This package includes a statement of work, drawings, and bid schedule for safety and energy efficiency retrofits at the Bureau of Land Management Malta Field Office in Montana. The statement of work outlines eight bid items for projects including retrofitting overhead doors with safety sensors, replacing three overhead doors and operators, installing battery backups for a carbon monoxide detection system, replacing a surge protector, and retrofitting fluorescent lighting with LEDs in two buildings. Drawings depict the layouts of the buildings and locations for light fixtures, sensors, outlets and other project details. Bidders are required to provide lump sum pricing for labor, equipment and materials to complete the specified work in accordance with state and national electrical codes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2023 SAFETY & ENERGY EFFICIENCY
RETROFITS
BUREAU OF LAND MANAGEMENT
MALTA FIELD OFFICE
PHILLIPS COUNTY, MONTANA
STATEMENT OF WORK
AND
DRAWINGS
PREPARED FOR
BUREAU OF LAND MANAGEMENT
MALTA FIELD OFFICE
501 SOUTH 2ND STREET EAST
MALTA, MT 59538
THIS PAGE IS INTENTIONALLY LEFT BLANK
2023 Malta Field Office Safety & Energy Efficiency Retrofits Table of Contents 4/28/2023
TABLE 0F CONTENTS
Documents included in this Package:
1. STATEMENT OF WORK
2. WORK DATA SHEET
3. DRAWINGS
a. Sheet 1: TITLE SHEET
b. Sheet 2: LU BUILDING PLAN VIEW
c. Sheet 3: STEEL WAREHOUSE PLAN VIEW
4. BID SCHEDULE – Bound Separately
2023 Malta Field Office Safety & Energy Efficiency Retrofits Table of Contents 4/28/2023
2023 Malta FO Safety & Energy Efficiency Retrofits Statement of Work 4/28/2023 Page 1
Bureau of Land Management, North Central Montana District Malta Field Office
Statement of Work
2023 Malta Field Office Safety and Energy Efficiency Retrofits:
Location:
Bureau of Land Management (BLM), Malta Field Office Administrative Site Wareyard 501 South Second Street East, Malta, MT 59538
Description of Work:
The BLM Malta Field Office is soliciting proposals to furnish labor, equipment, supplies, and materials to complete the following work as described below (consisting of a total of 8 Bid Items):
Bid Item No.:
1) Retrofit two existing overhead door operators with commercial-grade safety photoelectric sensor systems. These safety systems with infrared sensors shall automatically stop the lowering action of the door and reverse operation when an obstruction is encountered. Shall meet UL 325-2010 safety standard requirements. Mount sensors with heavy-duty brackets.
a. OH Door 1: Existing Door Size: 14’-0” wide x 9’-11” high. Existing door jambs are steel framed. Existing Operator: LiftMaster model T5011L (VER2) serial No. 342-A2-89849 ½ HP motor. See Steel Warehouse Plan View drawing for location.
b. OH Door 2: Existing Door Size: 14’-2” wide x 10’-5” high. Existing door jambs are steel framed. Existing Operator: Windsor Door Division (CECO) model BT-10-311 serial No.
2848016 1/3 HP motor. See Steel Warehouse Plan View drawing for location.
2) OH Door 3: Replace existing exterior overhead door and electric operator with new. Existing Door Size: 11’-5” wide x 11’-7” high. Existing door jambs are wood framed. Existing Operator:
LiftMaster model MT5011U E79930 serial No. 2017N5844 ½ HP motor. See LU Building Plan View drawing for location.
a. New Door: Furnish and install a quality commercial overhead sectional insulated steel sandwich door of flush design according to ANSI/DASMA 102-2018 standards. Install door, track, and operating equipment complete with necessary hardware, anchors, inserts, hangers, and equipment supports.
i. The door shall be energy efficient polyurethane insulated with an R-value of 17 or greater.
ii. Tracks and supports shall be galvanized steel, sized for door size and weight.
