This document is a Statement of Work (SOW) for a federal contract opportunity to provide well drilling services for multiple observation wells on the San Bernardino National Wildlife Refuge (NWR) in Arizona.

The SOW requires the contractor to drill one deep observation well into an artesian aquifer, and eight shallow observation wells in the historic floodplain of Black Draw. The wells are for monitoring purposes only and will not be used for production. The contractor must obtain necessary permits from the Arizona Department of Water Resources, provide detailed drilling logs, and ensure the wells meet applicable state regulations. The period of performance is June 17, 2024 to December 30, 2024. The contractor is responsible for all drilling supplies, equipment, and travel costs. The government will not provide any furnished items or services. The contractor must have a quality control program and the government will conduct quality assurance surveillance.

The related federal contract opportunity is Solicitation Number 140FGA24R0016, titled "San Bernardino (NWR) Well Drilling", issued by the Department of the Interior Fish and Wildlife Service. The solicitation is for the well drilling services described in the SOW.

View the file

Other files

File Type Posted
Sol_140FGA24R0016_Amd_0001.pdf PDF
DOL_Wage_Determination.pdf PDF
Aerial_View_2.pdf PDF
Sol_140FGA24R0016.pdf PDF
San_Bernardino140FGA24R0016.pdf PDF
Well_Driller_Report.pdf PDF
Aerial_View_1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Drilling of multiple observation wells, Douglas AZ

Part 1 General Information

1. GENERAL: This is a requirement to provide well drilling services for multiple observation wells on San Bernardino National Wildlife Refuge (NWR). Wells are strictly for monitoring purposes only and will not be pumped or utilized as production wells.

2. Background: Efforts are being made to further assess impacts of actions on, and nearby the refuge, as they relate to the ground water and water recharge. This project will directly support and further data collection of ground water resources on refuge. The need for 1 designated deep observation well has been identified. The refuge also has a need to improve upon the shallow observation well system by strategically placing 8 new shallow observation wells in the historic flood plain of Black Draw. Data gained from all new observation wells will be utilized to better track and document changes in ground water, it will also be used in a larger ground water modeling project.

3. Objectives:

Deep Observation Well (1): Well will be drilled into an artesian aquifer and are expected to be flowing wells. Existing wells at this location are known to flow anywhere from tens of gallons per minute to over one hundred gallons per minute. (see kmz file for proposed location) Detailed descriptions of the wells and drilling requirements includes: Link will include the KMZ file https://fws-fileshare.box.com/s/evprsgmt7pbr3wjz7e50tj20ytvtiz4c

a) Water will be available near the site, but all other necessary drilling supplies and equipment shall be supplied by the driller.

b) Borehole will be drilled to an approximate depth of 600 feet. The geology above the bedrock consists of valley fill deposits and several basalt flows. A geologic log from a nearby well drilled in 2021 is provided in attachments.

c) Drill cuttings shall be collected in CGS bags every 20 feet or so during drilling.

d) After the borehole is complete, but before the well is installed, borehole geophysics to include the following will be collected as part of this contract by the driller.

Caliper Natural Gamma

Long and Short Resistivity Spontaneous Potential Temperature

e) The collected borehole geophysics and drill cuttings will be used to assess the appropriate screen interval for the well.

The well casing shall be schedule 80 PVC, contractor propose casing size in bid. The screen will consist of a single 20-foot section of 0.020 slot well screen. A generalized schematic is shown in attachments below.

f) The driller will be responsible for ensuring that the final well construction meets all applicable Arizona regulations for observation wells.

g) A generalized schematic for how the surface completions and wellhead should be completed is shown in attachments below. The driller is not responsible for purchasing and installing the check pressure gauge or transducer.

h) The drilling site and right-of-way shall be maintained in a safe, usable conditions.

i) Following completion of the each well, driller shall develop each well.

j) The drilling site shall be cleaned up after the wells are installed, with trash, rubbish, and other construction debris removed from the site and disposed of at a designated landfill. The grounds near the well shall be returned to their pre-construction appearance, or as near as possible.

