A04_SOW___QASP_FINAL.docx

DOCX document 26 KB Posted

Attached to
AZ-BUENOS AIRES NWR-FIRE BIL GRUBBING
Solicitation number
140FS223Q0055
Issued by

View the file

Other files

File Type Posted
B08_-_Past_Experience_and_References_Form.doc DOC document
Sol_140FS223Q0055.pdf PDF
A04_SOW___PWS_FINAL.docx DOCX document
B12_Misc___Notice_to_Quoters.doc DOC document
A04_SOW___Fire_Prevention_Plan_FINAL.pdf PDF
B03_Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Quality Assurance Plan (401819M801) Quality Assurance Plan Quality Assurance Plan

Project Name
Project Reference Number
Prepared By (print)
Preparer’s Initials
332 Acres of mesquite tree grubbing project
XXX-XXXX-XX
Nate Barrett
NB
Customer
Contact
Contact’s Phone #
Date Prepared
COR
Nate Barrett
520-993-0229 nathan_barrett@fws.gov
Jan 2023

1.0 Objective

Provide a brief description of the Quality Assurance Plan’s intent.

1.1 Ensure contractor meets time schedules, adheres to standard commercial practices, and complies with Performance Work Statement/contract in an efficient, ethical, and productive manner.

2.0 Performance Indicators and Acceptable Quality Levels

Provide a description of the performance indicators to be measured and their acceptable quality levels.

2.1 Comply with work production/work schedule(s) (complete work within Oct 1 – March 15 timeline) with no deviation(s). 100% compliance.

2.2 Comply with Work Statement/contract. 100% compliance.

2.3 Contractor shall provide weekly report at the end of the work week to COR, including issues encountered, acreage cleared, and any wildlife observed in the project area. 100% compliance

2.4 Contractor must provide a list of approved equipment appropriate size and efficiency to meet the project requirements. Contractor shall also provide trained and qualified employees to operate equipment. 100% compliance.

3.0 Surveillance Methods

Provide a description of the evaluations that will be performed based on the indicators in section 2.0.

3.1 Regularly scheduled inspection/review of work

3.2 Staff feedback

4.0 Incentives

Provide a description of any incentives/penalties.

4.1 Non-compliance with Performance Work Statement will result in future work references detailing areas of non-compliance and deviations.

4.2 A positive performance reference will be given for overall satisfactory work and compliance related to the contract.

TError! No text of specified style in document.- ESI International code-0323 © ESI qap - d-6 repair merritt 9m801