4/28/2023 Page 2
iii. Hardware shall be heavy-duty, corrosion-resistant, with hot-dip galvanized, stainless-steel, or other corrosion-resistant fasteners, to suit door type.
iv. Include one row of three or four thermal pane door window lites.
v. Install perimeter weatherstripping: adjustable at jambs and top, contact resilient at bottom.
vi. Adjust door assembly to smooth operation and in full contact with weatherstripping.
b. New Electric Operator: Furnish and install a UL listed commercial ½ HP Jackshaft operator (LiftMaster J Industrial-Duty or equivalent). Shall be manually operable in case of power failure. Shall meet UL 325-2010 safety standard requirements.
i. Include a commercial-grade photoelectric sensor safety device with heavy-duty brackets, an interior three-button control station, a wireless keypad entry, and two remote controls.
3) OH Door 4: Replace existing electric operator with new. Existing Door Size: 10’-0” wide x 9’-2” high. Existing door jambs are wood framed. Existing Operator: Do-It (Chamberlain) part No.
41A3627 D.O.C. Cert. No. K710 FCC ID HBW1D3605 ½ HP motor. See LU Building Plan View drawing for location.
a. New Electric Operator: Furnish and install a UL listed commercial ½ HP Jackshaft operator (LiftMaster J Industrial-Duty or equivalent). Shall be manually operable in case of power failure. Shall meet UL 325-2010 safety standard requirements.
i. Include a commercial-grade photoelectric sensor safety device with heavy-duty brackets, an interior three-button control station, a wireless keypad entry, and two remote controls.
4) Furnish and install two 12VDC/12AH rechargeable stand-by batteries for the existing Altronix AL1024ULX power supply/charger with 115VAC 60Hz, 4.4-amp input and 24VDC @ 8-amp standby supply current with 10 amp during alarm output. Batteries shall be sealed lead acid or gel-type batteries and fit within the existing Altronix panel enclosure. Altronix panel enclosure dimensions are 12.2” wide x 15.5” high x 4.5” deep. This Altronix power supply provides power to an existing carbon monoxide detector system. See Steel Warehouse Plan View drawing for location. Recalibrate and test CO detection system following battery installation.
5) Replace an existing failed electrical surge protector with equal new. Existing surge protector is Square D by Schneider Electric TVS1HWA10X SurgeLogic: HWA SPD 120/240V VAC Voltage Rating; Single phase, 3 wire, 100kA; 50/60 Hz Frequency Rating; Outdoor rating; NEMA 4X Enclosure. See LU Building Plan View drawing for location.
4/28/2023 Page 3
6) Retrofit existing fluorescent lighting system in the LU Building to LED lighting. See LU Building
Plan View drawing for locations and layout of existing light fixtures. Retrofit as follows:
a. The LU Building has a total of 51 existing fluorescent light fixtures. All fixtures are 4 feet in length. 49 fixtures have 2 tubes, and 2 fixtures have 4 tubes (106 tubes total). Height from floor to fixture ranges from 8 feet to 13 feet (average height = 11’-2”).
b. Replace all fluorescent tubes in existing fixtures with LEDs. Remove ballasts from all fixtures.
c. LEDs shall be 4-foot T8 Type B Ballast Bypass bulbs; minimum 18 watts; 5000K.
d. Furnish and install ceiling-mount low voltage 360° occupancy sensors at 3 locations in the shop area, as shown on the LU Building Plan View drawing. Mounting height approximately 10 feet.
e. Furnish and install an HOA (Hand-Off-Auto) selector switch near Branch Circuit Panel No.
2. This switch shall be installed and set up to control the lighting system in the main shop area of the LU Building. See LU Building Plan View drawing for location.
f. Test existing lighting occupancy sensors in all rooms and replace as necessary to full functionality.
7) Furnish and install electrical outlets on the exterior walls of the LU Building with locations as shown on the LU Building Plan View drawing (four outlets total).
a. Use exterior-grade, two-gang electrical outlets with standard 120V power plugs and weatherproof metal cover at each location.
8) Retrofit existing fluorescent lighting system in the Steel Warehouse to LED lighting. See Steel Warehouse Plan View drawing for locations and layout of existing light fixtures. Retrofit are as follows:
a. The Steel Warehouse has a total of 23 existing fluorescent light fixtures. All fixtures are 4 feet in length and have 2 tubes (46 tubes total). Heights of existing fixtures: 16 lights at 17’ high; 5 lights at 12.5’ high; 2 lights at 8.5’ high.
b. Replace all fluorescent tubes in existing fixtures with LEDs. Remove ballasts from all fixtures.
c. LEDs shall be 4-foot T8 Type B Ballast Bypass bulbs; minimum 18 watts; 5000K.
