A04_SOW.pdf
PDF 584 KB Posted
- Attached to
- ROOF REPLACEMENT @AZNN AGENCY BLDG Federal contract opportunity
- Solicitation number
- 140A2324R0102
About this file
This document is a Statement of Work (SOW) for a contract to furnish and install a new Thermo Plastic Olefin (TPO) roof system at the Western Navajo Agency Building #407 in Tuba City, Arizona. The SOW specifies that the contractor shall provide all materials, labor, equipment, and services to install approximately 15,912 square feet of new TPO roof membrane, including cutting and removing the existing TPO flashing and sealing the new membrane. The contractor is required to conduct a site visit and create a punch list of any deficiencies before project completion.
This SOW is related to a federal contract opportunity issued by the Department of the Interior, Bureau of Indian Affairs, Bureau of Indian Education, with the solicitation number 140A2324R0102 for the "ROOF REPLACEMENT @AZNN AGENCY BLDG" project. The contract is for a civilian agency requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08_Questions_and_Answers_Log.xlsx | XLSX spreadsheet | |
| WD_AZ20240043_08-16-2024.pdf | ||
| Attachment_SF25_Performance_Bond_-_2_Pages.pdf | ||
| Attachment__SF-1413_Statement_and_Acknowledgement_Form_(Subcontracting).pdf | ||
| Attachment_Health___Safety_Codes.pdf | ||
| Attachment__SF25A_Payment_Bond.pdf | ||
| Sol_140A2324R0102.pdf | ||
| Attachment__Bid_Bond_-_4_pages.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WESTERN NAVAJO AGENCY
AGENCY BUILDING# 407
TPO ROOF MEMBRANE INST ALL
STATEMENT OF WORK
Arizona avajo orth Facility (Western avajo Agency) solicits a licensed contractor to furnish and install new Thermo Plastic Olefin (TPO) Roof ystem assembly at Western avajo Agency y
Building #407 (approx. 15.912 total SF) in Tuba Cit . Arizona as specified herein.
As a service contract. contractor shall provide all materials, labor, equipment, power supply.
supervision. and transportation, and other services to install new TPO roof system at the Agency Building 407. furthermore. contractor shall be responsible for all mobilization cost of materials.
equipment. office trailer, storage. bins and other construction items before project start up and after project completion.
Upon completion of project, the COR and Contractor shall conduct a substantial completion walk-thru to identify any deficiencies before finalizing the project. The contractor shall create a punch-list to capture all deficiency item(s).
Contractor is required to make a site visit to conduct a field assessment to get acclimated with the existing conditions before project start-up.
Building 407 TPO Roof Membrane Install
Contractor shall:
Clean existing TPO Roof System of all sand and debris and sweep clean entire roof area.
*Building 407 roof top area includes (I) the main building rooftop area including the arch. (2) the front entrance rooftop, and (3) the Mechanical Room rooftop.
Cut or slice into existing TPO membrane with utility knife where applicable to provide proper breathing per manufacturer·s recommendation.
Carefully cut down all old existing TPO flashing from walls, pipes, curbs, roof penetrations in field area of roof system.
The existing gutter and metal drip edge will remain in place on the north end of the building.
Install new ½ . fan fold over existing TPO roof system and mechanically fasten to corrugated roof metal decking underneath.
Install new .60 mil Mulehide brand or equal brand TPO roof membrane system over new½ .. fan fold per manufacturer's specifications and instructions and weld seams into place. All seams longer than 2 feet shall be welded in place with an approved TPO Welding Machine approved by the TPO Manufacturer.