STATEMENT OF WORK: REFINISH EXTERIOR WOOD SURFACES OF THE VISITORS CENTER
This Statement of Work describes the scope of work for cleaning and refinishing exterior wood surfaces at the U.S. Fish and Wildlife Service Visitors Center located at Kenai National Wildlife Refuge, 33398 Ski Hill Road, Soldotna, Alaska. The contractor must provide all materials, labor, equipment, and supervision to clean and refinish approximately 2,390 square feet of wood surfaces, including 10 turned log posts (6 posts at 12" diameter × 10' tall at front entrance; 4 posts at 10" diameter × 10' tall at rear patio), approximately 890 square feet of horizontal soffit, and approximately 1,500 square feet of vertical siding across multiple building areas. The existing finishes consist of Sikkens Wood Finishes (Cetol 1 and Cetol 23 Plus) applied when the building was completed in 2015. All surfaces must be thoroughly cleaned using biodegradable non-chlorine bleach solution per manufacturer instructions, then finished with three coats of penetrating waterborne oil such as Nature's Edge Wood Finish (Timber Edge Products, LLC), American Building Restoration Products, Sikkens Wood Finishes, or equal products applied per manufacturer instructions.
The contractor must begin on-site work within 15 calendar days of contract award and complete all work, including final cleanup and material removal, within 45 calendar days of award. Work hours are limited to 6:00 a.m. to 7:00 p.m., Monday through Friday, with no work on Federal holidays; scheduling must be coordinated with the COTR to minimize disruption to Refuge operations. The contractor must submit a detailed Work Plan and all manufacturers' product information within 10 days of award and before work begins, provide Material Safety Data Sheets for all products used prior to work start, and maintain an on-site representative fluent in English available during work hours. The contractor is responsible for protecting all doors, windows, metal flashings, electrical components, and other building elements from damage, and must repair or replace any damaged surfaces at contractor expense. All debris must be disposed of at approved landfills in compliance with Federal, State, and Local laws; debris cannot be disposed of in on-site dumpsters. The Government will furnish electrical power at existing outlets and water at hose bibbs. The Contracting Officer is Cindy Salazar (Portland, Oregon; 503-872-2832; cindy_salazar@fws.gov), with primary technical contact Clifton Peterson, Facilities Operations Specialist (907-621-6153; Clifton_Peterson@fws.gov).
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FC326Q0013_Amd_0001.pdf | ||
| B09_Amendment_1_Rev_Clauses_Site_Visit_0001.pdf | ||
| A06_Bid_Schedule_Kenai_Refinish.docx | DOCX document | |
| Sol_140FC326Q0013.pdf | ||
| B03_Davis_Bacon_Kenai_Penn_1_2_2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Refinish Exterior Wood Surfaces of the Visitors Center
Kenai National Wildlife Refuge Revised 02/04/2026
SCOPE: The U.S. Fish and Wildlife Service, Visitors Center building located at the Kenai National Wildlife Refuge, 33398 Ski Hill Road, Soldotna, Alaska. The Contractor will provide all materials, labor, equipment and supervision required to clean and refinish exposed exterior wood surfaces. Work shall include all exposed wood surfaces including wood siding, wood soffits, wood trim, and turned log posts.
The following information relating to the size of the area to be refinished is provided for reference only. Wood surfaces are not continuous, and the overall project consists of wood surfaces in a variety of areas on the building exterior, including surfaces accessed from the building roofs. It shall be the responsibility of the contractor to measure the building and determine surface areas as they exist.
Wood surfaces to be refinished include:
• 6 each turned log posts, approximately 12” diameter x 10’ tall, located at the front entrance of the building.
• 4 each turned log posts, approximately 10” diameter x 10’ tall, located at the rear patio area of the building.
• Approximately 890 square feet of horizontal soffit, including at the front entrance, at the
Multi-Purpose Room emergency exit, at the north staff entrance, and at the rear entrance and patio area.
• Approximately 1500 square feet of vertical siding, including at the front entrance, at the Multi-Purpose Room emergency exit, at the north staff entrance, at the rear entrance and patio area, and the upper areas accessed from the roof.
EXISTING FINISHES: The Visitor Center construction was completed in 2015 and finishes applied to the exterior wood surfaces include oil alkyd formulation by Sikkens Wood Finishes, Cetol 1 and Cetol 23 Plus.
CLEANING METHOD: All surfaces shall be thoroughly cleaned to remove deteriorated finishes, mold, mildew and dirt, using a biodegradable non-chlorine bleach solution. Cleaning shall be accomplished in accordance with the manufacturer’s written instructions.
FINISHING: All surfaces shall be finished with three coats of penetrating waterborne oil like Nature’s Edge Wood Finish, manufactured by Timber Edge Products, LLC, similar products by American Building Restoration Products, Sikkens Wood Finishes, or equal. Finish shall be applied in accordance with the manufacturers’ written instructions.
