This Statement of Work defines requirements for the removal and replacement of an existing unit heater at a facility in Anchorage, Alaska. The contractor must remove the existing heating unit and install one Modine HDB-100AS power vent/blower unit heater or an equivalent approved unit. All work must include proper disposal of the existing unit, installation of hangers and sway/earthquake stabilization supports in compliance with the International Building Code, reconnection to existing exhaust vent, ductwork, electrical connections, and gas piping, and procurement of all required permits. The contractor is responsible for providing all labor, materials, equipment, permits, and supervision necessary to complete the work.
The place of performance is 7010 Sand Lake Road, Anchorage, Alaska 99502, with a projected start date of August 15, 2026, and projected end date of December 15, 2026. Work must be scheduled in coordination with the facility representative and account for seasonal weather conditions and operational constraints. The contractor must possess necessary qualifications, licensing, and experience in mechanical/HVAC installation and equipment replacement, with all work completed in accordance with applicable building codes, safety regulations, and manufacturer installation requirements. Deliverables include proof of MOA permit and approval prior to or during installation and a fully installed and operational heating unit connected to utilities at project completion. The contractor shall notify the Contracting Officer's Representative upon completion for final inspection and acceptance. The Technical Coordinator will be provided after contract award is made.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Schedule.docx | DOCX document | |
| B08_Solcitation.pdf | ||
| Sol_140FC326Q0040.pdf | ||
| A06_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
1. General
This Statement of Work (SOW) defines the requirements for the removal and replacement of an existing unit heater at the project location in Anchorage, Alaska.
The purpose of this project is to remove the existing heating unit and install a new power vent/blower unit heater to ensure continued safe and reliable heating performance at the facility. The work will include removal and disposal of the existing unit, installation of a new heater, reconnection to existing utilities, and required structural support and stabilization.
The contractor shall possess the necessary qualifications, licensing, and experience in mechanical/HVAC installation and equipment replacement. The contractor shall ensure all work is completed in accordance with applicable building codes, safety regulations, and manufacturer installation requirements.
All work must comply with applicable local, state, and federal regulations.
Coordination with facility personnel may be required to ensure safe access and minimal disruption to building operations.
2. Place of Performance and Period of Performance (Where and When)
Place of Performance
7010 Sand Lake Rd
Anchorage, Alaska 99502
Period of Performance
• Projected Start Date: August 15, 2026
• Projected End Date: December 15, 2026
Work shall be scheduled in coordination with the facility representative. The contractor shall account for seasonal weather conditions, site accessibility, and any operational constraints that could affect installation activities.
3. Scope
The contractor shall provide all labor, materials, equipment, permits, and supervision necessary to complete the following work:
1. Remove and properly dispose of one (1) existing unit heater currently installed at the facility.
2. Furnish and install one (1) Modine HDB-100AS power vent/blower unit heater or equivalent approved unit. See Specifications document for listing of meet or exceed specifications.
3. Provide and install all required hangers and sway/earthquake stabilization supports to safely secure the new heater as required by the IBC.
4. Reconnect the new unit heater to the existing exhaust vent, ductwork, electrical connections, and gas piping as required for proper operation.
5. Obtain all required permits to complete all tasks in this SOW.
The contractor shall ensure the system is fully operational upon completion and shall verify that all connections are secure and function properly.
4. Deliverables or Delivery Schedule
The contractor shall provide the following deliverables:
Deliverable Description Quantity Delivery
Permit
Documentation
Proof of MOA permit and approval
Prior to or during installation
Final Operational
System
Fully installed and operational heating unit connected to utilities
At project completion
The contractor shall notify the COR upon completion of the installation for final inspection and acceptance.
5. Technical Coordinator
Will be provided after contract award is made.