A04 SOW.docx
DOCX document 14 KB Posted
- Attached to
- MT-CRESTON NFH-GRND BASED GEO HEAT-PUMP Federal contract opportunity
- Solicitation number
- 140F0521Q0028
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B12 MISC Notice to Offerors.pdf | ||
| B01 Comb Syn-Sol 140F0521Q0028.doc | DOC document | |
| Sol_140F0521Q0028.pdf | ||
| WD 15-5402.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
GEOTHERMAL HEAT PUMP REPLACEMENT
General *The ground sourced heat pump at the Creston National Fish Hatchery, Kalispell, MT has failed.
*Contractor must be licensed and qualified for working with the heat pump system to be replaced.
*All federal, state, and local laws, regulations and ordinances shall be adhered to relating to this project and its scope.
| Project Location: | Creston National Fish Hatchery | |
| 780 Hatchery Road | ||
| Kalispell, MT 59901 |
Project Dates: May 24, 2021 through September 1, 2021
| Normal duty hours: | Monday through Friday | |
| 8:00 am – 4:30 pm |
Non-duty hours include week nights, weekends and Government holidays (New Year’s Day, Martin Luther King Jr Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day)
Project Scope
The contract shall remove and dispose of the existing geothermal heat pump equipment and replace with a new 10 ton high-capacity geothermal heat pump and associated components. All necessary modifications associated with the heat pump replacement are to be completed in accordance to manufacturer specifications.
Deliverables and/or Delivery Schedule
The contractor shall supply all required equipment, tools, and associated components required for replacement of the geothermal heat pump.
Contractor shall supply all documentation and operator/owner’s manual for the newly installed equipment
Evaluation and Acceptance
Contractor performance will be evaluated by designated Hatchery personnel, according to the quality of work performed and the functionality of the newly installed equipment. The Hatchery manager will accept the work when he/she is satisfied with the work.
Quality Control
Quality control and quality assurance shall be conducted through out the course of project completioin by designated hatchery personnel. The Hatchery manager will be the approving authority for all completed actions.
Technical Coordinator Travis Silvka, travis_silvka@fws.gov, 406-758-6884 Secondary Coordinator