PROTECTION OF MATERIALS: All doors, windows, metal flashings, metal trim, finished concrete, metal siding, electrical boxes/panels, lights, etc., should be protected from damage throughout the cleaning and finish application process. Any surfaces or building components damaged during the cleaning or finishing process shall be repaired and/or replaced at the contractor’s expense.
Kenai National Wildlife Refuge Revised 02/04/2026
CLEAN-UP: Upon completion of the finishing process, the contractor shall clean any and all adjacent or surrounding surfaces to remove any material or film. This shall include cleaning of glass, metal and concrete surfaces that have been impacted by the finish application process.
MONITORING: The COTR will monitor the Contractor's performance to ensure compliance with this Statement of Work and any other contract specifications. The Contractor will provide a complete checklist of work completed. When deficiencies are observed the COTR will notify the Contractor. The Government may require re-performance to correct discrepancies at no additional cost. The Government may have work which was not acceptable re-accomplished by the Contractor by other means. The Government may deduct the value of work not performed satisfactorily from the contract amount rather than allowing re-accomplishing. The amount of any deductions shall be determined by the Contracting Officer based upon the Contracting Officer's determination of the value of the work not performed and any administrative expenses incurred by the Government due to lack of performance. Accepting non-conforming services does not waive any of the Governments rights
CONTRACTOR PERSONNEL: For security reasons, at the start of this contract the contractor will provide a list of names, addresses and phone numbers of personnel that will be assigned to this contract. The Contractor shall have a competent on-site representative authorized to act on behalf of the contractor, available to the COTR during the day. The on-site representative must be able to read, write, speak, and understand English.
The contractor shall furnish adequate supervision at the premises to ensure that work is performed in a satisfactory manner. It is the responsibility of the contractor to maintain close surveillance of project personnel.
PROJECT SCHEDULE: Within 15 days following the award of contract, the contractor shall proceed with on-site work. All work shall be completed, including final clean-up and removal of all excess materials, supplies and equipment from the project site, within 45 calendar days from the date of the award of contract.
PROJECT SUBMITTALS: The Contractor shall submit a detailed Work Plan and all manufacturers’ product information for review and approval by the COTR within 10 days following the award of contract and before work begins.
WORKING HOURS: All work shall be accomplished between the hours of 6:00 a.m. and 7:00 p.m., Monday through Friday. No work shall be scheduled on official Federal Government holidays. Scheduling of work shall be coordinated with the COTR to minimize any disruption of access to the building by Refuge staff or visitors. The COTR, Mr. Clifton Peterson can be reached at 907-621-6153 (office) or 252-9351 (cell), Monday through Friday, 7:00 am through 4:00 pm. A message should be left on the answering machine if he is not in.
DISPOSAL OF DEBRIS: All trash or debris resulting from execution of the project shall be disposed of by the contractor at an approved landfill facility in accordance with Federal, State and Local laws, codes and regulations. The contractor or contractor’s personnel shall not dispose of any debris, trash or waste in Kenai NWR contracted on-site dumpsters.
MATERIALS: Materials shall be as indicated under the project Scope. Material Safety Data Sheets (SDS) for all products used on this project shall be provided to the COTR prior to the start of work. Additionally, copies of all SDSs shall be maintained on-site with the Contractor’s representative. All products shall be environmentally friendly and non-toxic.
STORAGE OF MATERIALS: All materials stored on the project site shall be stored in accordance with the manufacturer’s requirement and in accordance with applicable Federal, State, and Local laws, codes and regulations.
UTILITIES: Electrical power will be furnished by the Government at existing power outlets for the operation of equipment as is necessary to perform the work required under this project. Tap water will also be made available to the Contractor as necessary for the performance of the work at existing hose bibbs.
DAMAGE TO PROPERTY: The Contractor is liable for damage to both Government and private property in performance of this contract where the damage is the fault of the Contractor.
INTERFERENCE WITH BUSINESS: The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees. The services under this contract shall be performed in such a way that there will be no interference with Government operations. The Contractor shall coordinate with the COTR any work which may restrict access to any building or limit the use of any building exits.
LAWS, ORDINANCES AND REGULATIONS: The Contractor shall comply with all Federal, State, and Local laws, ordinances and regulations and shall obtain and pay for all necessary permits and licenses.
Point of Contracts:
Technical:
Clifton Peterson Facilities Operations Specialist Kenai National Wildlife Refuge PO Box 2139, 33398 Ski Hill Road Soldotna, AK 99669 Phone: (907) 621-6153 Email: Clifton_Peterson@fws.gov mailto:Clifton_Peterson@fws.gov
Alternate Technical:
Stephen (Steve) Miller Deputy Refuge Manager PO Box 2139, 33398 Ski Hill Road Soldotna, AK 99669 Phone: (907) 621-6176 Email: Stephen (Steve)_Miller@fws.gov
Contracting Officer:
Cindy Salazar Portland, Oregon Phone: 503-872-2832 Email: cindy_salazar@fws.gov mailto:_Miller@fws.gov mailto:cindy_salazar@fws.gov