This is a Statement of Work (SOW) for roof replacement services at Garage #18, Springfield Armory National Historic Site (SPAR) in Springfield, Massachusetts. The project is being procured by the Department of the Interior National Park Service Northeast Region under solicitation number 140P4326R0027.

The SOW specifies complete roof replacement on the garage structure, requiring the contractor to remove the existing roof system and install a new roof that meets current building codes and historic preservation standards applicable to the National Historic Site. The contractor is responsible for all labor, materials, equipment, and disposal of debris associated with the project. Work must be performed in accordance with the National Park Service standards and any applicable local building regulations. The SOW establishes the scope of work, performance requirements, and quality standards but does not include specific response deadlines, award dates, or pricing information within this document. Additional details regarding submission requirements, evaluation criteria, and contract terms would be contained in the associated solicitation documents and any pricing sheets or forms issued separately.

View the file

Other files

File Type Posted
B09-Amd3-RFI_5-25_0003.docx DOCX document
Sol_140P4326R0027_Amd_0003.pdf PDF
B11_Pre-Bid_Site_Visit_Sign-In_Sheet_0002.docx DOCX document
Sol_140P4326R0027_Amd_0002.pdf PDF
B09-Amd2-RFIs_1-3_clarification_0002.docx DOCX document
Sol_140P4326R0027_Amd_0001.pdf PDF
B09-Amd1-RFIs_1-4_0001.docx DOCX document
Sol_140P4326R0027.pdf PDF
B03-WD-MA20260003-5_18_26.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope / Statement of Work (SOW)

Replace Roof on Garage

Springfield Armory NHS/ Garage (Building 18)

Date: April 02, 2026

Cyclic Replacement of Garage Roof Springfield Armory NHS / Garage (Building 18)

PROJECT DESCRIPTION/SUMMARY:

This project involves the removal and replacement of approximately 600 square feet of existing roofing and associated components on Garage Building #18, originally constructed in 1930, located on the grounds of the Springfield Armory National Historic Site. The current roofing system has experienced significant deterioration due to prolonged exposure to weather conditions, resulting in persistent leakage and structural wear.

Previous efforts to address these issues have consisted of multiple short-term, cyclical repairs; however, these temporary fixes have not provided a lasting solution. This project aims to fully replace the existing roof system to restore the building’s integrity and prevent further damage. Upon completion, a structured cyclic maintenance plan will be implemented to ensure longevity and continued performance of the new roofing system.

OBJECTIVES:

The intent of this project is to safely remove approximately 600 square feet of deteriorated roofing and associated components from Garage Building #18 and eliminate ongoing water infiltration caused by prolonged weather-related damage and repeated temporary repairs. The project will install a new, durable roofing system that is appropriate for the building’s age, function, and historic setting, thereby improving its overall structural integrity and resistance to the elements. In doing so, the project seeks to replace the current cycle of short-term patchwork repairs with a long-term, sustainable solution. Additionally, a planned cyclic maintenance program will be established and implemented to preserve the new roofing system, extend its service life, and ensure the continued protection of this historic asset in accordance with preservation best practices.

BACKGROUND:

The existing roof has failed over time causing uplifting, cracking and pieces falling off. This is causing both a safety hazard and structural issue of the garage. This then has potential to affect equipment stored in garage space.

GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/OTHER:

0. Not Applicable

SPECIAL CONDITIONS / REQUIREMENTS:

0. NPS staff must escort contractor personnel while working in these locations. Advance scheduling is imperative to coordinate proper staffing availability.

PLACE OF PERFORMANCE:

0. Springfield Armory National Historic Site

0. Garage, Building 18

0. Springfield, Massachusetts.

PERFORMANCE PERIOD / SCHEDULE REQUIREMENTS:

0. All on-site work must be completed within 90-days from Notice to Proceed.