HSTR SNOW REMOVAL Federal contract opportunity
Solicitation number
140P6020Q0036
Issued by
Department of the Interior National Park Service Midwest Region

View the file

Other files for this federal contract opportunity

Other files attached to HSTR SNOW REMOVAL, newest first.
File Type Posted
Sol_140P6020Q0036.pdf PDF
B03 DOL Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

PROJECT TITLE: Harry S Truman National Historic Site, Winter Weather Snow Removal and Treatment

LOCATION: Harry S Truman NHS, 223 North Main St, Independence, MO 64050

FOCUS OF WORK: Complete winter weather maintenance to include snow removal / plowing, sanding, and de-icing of open areas around several historic structures, 216 N. Delaware has a two-car parking space, sidewalk, ramps, and porches. The sidewalk areas outside the fenced space on 219 N.

Delaware Avenue that includes paver walkway, sidewalk leading to and around Truman Road.

Sidewalk space and stairs leading into 605 W. Truman Rd and 605 W. Truman. The sidewalk space directly in front of 233 N. Main from the handicap ramp space to the front end of the visitor center.

SIDEWALK, PORCH, AND SNOW REMOVAL AREA MEASUREMENTS PER

LOCATION:

LocationName:

Visitor Center/HQ 285 SQ FT Noland Home 1,633 SQ FT Truman Home 1,576 SQ FT George Wallace Home 436 SQ FT Frank Wallace Home 384 SQ FT Total 4314 Square feet

DESCRIPTION OF PROJECT:

The contractor will provide all snow, ice, frost, and other frozen precipitation removal on Main, Truman and Delaware streets within Harry S Truman National Historic Site to provide safe motor vehicle traffic driving during winter weather conditions. The roadway surfaces shall be maintained 24 hours a day, 7 days a week, including Federal Holidays. Please see below for level of service requirements. Communication with the contracting officer’s representative (COR) will be paramount during the duration of this project.

When accumulative frozen precipitation events occur, the contractor shall clear frozen precipitation (snow/ice) to the extreme edge / shoulder of the roadway surface as well as use a 5/1 ratio sand / salt mix abrasive to de-ice precipitation that is not cleared to the edge of the roadway.

When non-accumulative precipitation events occur, the contractor shall use a 5/1 (or other approved ratio) sand/salt mix for roadway application, for de-icing frozen precipitation that cannot be cleared from the walkways and front steps. Types of non-accumulative precipitation would be freezing rain, heavy frost, or a minor accumulation of snow that cannot be removed by plowing. Special consideration shall be needed for intersections, hills, and curves. Special Consideration areas include the following:

• Walkways: 223 North Main Street

• Walkways, stairs, and porch : 605 & 601 W. Truman to Delaware Street

• Walkways outside the fenced area: Truman @ 2019 Delaware Street

• Walkways, parking spaces. Handicap accessible walkways, and porch : 216 N Delaware

During the entire contract period the contractor shall be responsible to monitor the condition of all roadways for snow /ice or other adverse conditions and apply a sand / salt abrasive when necessary.

Contractor may apply a sand / salt abrasive prior to inclement weather if freezing rain or other non-accumulative precipitation is forecasted to occur.

RESPONSE TIME, HOURS, AND LEVEL OF SERVICE:

Winter weather road maintenance service shall be furnished 24 Hours a day, 7 days a week, including all Federal Holidays for the entire contract period. Contractor must respond as winter weather precipitation accumulation indicates.

Porches and walkways should be maintained in a safe manner for normal foot traffic 24 hours a day, except during weather emergencies when it is understood that service may be temporarily slowed / suspended.

PERIOD OF PEFORMANCE:

Base Year: Sept 1 2020- Aug 31 2021 (35 weeks) Option Year One: Sept 1 2021- Aug 31 2022 (35 weeks) Option Year Two: Sept 1 2022- Aug 31 2023 (35 weeks) Option Year Three: Sept 1 2023- Aug 31 2024 (35 weeks) Option Year Four: Sept 1 2024- Aug 31 2025 (35 weeks)

Start of service varies based on weather. Start of 35 weeks is when first service of the season is required.