A04_SOW.docx
DOCX document 15 KB Posted
- Attached to
- SNDO ENGINE REPAIR Federal contract opportunity
- Solicitation number
- 140L3922Q0040
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B03_SCA_Wage_Determination.pdf | ||
| Sol_140L3922Q0040.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fleet Repair Statement of Work Southern Nevada BLM Crew Haul 5B (I-429422)
1. Purpose and Need: To obtain service, labor, and parts required to complete all work items repairs required by list below.
2. General Service Statement of Work:
The following items need to complete based on the initial diagnoses of vehicle:
-Replace Cylinder Head, Gasket and Valves -Replace Main Crankshaft and Connecting Rod Bearings -Replace Engine Oil Pump -Replace Power Cylinder -Replace Engine Oil, Filter, Coolant and Fuel Filters -Replace Camshaft- Including Tappets and Bearing Kit -Install cylinder head kit -Install high pressure kit with gasket -Install exhaust gasket
3. Work Order: All work must be completed by a current certified International Mechanic. A written notice to proceed will be issued by Contracting Officer to the Contractor stating when the work is to begin. Work must be completed by the period of performance specified by Contracting Officer.
4. Workmanship Requirements: The installation of parts such as hinges, catches, handles, or knobs shall be accomplished to avoid damaging the hardware or the mounting surface after fabrication. All parts shall be cleaned of the following: smudges, loose, spattered, or excess welding, metal chips, or filings or any other foreign material which might detract from the intended operation, function, or appearance of the apparatus or its equipment. This would include particles which could loosen or become dislodged during the normal expected life of the equipment. Whenever possible, this cleaning shall take place before the parts are assembled.
Threaded parts or devices shall show no evidence of cross-threading, mutilation, or detrimental burs. All screw type and rivet fasteners shall be tight, with no relative movement between the attached parts. All bolts and screws shall not be tightened in excess of the SAE torque standard established for the grade, screw, and thread type.
5. Contractor must ensure all parts are available with current pricing to meet the specified period of performance, prior to bidding and or accepting solicitation.
File details come from the government source that posted it. Updated .