A04__SOW_Replace_Two_Degassing_Pumps.pdf
PDF 115 KB Posted
- Attached to
- UT-JONES HOLE NFH- DEGASSING PUMP REPLACEMENT Federal contract opportunity
- Solicitation number
- 140FS225Q0064
About this file
This Statement of Work (SOW) outlines requirements for replacing two Folsom degassing pumps at Jones Hole National Fish Hatchery in Vernal, UT. The project involves delivering two Folsom 5 horsepower Simflo pumps (model OLS-PA7LX-1) that pump spring water through nitrogen degassing columns for fish health and safety.
The contractor must be a certified Folsom Pumps supplier and complete the work by April 1, 2025. The pumps must match specific requirements including: 20-degree colleted impellers, belled suction with standard basket strainer, 10" standard duty SPI flanged column, 1-1/4" line shaft, and Chesterton 155 mechanical seal. The motors must be 5 hp, VHS, TEFC, 1,770 rpm, with clockwise rotation. Performance specifications include 1,208 gpm x 6.08' @ 1,770 rpm bowl performance and 90-inch total pump length. The government will provide restrooms, electricity and water during installation. Quality control must meet industry standards, and final acceptance requires approval from U.S. Fish and Wildlife Service representatives.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B03_Wage_Determination_Uintah_County__UT_2015-5497.pdf | ||
| Sol_140FS225Q0064.pdf | ||
| Photos_of_Pumps.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Service
Replacement of Two Folsom Degassing Pumps
PR Number: _______________
1. General:
1.1 Jones Hole National Fish Hatchery (NFH), 24495 East Jones Hole Hatchery Road, Vernal, UT
84078-2042. Replace two Folsom degassing pumps.
1.2 Purpose/End Application: This project is to replace two degassing pumps that pump spring water through nitrogen degassing colums for the health and safety of the fish.
1.3 Contractor Qualifications: The contractor must be a certified supplier of Folsom
Pumps.
1.4 Other: The contractor must follow all associated regulations and laws including: Federal, State, and County.
2. Place of Performance and Period of Performance
2.1 Work is to be performed at Jones Hole National Fish Hatchery, 24495 East Jones Hole
Hatchery Road, Vernal, UT 84078-2042.
2.2 This project needs to be completed prior to April 1, 2025.
2.3 Normal duty hours Monday thru Friday 8:00 a.m. - 4:30 p.m. In the event of emergencies, Contractor shall provide contact information.
3. Scope
3.1 The contractor shall deliver two (2) Folsom 5 horse power (hp), Simflo pumps – item number: OLS-PA7LX-1.
4. Deliverables and/or Delivery Schedule:
4.1 The contactor shall provide:
Estimate replacements for SN 118626 A & B
COS: 1,208 gpm x 6.08'@ 1,770 rpm (Bowl Performance)
Total Pump Length: 90 [in]
• Model: OLS-PA7LX-1 20 degree wl colleted Impellers
• Suction: Belled, Standard-Sized I Strainer: Standard Basket
• Column: 10" Standard Duty SPI Flanged, Sch.40), 5' Std. Section Length
• Line-Shaft: 1-114" - 10 TPI LH, 1 O" Stickup
• Head: SL R adius Fab. wl 8" 150# ANSI RF Slip-on Outlet for - VHS Driver wl
Packing Gland Seal Assembly, Standard Base I Foundation Plate: None
[Materials per Submittal Details]
• 5 hp, VHS, TEFC, 1,770 rpm, Sinewave Optimized, NRR, CLOCKWISE
ROTATION, 1" BX, 12" BD, Nidec US-Motors HT5P2BLE
Motor:
• 5 hp, VHS, TEFC, 1,770 rpm, Sinewave Optimized, NRR, CLOCKWISE
ROTATION, 1" BX, 12" BD, Nidec US-Motors HT5P2BLE
Seal
• Chesterton 155 Mechanical Seal
5. Data Management Plan (DMP) N/A
6. Government-Furnished Equipment (GFE) / Government-Furnished Information
(GFI)
6.1 Jones Hole NFH will provide restrooms, electricity, and water for the contractor to using while the contracted work is being completed.
6.2 Identify any limitations. N/A
7. Evaluation and Acceptance
7.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon: designated U.S. Fish and Wildlife Service representative(s) determining the work to be acceptable and in good working order.
8. Quality Control/Quality Assurance:
8.1 For commercial supplies reference clauses for inspection and acceptance. Where appropriate, QC will be maintained according to industry standards and made available to the agency with the contractor’s proposal.
8.2 Identify and detail measures for assessing quality control and acceptance; each requirement is unique and a table format is visually friendly and may be desirable.
9. Technical Coordinator:
9.1 Primary individual responsible for the final product or service.
Travis Anderson
Hatchery Manager
24495 East Jones Hole Hatchery Road
Vernal, UT 84078-2042
Office: 435-789-4481 x12 travis_anderson@fws.gov
9.2 Secondary individual responsible for the final product or service.
Kristopher “Kris” Johnson
Facility Management Coordinator (FMC)
Asset Management Coordinator (AMC)
U.S. Fish and Wildlife Service
Fish and Aquatic Conservation (FAC)
1380 South 2350 West
Vernal, UT 84078
Cell: 435-299-5150
Office: 435-789-0351 ext. 16 kristopher_b_johnson@fws.gov mailto:travis_anderson@fws.gov mailto:kristopher_b_johnson@fws.gov
File details come from the government source that posted it. Updated .