This statement of work outlines conservation services required for artillery at San Juan National Historic Site. The selected contractor will continue preservation and conservation treatment on the Ordonez cannon and carriage, four iron cannons, a bronze cannon, and 120 shells over a base year with two optional years. Services include stabilization, rinsing, removal of concretions, application of inhibitors and finish coatings. The contractor will also treat additional cannons, mortars, and shells if the optional years are exercised. Work will take place at the Santa Elena Guardhouse workshop from Monday to Friday, 8am to 5pm, for up to 30 hours per week and 1,500 hours total per year. The National Park Service will provide necessary supplies, equipment, and staff assistance while the contractor is responsible for their own transportation and housing. The statement of work establishes performance standards, safety requirements, personnel roles and proposal submission instructions for a contractor to complete the specified conservation services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P5421R0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continue Cannon Conservation Treatment Statement of Work
San Juan National Historic Site Page 1 of 4
STATEMENT OF WORK
Continue Preservation and Conservation Treatment on Ordóñez Cannon Tube and Carriage;
Four Iron Cannons, the Balista Bronze Cannon, and 120 Shells.
San Juan National Historic Site
Santa Elena Guardhouse
SCOPE: In accordance with the terms and conditions of the Contract, the Conservator shall perform the work of this Delivery Order for the National Park Service (NPS) as described herein.
The services shall include the continuation of the stabilization treatment for Ordóñez cannon and its carriage; four iron cannons, treatment for the Balista bronze cannon, and 120 shells, including stabilization, rinsing, removal of concretions, application of inhibitor and finish coating. Also, the conservator will provide services as necessary of preservation and conservation for any other metal artifacts and objects from the NPS collection.
PERFORMANCE PERIOD: The work performed under this Scope of Work shall be approximately for one Base Year with Two Additional Option Years in duration from the issuance of a notice to proceed.
1. OPTION YEAR 1: Perform conservation treatment of an additional three cannon, the mortar on exhibit in Castillo San Felipe del Morro and an additional 100 shells using the same process described on Section III.
2. OPTION YEAR 2: Perform conservation treatment of an additional three cannon, the iron cannon on exhibit at Castillo San Felipe del Morro and an additional 100 shells using the same process described on Section III.
WORK SCHEDULE: Work shall be performed from Monday to Friday between 8:00 am -5:00 pm.
Contractor shall plan to be on site no more than 30 hours weekly for a total of no more than 1500 hours.
GENERAL CONSIDERATIONS: Park housing is NOT available for this project. Transportation to and from the site will be the responsibility of the contractor. The park will provide access to the site.
I. PROJECT BACKGROUND
The park conducted an assessment of metal objects and recommended treatment for the artillery shells and cannons that are part of the museum collection. The park started treatment of the cannons and shells by entering into a CESU agreement with the University of Texas A&M. This agreement expired in
2009. The park contracted conservation work in FY 2014-16 for the treatment of 40 shells and 6 cannons (including the Ordóñez cannon and carriage), however due to the need to install the proper infrastructure and the fact that the conditions of the cannons were not monitored since 2009, the timetable for completion of treatment has changed. The area where work will take place is the Santa
Elena Guardhouse workshop. Work continues and on November 2015, a bronze cannon Proconsul, was
San Juan National Historic Site Page 2 of 4 back on exhibit in the Visitor Center Building at Castillo San Cristóbal. In situ conservation of cannon rails at Bastión del Carmen was completed in July 2016 and on October 2016 iron cannon #30, was back in exhibit room at the Castillo San Felipe del Morro. 95 additional shells have been treated and completed and are placed on exhibit at Castillo San Cristóbal. Treatment for the bronze cannon, Anade has been completed and is on display at the park. Three additional iron cannon were treated and ready for display in the park as well as an additional 100 shells. This work is necessary in order to complete the preservation and conservation work on these cannons and shells and have them back on exhibition as soon as possible.
II. STANDARDS
All conservation work produced under this Delivery Order shall be performed under the direct supervision of a professional conservator.
All conservation work performed shall be derived with the expectation of compliance with:
• NPS law and policy, specifically the standards contained in Director’s Order 24: Museum
Collections Management, Director’s Order 28: Cultural Resources Management, the Museum
Handbook, and Reference Manual 28: Cultural Resource Management Guideline
• Occupational Safety and Health Administration (OSHA) laws, standards, and regulations.
