This Statement of Work (SOW) details roadway rehabilitation materials procurement for Piedmont National Wildlife Refuge in Georgia. The Department of the Interior Fish and Wildlife Service requires the delivery of 6,494 tons of Georgia Department of Transportation (GDOT) General Aggregate Base (GAB) with fines, 3,149 tons of #57 stone, and 80 tons of GDOT type 3 riprap across two road segments: RT#109 3 Loop Road and RT#421RZ Little Rock Road. The materials will be delivered in two phases, with a minimum of 30 loads per day, and will be used by the Regional Maintenance Action Team for roadway improvements.
The project has a specific performance period from August 25th, 2025 to November 14th, 2025, with precise geographic coordinates provided for material delivery and stockpile locations. The procurement method will be lowest bid technically acceptable, and a sources sought notice (Solicitation Number: 140F0S25Q0027) has been issued to identify potential vendors. Interested suppliers are required to provide their CAGE Code, Unique Entity ID, and confirm their capability to supply GDOT-specified materials or transportation/logistics services.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF-WORK
PIEDMONT NWR IMPROVEMENTS
GRAVEL DELIVERY
RT#109 3 Loop Rd – 10039684 & RT#421RZ Little Rock Road - 10075591
This statement of work is for the rehabilitation of RT#421RZ Little Rock Road and RT#109 3 Loop Road at Piedmont National Wildlife Refuge. Both roads span approximately 7 lane miles and construction will be completed through the Regional Maintenance Action Team (MAT) and lead by Wayne Smith. The preferred means of contracting will be lowest bid technically acceptable and will be solicited to supply and deliver goods mentioned below.
Rehabilitation of both roads will require the delivery of 6,494 tons of Georgia Department of Transportation standard General Aggregate Base (GAB) with fines and 3,149 tons of #57 stone. Material delivery will be done in two phases:
1) Phase one - Delivery and tailgate spread of #57 stone, government will perform all roadway rehabilitation utilizing delivered materials. #57 stone is to be spread to a 3-4” depth. Supply of #57 stone is to meet a minimum of 30 loads per day.
2) Phase two – Delivery and tailgate spread of GAB, government will perform all roadway rehabilitation utilizing delivered materials. GAB is to be spread to a 5-6” depth. Supply of GAB is to meet a minimum of 30 loads per day.
Roadway locations have been outlined below and can be seen on the maps attached in the appendix.
We will also request the delivery of 80 tons of GDOT type 3 riprap. Materials are to be stockpiled near the roadway site and accessible for the Maintenance Action Team to place. Riprap must meet typical GDOT standard of 5-12”, used for erosion and slope control.
Roadway Material Delivery Location(s):
RT#109 3 Loop Rd – Start: 33.120551, -83.7439839 End: 33.119206, -83.759175 RT#421RZ Little Rock Rd – 33.094259, -83.720620 33.089777, -83.719039 Riprap stockpile location 33.090557, -83.719183 Period of Performance:
August 25th, 2025 – November 14th, 2025
Appendix Overview
RT#111 3 Loop Rd
RT#421RZ Little Rock Loop
Riprap Stockpile Location image3.png image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.png image9.jpeg image1.png image2.png
File details come from the government source that posted it. Updated .