Statement of Work Summary
This is a Statement of Work and Specifications document from the Bureau of Land Management (BLM) Albuquerque District Office – Socorro Field Office for the procurement and installation of one ADA-compliant precast concrete double-vault toilet building at Datil Well Campground, located approximately 60 miles west of Socorro, New Mexico. The project is classified as a Commercial item supply contract with incidental installation services. The new structure must measure 11' 11" x 14' 4" and include specific features: BARNWOOD wall texture with OATMEAL BUFF color, CEDAR SHAKE roof texture with RICH EARTH color, gabel roof, standard 3068 steel door, wall vent, solar light kit, solar fan kit, grab bars for ADA compliance, and a paint touch-up kit in two-tone colors. The contractor is responsible for all transportation, site preparation equipment, lifting and rigging equipment, offloading configuration planning (due minimum four weeks prior to delivery), installation, backfill, and site recontouring at the designated location. The BLM will provide roadway access allowing standard over-the-road semi-trailer and crane parking within 2 feet of the pad and will clear 16 feet of height free from tree limbs and power lines.
Payment is structured as a single line item for "Delivery, Site Prep and Installation of Structure with backfill and recontour of site," which includes all transportation, delivery, site preparation, installation, backfill, and recontouring work. The contractor must submit detailed offload configuration options minimum four weeks prior to delivery and provide a detailed specification sheet of the product. The project location is accessible via US Highway 60, with driving directions from Interstate-25 Exit 147 at Socorro (coordinates: 34.154286, -107.858093). Comprehensive technical drawings and site plans are included, showing floor plans, elevations, cross-sections, and site layout details for the installation area within the Datil Well Recreation Area Campground.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLM SFO Precast Double Vault Toilet
Bureau of Land Management
Socorro Field Office
Precast Concrete ADA Double Vault Toilet
Statement of Work and Specifications
Bureau of Land Management
Albuquerque District Office - Socorro Field Office
1. Project Information
A. Intent of Project
The Bureau of Land Management (BLM) Albuquerque District Office (ADO) - Socorro Field Office
(SFO), intends to contract purchase and installation of one ADA double-vault precast concrete toilet building. The new building shall match or exceed the size, materials, durability, and functional characteristics of the as outlined below for the Datil Well Campground site. The Contractor shall transport and install the new building in accordance with applicable regulations. This is a
Commercial item supply contract, and installation is incidental to supply.
Please refer to the drawings and maps for details. The Datil Well Campground can be accessed from
US Hwy 60, approximately 60 miles west of Interstate I-25 at Socorro, New Mexico. Datil Well
Recreation Area Campground - New Mexico | Bureau of Land Management (34.154286, -
107.858093)
2. New ADA Double Vault Toilet Precast Building
A. Building Specifications
1. 11’ 11” x 14’ 4”, ADA double vault toilet precast building, without chase.
2. The building wall texture shall be BARNWOOD, and the roof texture shall be the
CEDAR SHAKE. The building wall color shall be OATMEAL BUFF & roof Color shall be RICH EARTH.
3. ADA compliant, with grab bars
4. One way transportation - installation and set up by contractor.
5. Site Prep and Installation to include backfill by the contractor.
6. Paint touch-up kit, two tone color OATMEAL BUFF & RICH EARTH
7. Gabel Roof
8. Standard 3068 Steel Door
9. Wall Vent
10. Solar Light Kit
11. Solar Fan Kit
B. Requirements
1. The new ADA double-vault precast toilet building shall be located within the Datil
Well Campground recreation site.
2. The Contractor shall be responsible for site prep, installation, backfill and recontour of the new Double Vault Toilet Precast Building at the designated location set forth by the BLM. (See Map for Details) The contractor shall comply with all State and
Federal Laws during the performance of work.
3. The Contractor shall provide all site prep equipment, all lifting equipment and rigging needed for the installation of the new ADA Double Vault Toilet Precast
Building.
4. A minimum of four (4) weeks prior to the delivery of the ADA Double Vault Toilet
Precast Building, the contractor shall provide the BLM with detailed offload https://www.blm.gov/visit/datil-well-recreation-area-campground https://www.blm.gov/visit/datil-well-recreation-area-campground configuration options. Work shall consist of providing and installing One (1) ADA
Double Vault Toilet Precast by the contractor.
3. Work Provided by Government
A. Description
1. The BLM will provide access/roadway to site so that standard over the road semi and trailer and crane can navigate and park within 2’ of pad.
2. The BLM will clear height of 16’ free from tree limbs and power lines.
4. Payment
A. Basis of Payment
Pay Item
Delivery, Site Prep and Installation of
Structure with backfill and recontour of site.
B. Work included in Payment
The Bureau of Land Management will consider the following work as paid:
1. Transportation, delivery, site prep, and installation of the new ADA Double vault toilet to the specified location.
2. Backfill and recontour of installation site.
5. Provide a detailed specification sheet of the product
Cibola National Forest
33 34 36
3 2
9 10 11
14 13
21 22 23 24
T02S
R10W
£¤60
¬«12
BLM Datil Well Campground Vault toilet (d35ouble vault)
0 0.25 0.5 0.75 1 Miles
User: jfassett Saved: 6/20/2017 09:13 Printed: 11/6/2014 10:45 Coordinate System: NAD 1983 Albers Projection: Albers Datum: North American 1983 Scale 1:24,000 Units: Meter No warranty is made by the Bureau of Land
Management as to the accuracy, reliability, or completeness of these data for individual or aggregate use with other data. Original data were compiled from various sources and may be updated without notification.
Location Map
N _̂ Cities
County
TOWNSHIP
SECTION
US Hwy
State Hwy
BLM
Private State
USFS
MXD: V:\personal_dirs\jfassett\Contracting\2017\BLM Datil Well Campground Group Site Vault toilet.mxd
Driving Directions:
From Interstate-25 take Exit 147 at Socorro, NM.
Go west on US Hwy 60 approximately 63 miles.
Datil Well Campground entrance is 1 mile NW of Datil, NM.
Follow the one-way campground loop road to vault locations.
kj 107 51'9.79"W 34 9'15.38"N
| A04 SFO Datil CG Vault Toilet SOW Spec_s revised.pdf |
| SFO Datil Well Campground Addition Drawings_FINAL_2026-01-27.pdf |
| pg1.pdf |
| pg2.pdf |
| pg3.pdf |
| pg4.pdf |
| pg5.pdf |
| pg6.pdf |
SFO Datil Well Campground Vault toilet MAP.pdf
File details come from the government source that posted it. Updated .