Bureau of Land Management – Carson City District Grazing Monitoring

1. Introduction:

The Bureau of Land Management (BLM), Carson City District Office (CCDO), is soliciting bids for range field monitoring in the Carson City District. The intent is to select a qualified contractor to assist BLM in conducting range field monitoring, as well as compiling the monitoring results into high quality digital reports. Field work will occur in remote areas throughout the district primarily in the Stillwater Field Office (SWFO).

2. Background:

Range monitoring is necessary to manage grazing on public lands administered by the BLM. This data is used to adjust grazing permits upon renewal. CCDO administers 4.8 million acres of BLM-Administered surface land, including 37 grazing allotments in the SWFO. Increased monitoring requirements in combination with a decreased BLM staffing and conflicting workload priorities have made it difficult to conduct the necessary monitoring. Additionally, potential land withdrawal actions have created a necessity to collect more data from which to analyze future grazing decisions. Monitoring data is used to complete grazing permit renewals, and/or make adjustments to meet management objectives, among a variety of other uses, and high-quality data is imperative to provide BLM the ability to make the best management decisions possible.

3. Scope of Work:

The CCDO has a need for a contractor to conduct monitoring associated with rangeland health standards including grazing impacts from livestock and wild horses, wildlife habitat suitability, riparian health and other short term and long-term trend monitoring throughout the state. Monitoring will follow techniques provided from BLM policy and guidance. The contractor will prepare high quality monitoring reports, monitoring files, and maps related to the tasks below.

Contractor field teams will conduct field work and compile the monitoring results into high quality digital reports in rural NV within the CCDO. See Attachment 4 for more detailed work that needs to be done.

3.1 Tasks

Task 1: Meetings and coordination Task 2: Field work for monitoring Task 3: Prepare draft monitoring reports and observational data collected by allotment.

Task 4: Prepare final monitoring reports incorporating all office edits and revisions

3.2. Deliverables:

Task 1: Meetings and coordination

1.1. The contractor will participate in a post award kickoff meeting.

1.2. The contractor will coordinate with BLM District Offices and the State Office to develop schedules. The schedules will include:

1.2.1. Each team (assuming two members for each monitoring team) must have their schedule planned in two-week increments.

1.2.2. Each two-week schedule must be developed in coordination with the CCDO

1.2.3. Each two-week schedule must be finalized with monitoring locations, monitoring technique(s) associated equipment, data forms, and any associated maps at least 2 weeks prior to the field work occurring.

Sample Schedule (only for clarification):

Week 1 – For this example, lets say that all meetings and information exchange (reviews, etc) occur on Mondays. The contractor and BLM will coordinate prior to field work starting to ensure that the first week (as well as the general overall season) are planned.

Week 2 – bi-weekly meet, set up weeks 4&5 monitoring schedule, including compiling all needed forms, maps, equipment, special instructions, etc. Turn in draft allotment monitoring report for week 1.

Week 3 - receive back review of draft week 1

Week 4 – bi-weekly meet, sets up weeks 6&7 monitoring schedule, including compiling all needed forms, maps, equipment, special instructions, etc. In addition, discuss and review the summary of the weeks 2&3 field work and turn in draft report for weeks 2&3 and final report for week 1.

Week 5 - receive back review of draft weeks 2&3

Week 6 – bi-weekly meet, sets up weeks 8&9 monitoring schedule, including compiling all needed forms, maps, equipment, special instructions, etc. In addition, discuss and review the summary of the weeks 4&5 field work and turn in draft report for weeks 4&5 and final report for weeks 2&3.

Week 7 - receive back review of draft weeks 4&5

1.3. The contractor will schedule re-occurring bi-weekly meetings planned out for the duration of the field season.

1.3.1. The BLM Contract Officer Representative (COR) for this contract, and associated Principal Investigators (PI) will participate in these meetings.

1.3.2. Bi-weekly meetings will include.

· When the meeting will occur, an agenda for each meeting, as well as the preparation of meeting notes.

· Monitoring techniques that will be used for each BLM District as well as when the monitoring will occur.