4/28/2023 Page 4
d. Test existing line voltage wall-mount occupancy sensors in all rooms and replace as necessary to full functionality.
e. Furnish and install a new wall-mount occupancy sensor at west end of parking garage to control west half of lights in parking area. See location on the Steel Warehouse Plan View drawing.
Quality Assurance:
Codes and Standards: The work shall comply with codes and standards applicable to each type of work to be completed.
All electrical work shall be performed in strict compliance with the current edition of the NFPA 70, National Electrical Code 202. All work shall be performed by an electrician currently licensed in the state of Montana.
Material and equipment shall be installed according to the manufacturer's instructions.
Test and adjust all controls and safeties.
Basis of Payment:
Payment: Payment for all mobilization, labor, equipment, supplies, and materials necessary to complete each Bid Item shall be included in the Lump Sum (LS) price of each Bid Item.
2023 Malta FO Safety & Energy Efficiency Retrofits WORK DATA SHEET 4/28/2023 Page 1 of 1
WORK DATA SHEET
2023 Malta Field Office Safety & Energy Efficiency Retrofits
Bid Item
Location
Estimated Quantities
Totals
1 Steel Warehouse
New Automatic Stop Sensor for OH Door 1 New Automatic Stop Sensor for OH Door 2
2 LU Building New OH Door 3 New Jackshaft Operator for OH Door 3 New Automatic Stop Sensor for OH Door 1 Add Wireless Keypad Entry Remote Controls
3 LU Building New Jackshaft Operator for OH Door 4 New Automatic Stop Sensor for OH Door 1 Add Wireless Keypad Entry Remote Controls
4 Steel Warehouse
New Battery Backup for CO Sensor 1
5 LU Building New Surge Protector 1 6 LU Building Retrofit Fluorescent Light Fixtures
New LED Tubes New Ceiling-Mount Occupancy Sensors New HOA Selector Switch
7 LU Building Two-Gang Exterior 120V Outlets 4 8 Steel
Warehouse Retrofit Fluorescent Light Fixtures New LED Tubes Replace Wall-Mount Occupancy Sensors New Wall-Mount Occupancy Sensors
UNPAVED
WAREYARD
PAVED
GRAVEL PARKING LOT
PAVED PARKING LOT
SOUTH SECOND STREET EAST
S O
U T
H
F
I F
T H
A
V E
N U
E
E
A S
T
S O
U T
H F
IR
S
T S
T R
E E
T E
A S
T
GRAVEL ALLEY
GATE
GATE
WALK-IN GATE
BOULEVARD
GATE
STEEL
BUILDING
LU
OFFICE
BUILDING
WAREHOUSE
LU BUILDING
STEEL WAREHOUSE
WAREYARD
CHAIN LINK
FENCE
Malta Field Office - Administrative Site
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
U.S. DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AUTOCAD NAME:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGN OFFICE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MALTA FIELD OFFICE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text 2023 MaFO Safety & Energy Efficiency Retrofits.dwg
AutoCAD SHX Text
MALTA FIELD OFFICE
AutoCAD SHX Text Roger Solberg
AutoCAD SHX Text Roger Solberg
AutoCAD SHX Text 3/16/2023
AutoCAD SHX Text
MARK
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text
2023 SAFETY & ENERGY EFFICIENCY RETROFITS
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text 3/16/2023
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text
MONTANA
AutoCAD SHX Text U.
AutoCAD SHX Text S.