• Generally accepted professional practice standards for conservation of museum items.
• Follow treatment prescribed in the Metal Objects Conditions Survey
• Local codes only if required.
III. GENERAL DESCRIPTION OF WORK:
The work shall include, but not be limited to, the following components:
• Supervision of preparation of chemical solutions for immersion of cannon and artillery shells.
• Weekly monitoring of chloride levels of Ordoñez cannon tube and carriage, 3 iron cannons, the
Balista bronze cannon, and 120 shells to determine optimum levels of chloride ppm content to proceed to rinsing, neutralization and final treatment.
• Change chemical solutions using the established timetable and recommendations from material analysis spacialist or equivalent.
• Rinse and wash cannon tubes when changing chemical solutions.
• Apply an electrolytic reduction treatment for the iron and bronze cannons currently under treatment.
• Submerge and monitor treatment of Ordóñez cannon tube on prescribed solution.
• Remove concretions from Ordoñez cannon tube and carriage, 3 iron cannons, the Balista bronze cannon, and 120 shells.
• Apply inhibitors and finish coatings to the bronze cannon and shells currently under treatment.
• Supervision and monitor removal of cannons and shells from conservation area and their placement on exhibition at the fortifications.
• Coordinate treatment of objects with the material analysis/monitoring contractor to ensure proper conservation thresholds.
San Juan National Historic Site Page 3 of 4
• Perform in-situ treatment of metal artifacts and objects where necessary at NPS.
• Continue supervision of volunteers for the project.
• Continue collection of data pertaining these artifacts.
• Provide monthly progress reports detailing status of treatment for each object treated, laying out milestones achieved and/or difficulties encountered, and discussing needs that the project might have (equipment, supplies, manpower, etc.).
IV. DATA AND MATERIALS TO BE PROVIDED BY NPS
The items outlined herein will be provided (or have previously been provided) by the NPS for the use of the contractor, as required for the express purpose of completing the services required in this contract.
• Metal Objects Conditions Survey
• Metal Objects Conservation Plan
• Park Artillery Exhibit Plan
• The park will provide supplies (treatment chemicals, tools, etc.) and equipment (rental of digger, crane, etc.) needed to complete the services required.
• The park will provide at least a staff member that will work full time at the project. The employee(s) will be there to perform basic tasks associated to the project (changing solutions as needed and following indication from conservator, monitoring objects, perform basic cleaning of objects, etc.) and to maintain the workshop area (cleaning, cutting grass, etc). In particular situations (move and transportation of objects) the park may provide additional personnel.
V. CONTRACTOR’S MINIMUM SAFETY REQUIREMENTS
A. GENERAL
• Plan for possible emergency situations, such as floods, cave-ins, slides, and wind storms. Such planning shall take into consideration the nature of the work done, site conditions, and degree of exposure of persons and property.
• Conduct daily safety meetings for all personnel. These meetings shall be used to review the effectiveness of the Contractor's safety effort, and to resolve current health and safety problems.
• First Aid: Have adequate training to ensure prompt and efficient first aid.
B. QUALIFICATIONS OF EMPLOYEES
• Ensure that employees are physically qualified to perform their assigned duties in a safe manner.
• Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.
• Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all equipment.
C. PROTECTIVE EQUIPMENT
San Juan National Historic Site Page 4 of 4
• Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
VI. PROJECT PERSONNEL
A. GOVERNMENT REPRESENTATIVES
Contracting Officer:
Chad Williams
NPS, Everglades National Park
40001 State Road 9336
Homestead, FL 33034
B. Proposal Requirements
1. Each Offeror must submit a price proposal for the total work for the Base Year in addition to a price breakdown amongst each of the possible Option Years.
2. For comparison purposes, all proposals must include a per hour labor rate for work.
3. All proposals must include at least one example of past work performed by Offeror.
4. Proposals may be submitted by email directly to the CO, Chad Williams, at chad_williams@nps.gov.
mailto:chad_williams@nps.gov
Pictures of Artifacts
Santa Elena Workshop Area- Cannon Electrolisis Vats
Cannonballs & Mortar Shells in Treatment Area
Ordonez Cannon Barrel
Ordonez Cannon Carriage