· A summary of work completed in the previous two weeks and what is on the schedule for the next two weeks as well as any schedule changes and the justification for the change.

· The District receiving the two-week report will have 1 week to review and edit the report, after that time the report will be considered final.

· The district receiving the previous two weeks field reports will confirm receipt of these reports.

· The district set to receive the next two weeks of work will be ready at these meetings to ensure the contractor has any forms, templates, etc., necessary to ensure that the contractor understands the product desired.

1.4. The contractor will create and be responsible for implementing a safety plan for the contract employees.

1.5. The contractor will use the file structure and naming protocol provided by the CCDO for the data that will be collected and reported.

1.6. The contractor will schedule an end of season close out meeting, for which the purpose will be for the BLM to confirm that the contractor has successfully completed the work required.

Task 2: Field work for monitoring

2.1. The contractor must provide all personnel/management (i.e., labor), equipment, vehicles, and supplies needed to conduct monitoring.

2.2. The contractor will use the schedule developed with the CCDO to conduct monitoring.

2.2.1. The CCDO will provide the contractor with all required monitoring requests as soon as practicable, but no later than 2 weeks prior to the monitoring needing to be conducted

2.3. The contractor field teams must be skilled and trained in the monitoring techniques described in the BLM technical references and manuals which are listed in attachment 2 and available from the BLM upon request.

2.3.1. The contractor field teams will provide draft field reports at a biweekly interval, and time must be afforded in their schedules to accommodate this workload.

2.3.2. The CCDO will be provided 1 week to review each field report, and then the field reports will be finalized by the contractor and routed/filed as appropriate.

2.3.3. The contractor will be responsible for ensuring that all field reports are filed both physically (paper copy) and in digital format using the naming system and filing system provided by BLM.

2.4. Field reports will consist of at a minimum: field data collection sheets, notes, labeled photos, and maps.

2.4.1. All field sheets will be filled out in entirety, with an N/A instead of a blank when appropriate. All photos will be labeled with date, location, etc. as defined by BLM. The contractor will provide any documentation that the technical references and manuals may list as required for the monitoring technique conducted.

2.4.2. Summary field reports will be completed and made available for each bi-weekly meeting. This summary will include the locations monitored, and the type of monitoring conducted in the previous two-week time frame.

2.4.3. All field data sheets, notes, labeled photos and maps will be maintained in a neat and organized system in preparation for completing the draft and final report.

Task 3: Prepare draft monitoring reports and observational data collected by allotment.

3.1. The contractor will provide a draft report to the BLM for field monitoring conducted at two-week intervals. The draft will be based on a template appropriate to the purpose of the monitoring (PFC, Key Forage Transect, Frequency Transect, etc.). The template/requirements for the draft report must be conveyed by BLM as soon as practicable, but no later than two weeks prior to the data collection occurring.

3.1.1. The draft report will include all field data sheets, detailed notes, clearly labeled photos, and maps. The draft will be provided to BLM by the contractor in solely a digital format, so as to allow for editing prior to printing.

3.3. The BLM will review and edit the draft reports and provide the contractor with their edits and comments within 1 week.

Task 4: Prepare final monitoring reports incorporating all office edits and revisions.

4.1. The contractor will make all revisions within 1 week of receiving the BLM edits.

4.1.1. Contractor and BLM will actively work together to resolve any questions arising from BLM edits.

4.2. The contractor will provide the BLM with a hard copy final monitoring report complete with all the data, labeled photos, etc., that contributed to the final report.

4.3. The contractor will provide BLM with electronic copies of the final allotment reports for monitoring complete with all the data, labeled photos, etc., that contributed to the final report.

4.4. The contractor will be responsible to ensure the final monitoring reports are filed according to BLM direction.

4.5. The contractor will supply electronic copies of final shapefiles and geodatabases created for the monitoring reports.

3.3 Key Personnel

The contractor shall assign to this contract the following key personnel:

· One Project Manager

· Field Teams (there will be at a minimum one field technician/crew lead and one field technician on each team.)