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text T
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text M
AutoCAD SHX Text a
AutoCAD SHX Text r
AutoCAD SHX Text c
AutoCAD SHX Text h
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2023 Safety and Energy Efficiency Retrofits
AutoCAD SHX Text Phillips County, Montana
AutoCAD SHX Text
MALTA FIELD OFFICE
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
%%UDRAWING INDEX
AutoCAD SHX Text
STEEL WAREHOUSE PLAN VIEW
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
LU BUILDING PLAN VIEW
26.7'
10.5'
Branch Circuit
Panel No. 1
Main Distribution Panel
Branch Circuit
Panel No. 2
49.7'
Branch Circuit
Panel No. 3
Bid Item Keyed Notes:
Bid Item 2: OH Door 3:
Replace door and operator
Bid Item 3: OH Door 4:
Replace operator
Bid Item 5: Replace Surge
Protector
Bid Item 6: LED Lighting
Retrofit
( Typical light fixture)
Bid Item 6.d: Ceiling-Mount
Occupancy Sensors
(3 Locations)
Bid Item 6.e: HOA Selector
Switch
Bid Item 7: Install Exterior
Electrical Outlets
(4 Locations)
General Notes:
1. All work shall be performed in strict compliance with the current edition of the NFPA 70, National Electrical Code.
2. All work shall be performed by an electrician currently licensed in the state of Montana.
3. Material & equipment shall be installed according to the manufacturer's instructions.
Typical
51 Total Fixtures
OH Door
OH Door
6d
Typical
3 locations
6d
6e
6e
6a
6a
AutoCAD SHX Text LU BUILDING PLAN VIEW Not to Scale
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
U.S. DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AUTOCAD NAME:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGN OFFICE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MALTA FIELD OFFICE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text 2023 MaFO Safety & Energy Efficiency Retrofits.dwg
AutoCAD SHX Text
MALTA FIELD OFFICE
AutoCAD SHX Text Roger Solberg
AutoCAD SHX Text Roger Solberg
AutoCAD SHX Text 3/16/2023
AutoCAD SHX Text
MARK
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
LU BUILDING PLAN VIEW
AutoCAD SHX Text
2023 SAFETY & ENERGY EFFICIENCY RETROFITS
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text 3/16/2023
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
MONTANA
100.1'
60.2'
30.1'
20.0'
Typ.
Bid Item Keyed Notes:
Bid Item 1.a: OH Door 1:
Add Automatic Stop
Sensors
Bid Item 1.b: OH Door 2:
Add Automatic Stop
Sensors
Bid Item 4: Install Battery
Backup for CO Sensor
Bid Item 8: LED Lighting
Retrofit
( Typical light fixture)
Bid Item 8e: Add wall-mount occupancy sensor
1b
1b
Typical
23 Total Fixtures
1a
1a
OH Door
OH Door
Roof
Ridgeline
8e
8e
8a
8a
AutoCAD SHX Text STEEL WAREHOUSE PLAN VIEW Not to Scale
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text
U.S. DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
APPROVED BY:
AutoCAD SHX Text
AUTOCAD NAME:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
DESIGN OFFICE:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MALTA FIELD OFFICE
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text 2023 MaFO Safety & Energy Efficiency Retrofits.dwg
AutoCAD SHX Text
MALTA FIELD OFFICE
AutoCAD SHX Text Roger Solberg
AutoCAD SHX Text Roger Solberg
AutoCAD SHX Text 3/16/2023
AutoCAD SHX Text
MARK
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
STEEL WAREHOUSE PLAN VIEW
AutoCAD SHX Text
2023 SAFETY & ENERGY EFFICIENCY RETROFITS
AutoCAD SHX Text
UNITED STATES DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
BUREAU OF LAND MANAGEMENT
AutoCAD SHX Text 3/16/2023
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
AutoCAD SHX Text X
MONTANA
| Cover_2023 Malta FO Safety & Energy Efficiency Retrofits.pdf |
| Table of Contents_2023 Malta FO Safety & Energy Efficiency Retrofits.pdf |
| SOW_Malta FO Safety & Energy Efficiency Retrofits.pdf |
| Work Data_Malta FO Safety & Energy Efficiency Retrofits.pdf |
| BLANK.pdf |
| title sheet.pdf |
| Sheets and Views |
| 2023 MaFO Safety & Energy Efficiency Retrofits-TITLE SHEET |
| BLANK.pdf |
| lu building.pdf |
| Sheets and Views |
| 2023 MaFO Safety & Energy Efficiency Retrofits-LU BUILDING PLAN VIEW |
| BLANK.pdf |
| steel warehouse.pdf |
| Sheets and Views |
| 2023 MaFO Safety & Energy Efficiency Retrofits-STEEL WAREHOUSE PLAN VIEW |
BLANK.pdf
File details come from the government source that posted it. Updated .