A04_SOW_kiosks_Fabrication_and_Installation.pdf

PDF 157 KB Posted

Attached to
RGFO KIOSK FABRICATION AND INSTALLATION
Solicitation number
140L1721Q0066
Issued by

View the file

Other files

File Type Posted
A06_Photos_of_Existing_Kiosks.pdf PDF
A06_Maps_of_Location.pdf PDF
A06_Specs_Standard_and_Small_Kiosk_Design.pdf PDF
Sol_140L1721Q0066.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Bureau of Land Management

Royal Gorge Field Office

Background

The BLM Royal Gorge Field Office needs new information kiosks for placement at 10 different recreation sites throughout Fremont County, Colorado. There are two different sizes of kiosks, standard and small that will be placed at these sites. The fabrication and installation of the kiosks shall be phased over a three-year period to keep pace with the in-house design of the kiosk content. The kiosks must match kiosks that have already been installed to maintain the field office brand and “look and feel”.

Statement of Work

Fabrication

The kiosks shall be constructed of steel construction with the digital prints panel on aluminum per the specifications provided. The entire kiosk shall be sand blasted and rusted steel finished.

The Standard Kiosk is approximately 97.18” tall with an interior panel width of 78”.

The standard kiosks include the site name welded to the top cut out of ¼” plate steel. See

Attachment 1 Standard Kiosk Specifications for additional measurements and to serve as an example.

The Small Kiosk is approximately 97.18” tall with an interior panel width of 55.31”. The small kiosk does not include a site name welded on top. See Attachment 2 Small Kiosk

Specifications for additional measurements and to serve as an example.

Removal and Disposal

For many of the sites these newly fabricated kiosks will be replacing an existing kiosk.

Where a kiosk exists the BLM requires the old kiosk to be removed and properly disposed of. Photos of the existing kiosks are provided for each site in Attachment 5.

Installation

The kiosks shall be delivered and installed at the individual referenced recreation sites. A map (Attachment 3) and Google Earth kml file (Attachment 4) has been provided for the installation locations along with a photo of each site (Attachment 5). It is up to the contractor to be familiar with the site including road and soil conditions. The kiosks must be installed level, 3’ deep and reinforced with concrete for each of the holes. It is up to the contractor to determine the most appropriate method and equipment for installation.

Prior to installation the final location and orientation of the kiosk must be verified by

BLM staff. Following installation any disturbed areas must be graded and smoothed.

Phasing

In order to keep pace with development of the information that will go into the kiosk the panels shall be fabricated and installed according to the following phasing and in this particular order.

Year 1

Texas Creek Standard Kiosk

Deer Haven Standard Kiosk

Deer Haven Wilson Creek Small Kiosk

Deer Haven Thompson Mountain Small Kiosk

Booger Red Standard Kiosk

Year 2

Grape Creek WSA Standard Kiosk

Beaver Creek WSA Standard Kiosk

Turkey Rock Standard Kiosk

Year 3

Penrose Commons Standard Kiosk

Seep Springs Standard Kiosk

Specifications:

Year 1

Location 1: Texas Creek Standard Kiosk

• See Attachment 1 Standard Kiosk Specifications for diagram of kiosk.

• Site name welded to top in ¼” steel plating reads “Texas Creek”

• See Attachment 3 for Texas Creek Map for installation location and photo of site

• See Attachment 4 for Google Earth KML file that includes all of the installation sites.

• See Attachment 5 for photo of existing kiosk to be removed. Kiosk to remain on site for re-location by BLM staff.

Location 2: Deer Haven Standard Kiosk

• See Attachment 1 Standard Kiosk Specifications for diagram of kiosks.

• Site name welded to top in ¼” steel plating reads “Deer Haven”

• See Attachment 3 for Deer Haven Map for installation location and photo of site

• See Attachment 4 for Google Earth KML file that includes all of the installation sites.

Location 3: Deer Haven Wilson Creek Small Kiosk

• See Attachment 2 Small Kiosk Specifications for diagram of kiosk.

• No site name welded to top.