Shallow Observation Wells (8): These wells will be drilled into the shallow aquifer and are expected to hit water between 10 to 20 feet based on nearby existing shallow observation wells. Detailed descriptions of the wells and drilling requirements includes:

a) The observation wells shall be drilled at multiple locations within the historic floodplain (see kmz file for proposed locations)

b) Water will be available near the site, but all other necessary drilling supplies and equipment shall be supplied by the driller.

c) Boreholes will be drilled to an approximate depth of 30 feet.

d) A generalized schematic for how each well should be constructed is shown in attachments below- shallow well casings shall be schedule 40 PVC, contractor propose casing size in bid.

e) The driller will be responsible for ensuring that the final well construction meets all applicable Arizona regulations for observation wells.

f) The drilling site and right-of-way shall be maintained in a safe, usable conditions.

g) Following completion of the each well, driller shall develop each well.

h) The drilling site shall be cleaned up after the wells are installed, with trash, rubbish, and other construction debris removed from the site and disposed of at a designated landfill. The grounds near the well shall be returned to their pre-construction appearance, or as near as possible.

*Protective covers with locking caps are needed on two (2) existing shallow observation wells.

o COMPLIANCE, PERMITS AND LICENSES Driller must be licensed for well drilling in the State of Arizona.

NEPA compliance for the proposed crossings will be the responsibility of the refuge.

4. Period of Performance: 06/17/2024-12/30/2024

5. Location Information: The work to be performed under this contract will be performed on San Bernardino NWR. Job site is approximately 15 miles east of Douglas, Arizona, on a graded dirt road. The nearest facilities are located in Douglas. The project area lies in a remote area adjacent to the international border of Mexico and the United States.

Sierra Vista, Arizona is 65 miles west of the refuge and Tucson, Arizona, is 100 miles northwest of the refuge.

6. Gate Locks: Access does require passage through locked gates; access codes will be provided.

7. Recognized Holidays: The Contractor is not required to perform work on these holidays.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

8. Hours of Operation: The contractor is responsible for conducting business between the hours of 6:00 am to 7:00 pm , Monday thru Friday, except Federal holidays at the Contractor’s option. The Contractor must at maintain an adequate workforce for the uninterrupted performance of all tasks defined within this SOW when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. Any hours outside of the hours listed must be approved by the COR.

9. Quality Control: The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this SOW. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which they assure themselves that their work complies with the requirement of the contract.

10. Quality Assurance: The government shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

11. Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance.

12. Contracting Officer Representative (COR): The (COR) will be issued at the time of award. The COR monitors all technical aspects of the contract and assists in contract administration. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates.

13. Key Personnel: The following personnel are considered key personnel by the government: Contract Manager and Site Project Leader. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the COR. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 am to 5:00 pm, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.

14. Identification of Contractor Employees: All contract personnel attending meetings and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

15. Contractor Travel: Contractor will be responsible for all travel cost and scheduling of travel.

16. Other Direct Costs: At the contractor’s option, partial payments can be requested to cover the cost of equipment and materials obtained by the contractor for this project. Final payment will be made upon Refuge acceptance following total completion of the project by the contractor. Upon completion and acceptance of all work and receipt of a proper invoice, the contractor will be paid the balance of the firm fixed-price of the contract.

PART 2

DEFINITIONS & ACRONYMS

DEFINITIONS AND ACRONYMS:

DEFINITIONS:

i CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

ii CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

iii CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

iv DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

v DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

vi KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the SOW. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

vii PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

viii QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

ix SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

x WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

xi WORK WEEK. Monday through Friday, unless specified otherwise.

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

GOVERNMENT FURNISHED ITEMS AND SERVICES:

There are no Government furnished items or services.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

FURNISHED ITEMS AND RESPONSIBILITIES:

General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this SOW.

PART 5

SPECIFIC TASKS

SPECIFIC TASKS

Driller will obtain necessary permits and paperwork from the Arizona Department of Water Resources (ADWR), including filing a Notices of Intent to install the wells, before construction and then provide a drillers log and other required well-registration paperwork upon completion of the wells.

Drill (8) Shallow Observation Wells in accordance with specification provide Part 1.

Drill (1) Deep Observation Well in accordance with specification provide Part 1.

Provide (2) Protective covers with locking caps are needed on two (2) existing shallow observation wells.

The driller will utilize and fill out the provided detailed drilling log per well.

PART 6

ATTACHMENT/TECHNICAL EXHIBIT LISTING

Generalized schematic for 600 foot well.

Generalized schematic for deep wellhead design.

Geologic log of well drilled near proposed site of new deep observation wells.

Generalized schematic for shallow 30 foot wells.

SBNWR Proposed Shallow Observation Well Location

File details come from the government source that posted it. Updated .