4. Contractor Performance Assessment After completion of a contract evaluation will be completed in the Contractor Performance Assessment Reporting System (CPARS) at https://www.cpars.gov/ . A CPARS shall be done for contract orders over $250,000.

5. Quality All Work shall be checked and technically reviewed and approved in accordance with environmental statutes, EO, DOI and BLM policies, directives, and guidelines.

PERFORMANCE OBJECTIVE
PERFORMANCE STANDARD
ACCEPTABLE LEVEL OF QUALITY
METHOD OF SURVEILLANCE
Section 34 – Scope of Work
Timeliness – All documents and SOW requirements submitted within required timeframes(s).

Accuracy – all documents conform to formatting requirements, agency directives, department directives, Executive Order, and Executive Statutes as included in 4.7. Documents and submittals contains all information as specified in the PWS.

Professional – Documents and submittals are well organized, grammatically correct and demonstrate sound professional evaluation and analysis.

95%
Reviewed by BLM Contracting Officer Representative and BLM District Office PI.

6. General Training:

The Contractor is responsible for all training for its employees except when training can only be provided by BLM.

7. Place of Performance:

The place of performance is in Carson City, Nevada. The contractor must be able to attend any meetings in Carson City, NV.

8. Federal Holidays:

Holidays observed by the contractor shall include all legal holidays observed by the Government. These holidays are:

New Year’s DayMartin Luther King DayColumbus DayPresident’s Day
Memorial DayIndependence DayLabor DayVeteran’s Day
Thanksgiving DayChristmas Day

9. Government Furnished property:

The Government will not be furnishing any property associated with this contract. All property will be the responsibility of the contractor to supply.

10. Preservation of Historical and Archaeological Data The Historic and Archaeological Data Preservation Act of 1974, provides for the preservation of historical and archaeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or programs.

If, in connection with operations under this contract, the Contractor, subcontractors, or the employees discovers, encounters, or becomes aware of any possible historical or archaeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the Contracting Officer in writing, giving the location and nature of the findings. No objects of cultural resource value shall be removed.

Where appropriate by reason of discovery, the contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.

The Contractor shall be responsible for protecting the cultural resources within the affected area from damage. In addition, the contractor will be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed. Actions taken under this paragraph shall be subject to the FAR 53.242-15 Stop-Work Order.

11. Interruption of Work:

ENVIRONMENTAL – The Contracting Officer, by issuance of a stop work order, may direct the Contractor to shut down any work that may be subject to damage due to weather conditions or fire danger. The Contractor shall be given a resume work order, which shall document the date the stop work order ended. An allowance has been included in the contract time for short-term environmental delays up to one day at a time. The count of contract time shall therefore continue during stop work of one day or less, but the count of contract time shall stop during stop work orders in excess of one day at a time. All periods of stop work by the Government shall be documented. Actions taken under this paragraph shall be subject to FAR 52.242-15 – Stop-Work Order.

ENDANGERED SPECIES – The Government may direct the Contractor to stop work and all operations or may redirect the work to another location in the event that listed species or proposed threatened or endangered plants or animals protected under the Endangered Species Act of 1973, as amended, or Federal candidate (Category 1 and 2), sensitive or state listed species, identified under BLM Manual 6840 (Attachment 3), are discovered to be present in or adjacent to the project area. Actions taken under this paragraph shall be subject to FAR 52.242-15 Stop-Work Order.

FIRE DANGER SEASON – If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.

12. Identification of Contractor Employees:

All contract personnel are required to identify themselves as contractors. Whether attending meetings, or working in other situations where their contractor status is not obvious to third parties, they must make their status known to avoid creating an impression that they are Government employees.

13. Confidentiality:

During the work involved in this contract, there will be high potential to have access to data that is designated as sensitive. As such, contractors performing services shall sign a Non-Disclosure Agreement form prior to performing any work. In addition, it is the contractor’s responsibility to make sure their employees understand that no sensitive information may be disclosed. Data may be disclosed only with applicable BLM Program Lead approval, on a case by case basis.