• See Attachment 3 for Deer Haven Wilson Creek Map for installation location and photo of site.

• See Attachment 5 for photo of existing kiosk to be removed and disposed of.

Location 4: Deer Haven Thompson Mountain Small Kiosk

• See Attachment 2 for Small Kiosk Specifications for diagram of kiosk.

• No site name welded to top.

• See Attachment 3 for Deer Haven Thompson Mountain Map for installation location and photo of site.

Location 5: Booger Red Standard Kiosk

• See Attachment 1 Standard Kiosk Specifications for diagram of kiosk.

• Site name welded to top in ¼” steel plating reads “Booger Red”

• See Attachment 3 for Booger Red Map for installation location and photo of site

Location 6: Grape Creek WSA (West Bear Gulch) kiosk

• See Attachment 1 Standard Kiosk Specifications for diagram of kiosk.

• Site name welded to top in ¼” steel plating reads “Grape Creek WSA”

• See Attachment 3 for Grape Creek WSA Map for installation location and photo of site

Location 7: Beaver Creek WSA kiosk

• Site name welded to top in ¼” steel plating reads “Beaver Creek WSA”

• See Attachment 3 for Beaver Creek WSA Map for installation location and photo of site

Location 8: Turkey Rock kiosk

• Site name welded to top in ¼” steel plating reads “Turkey Rock”

• See Attachment 3 for Turkey Rock Map for installation location and photo of site

• No Kiosk to remove.

Location 9: Penrose Commons kiosk

• See Attachment 1 Standard Kiosk Specifications for diagram of kiosk.

• Site name welded to top in ¼” steel plating reads “Penrose Commons”

• See Attachment 3 for Penrose Commons Map for installation location and photo of site

Location 10: Seep Springs kiosk

• Site name welded to top in ¼” steel plating reads “Seep Springs”

• See Attachment 3 for Seep Springs Map for installation location and photo of site

Delivery Date:

20 days after award

Place of Performance:

BLM Royal Gorge Field Office

3028 E. Main Street

Canon City, CO 81212

Various locations within field office see Attachment 3 and 4 for location maps and google earth files.

Point of Contact:

Kalem Lenard jlenard@blm.gov

(cell) 719-433-8486

Schedule of Items LCC Description QTY Unit Unit Price Total Amount

Year 1

1 Texas Creek Standard Kiosk Fabrication

2 Texas Creek Removal of Old Kiosk

3 Texas Creek Standard Kiosk Installation

4 Deer Haven Standard Kiosk Fabrication

5 Deer Haven Standard Kiosk Installation

6 Deer Haven Wilson Creek Small Kiosk Fabrication

7 Deer Haven Wilson Creek Removal and Disposal of Old

Kiosk

8 Deer Haven Wilson Creek Small Kiosk Installation

9 Deer Haven Thompson Mountain Small Kiosk

Fabrication

10 Deer Haven Thompson Mountain Removal and Disposal of Old Kiosk

11 Deer Haven Thompson Mountain Small Kiosk

Installation

12 Booger Red Standard Kiosk Fabrication

13 Booger Red Removal and Disposal of Old Kiosk

14 Booger Red Standard Kiosk Installation

15 Grape Creek WSA Standard Kiosk Fabrication

16 Grape Creek WSA Removal and Disposal of Old Kiosk

17 Grape Creek WSA Standard Kiosk Installation

Commented [LJ(K1]: Forge Road Address mailto:jlenard@blm.gov

18 Beaver Creek WSA Standard Kiosk Fabrication

19 Beaver Creek WSA Removal and Disposal of Old Kiosk

20 Beaver Creek WSA Standard Kiosk Installation

21 Turkey Rock Standard Kiosk Fabrication

22 Turkey Rock Kiosk Installation

23 Penrose Commons Standard Kiosk Fabrication

24 Penrose Commons Removal and Disposal of Old Kiosk

25 Penrose Commons Standard Kiosk Installation

26 Seep Springs Standard Kiosk Fabrication

27 Seep Springs Removal and Disposal of Old Kiosk

28 Seep Springs Standard Kiosk Installation