 49 CFR Part 171 and 172
(j) OSHA Construction Standards, 29 CFR 1926.1101
(k) EPA Worker Protection Rule, 40 CFR Part 763, Subpart G Pennsylvania Department of
Labor and Industry (PA DLI), Asbestos Occupations Accreditation and Certification Act of 1990 (Act 194 and Act161)
(l) USEPA 40.CFR Part 61
(m) OSHA Standards 29 CFR 1910.1001 Asbestos in General Industry
b) Heating Coil replacement
i) This project will consist of the design and installation of properly sized heating coils to replace the five (5) existing units that have begun to fail and are outside of their serviceable life. The project will include, but not be limited to, the following:
(1) Demolish and remove the five (5) existing heating coils (3 in the basement mechanical room, 1 in the basement storage closet, and 1 in above a first-floor office) and components;
(a) Demolish all areas as required per the approved design and to accommodate the new units.
(i) This includes, but is not limited to, heating coils, contactors, transformers, fuse boxes and other components directly associated to the heating coils and their operation.
(b) Dispose of all equipment and materials according to state, local and federal laws
(2) Supply and install all materials and components.
(a) The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the work as defined in this Scope of Work. Any items not specifically noted, but necessary for performance in accordance with accepted industry standards, shall be furnished under this contract. The contractor shall perform to the standards of the industry and as found in this contract.
(b) Supply and install all components of the new heating coils per the existing conditions, approved materials, manufacturer instructions, and industry standards.
(c) Make all repairs to the structure to correct any wall, ceiling and floor penetrations required for the installation of the work per the approved design documents
(i) Ensure all repairs meet the Secretary of the Interior’s Standards for the Treatment of Historic Properties.
(ii) All repairs shall be painted to match existing, adjacent, surfaces.
1. Painting shall include 1 coat of primer and 2 coats of paint.
(iii) All repairs shall be performed with in-kind materials
1. Method and materials for repairs are to be approved by the park.
(3) Test and balance the new system
(a) Provide the COR with copies of all test results and all system check and startup checklists
(b) Test the new equipment to ensure all components are operating as designed and intended and ensure proper air flow and temperatures to the system and throughout the building.
(4) Provide training to park staff on how to operate and maintain the new equipment as well as the communications with the BAS.
(a) Two (2) separate training sessions shall be required for up to five (5) park staff members each.
c) Contractor, subcontractor and personnel requirements
i) General contractor (Contractor that is awarded the contract) shall have experience in the successful completion of projects of similar scope, size and complexity that followed the Secretary of the Interior’s Standards for the Treatment of Historic Properties on significant portions or parts of the work as demonstrated below.
(1) Minimum firm qualification for the Contractor is five (5) years of experience demonstrated by the successful completion of a minimum of three (3) projects of similar scope, size and complexity in the last five (5) years that followed the Secretary of the Interior’s Standards for the Treatment of Historic Properties on significant portions or parts of the work.
(2) Provide a list of projects of similar scope, size and complexity involving historic buildings completed in the last five (5) years. Provide a brief description including up to three (3) photographs of each of three (3) projects of similar scope, size and complexity completed in the past five (5) years that followed the Secretary of the Interior’s Standards for the Treatment of Historic Properties on significant portions or parts of the work.
ii) Site Superintendent shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the superintendent is absent shall be designated in writing to the contracting officer. The site superintendent or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The site superintendent shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The site superintendent, or alternate, shall be present on site at all times when the contractor’s employees or their subcontractors are working.
(1) The Site Superintendent must have a minimum of (5) five years of experience in construction field; at least (2) two years of managing construction work crews. The Job Superintendent must have a demonstrated experience in working with historic buildings with a minimum of (3) three projects that followed the Secretary of the Interior’s Standards for the Treatment of Historic Properties on significant portions or parts of the work.
(2) Provide a list of (3) three projects that followed the Secretary of the Interior’s Standards for the Treatment of Historic Properties on significant portions or parts of the work that the Superintendent has worked on during his or her career. At least one (1) of the projects submitted must be one that he or she served as superintendent of the work.
iii) Crew Leader(s) shall be provided for each trade utilized for the project. Should the site superintendent possess the qualifications required of the crew leader for a specific trade, they may act as the crew leader for those trades.
(1) HVAC
(a) Minimum of five (5) years of experience in HVAC.
(b) Minimum of two (2) projects of similar scope, size and complexity in the past three (3) years
(c) Provide a list of two (2) projects that followed the Secretary of the Interior’s Standards for the Treatment of Historic Properties on significant portions or parts of the work that the contractor has worked on.
5) Delivery
a) The contractor shall develop and submit a Quality Control Plan (QCP) that implements procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which they assure themselves that their work complies with the requirements of the contract. After acceptance of the QCP, the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed changes to their QC system. A revised copy of the QCP shall be submitted to the COR within five (5) working days when changes are made thereafter.
b) Daily reports, signed by the contractor, shall be consolidated and submitted to the COR weekly.
Project management submittals will be submitted and approved as indicated on the Transmittal Register. Product submittals will be approved in advance of procurement and installation.
6) Government-Furnished Property
a) Services
i) An NPS archeologist will prepare test pits prior to any disturbance of soils or monitor any digging and excavations while occurring at no cost to the contractor. The contractor is responsible for notifying the COR, at least, 5 business days in advance of any ground disturbance to schedule the archeologist.
ii) The COR will work with the contractor to establish allowable areas for disturbance to the structure and finishes.
iii) The Government shall supply no other service to the contractor.
b) Facilities
i) The government will provide no facilities to the Contractor. A staging area will be designated for the contractors use.
c) Utilities
i) The Government will provide access to water and electricity. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish appropriate work tasks. Toilet facilities will not be provided to the Contractor.
d) Equipment
i) The Government will provide no equipment to the contractor.
7) Place of Performance
a) All work shall be performed within the Valley Forge National Historical Park at the following location:
i) Administration building: 1400 N Outer Line Drive, King of Prussia, PA 19406
8) Period of Performance
a) A non-mandatory pre-bid site meeting will be schedule by the Contracting Officer. It is STRONGLY encouraged that each bidder visits the site and fully acquaints themselves with the problems and conditions they will encounter if they become the successful bidder. Since absence from visiting the project will not be considered as an excuse for misunderstanding of the requirements of the contract, bidders are strongly encouraged to visit the park and attend the pre-bid site visit(s).
b) The period of performance shall be three (3) weeks from the Notice to Proceed.
c) Recognized Holidays:
i) The contractor is not authorized to work at the site on Federal Holidays or weekends unless specifically authorized in writing by the NPS Contracting Officer. Requests to work over a holiday or weekend must be received no less than 5 working days prior to the holiday.
d) Hours of Operation:
i) The contractor is responsible for conducting business at the site between the hours of 7:00 am to 3:30 pm Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Work outside of these hours will not routinely be approved and must be requested with the Park and COR no less than 5 days prior.
Attachment A
Prepared by: James Moore Date: 4/Nov/2021