A04_SOW.docx
DOCX document 30 MB Posted
- Solicitation number
- 140FS225Q0103
About this file
This Statement of Work (SOW) details a vegetation management project for the Las Vegas National Wildlife Refuge (NWR) in New Mexico. The project requires hand-cutting and piling of juniper and pinon trees across 30 acres along the eastern boundary of the refuge, specifically within 70 feet of Pagosa Creek's rim. Contractors must use chainsaws and manual labor, with no heavy equipment permitted, and access the site via a 2-track road, UTV, or on foot. The work is to be completed between February and December 2025, with specific requirements including creating 8x8 foot slash piles in open spaces at least 25 feet from remaining trees, while minimizing ground impact during the process. The project is associated with Solicitation Number 140FS225Q0103 and will be overseen by the Department of the Interior Fish and Wildlife Service, with on-the-ground guidance provided by refuge staff.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS225Q0103.pdf | ||
| B08_-_Past_Experience_and_References_Form.doc | DOC document | |
| B03_Wage_Determination_1969-0115.pdf | ||
| A04_SOW___Fire_Suppression_Plan.docx | DOCX document | |
| B12_Misc___Notice_to_Quoters.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Las Vegas NWR Grasslands Restoration Cut and Pile Project on USFWS Lands Las Vegas, NM January 2025
BACKGROUND
This Statement of Work summarizes the justification and payment for cutting and piling encroachment trees within the Las Vegas National Wildlife Refuge in northern New Mexico. This scope of work describes the terms and period of performance for a vegetation and tree cut and pile project for the US Fish and Wildlife Service.
DESCRIPTION OF PROJECT NEEDS
The Las Vegas NWR is interested in implementing a cut and pile project to push back juniper and pinon encroachment on the eastern boundary of the refuge. The project is 30 acres. The work must be cut by chainsaw and piled by hand. No heavy equipment will be authorized for the project. An established 2-track borders the project area to the west to help gain access to the area. Any areas not near the 2-track will be accessed by UTV or foot. The target timeframe for implementation will be February- December 2025.
Place of Performance The work under this contract will be performed at the Las Vegas NWR. The job site is in Las Vegas, NM. I-25 is the nearest highway to the refuge approximately 5 miles away.
Scope of Work The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the project which will consist of hand crews using chainsaws to remove all juniper and pinon trees <12” diameter at root collar (DRC) and piling the slash >70’ from the rim of Pagosa Creek. Slash will be carried when piled to minimize impact to the ground. Piles made will be approximately 8X8 and must be made in open spaces that will not impact leave trees. Piles should be no closer to leave trees than 25 feet. The contractor shall perform to the standards in this contract and will have on-the-ground guidance project and planning guidance directed by refuge staff.
Objectives:
· Cut and pile trees less than or equal to <12” DRC within the identified project boundary.
· Create 8’X8’ piles at least 70’ from the canyon's rim and in open spaces that will not impact leave trees.
· Maintain proper safety and efficiency measures as directed by refuge personnel and crew leader.
Period of Performance The period of performance for this project shall be February- December 2025.
Table1. Operating Time Restrictions. An “X” marks periods of performance that are allowed.
| UNIT |
| Jan |
| Feb |
| Mar |
| Apr |
| May |
| Jun |
| Jul |
| Aug |
| Sept |
| Oct |
| Nov |
| Dec |
Project Boundary
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
| X |
Hours of Operation The Contractor is responsible for conducting business, between the hours of sunrise to sunset Sunday through Saturday except for Federal holidays at the contractor’s option. The contractor must, always, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this contract when the government facility is not closed. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential. The facility is closed on recognized Federal holidays. The contractor is not required to perform work on these holidays:
New Year’s Day, January 1st or the Friday preceding or Monday following Martin Luther King’s Birthday, 3rd Monday in January President’s Day, 3rd Monday in February Memorial Day, Last Monday in May Juneteenth, June 19th or the Friday preceding or Monday following Independence Day, July 4th or the Friday preceding or Monday following Labor Day, 1st Monday in September Columbus Day, 2nd Monday in October Veteran’s Day, November 11th or the Friday preceding or Monday following Thanksgiving Day, 4th Thursday in November Christmas Day, December 25th or the Friday preceding or Monday following
Project Contact Clyde Burris 505-506-0719 Clyde_burris@fws.gov Contracting Officer’s Representative (COR) The Contracting Officer Representatives (COR) are Clyde Burris can be reached at 505-506-0719 or via email at clyde_burris@fws.gov. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions:
· Assure that the contractor performs the technical requirements of the contract.
· Perform inspections necessary in connection with contract performance.
· Maintain written and oral communications with the contractor concerning technical aspects of the contract.
· Issue written interpretations of technical requirements, including Government drawings, designs, and specifications.
· Monitor the contractor's performance and notifies both the Contracting Officer and contractor of any deficiencies.
· Coordinate availability of government-furnished property and provide site entry for contractor personnel.
SPECIFIC TASK
The contractor shall remain in close contact with the FWS COR and Staff. The contractor is responsible for ensuring all pertinent information is clearly understood. Contractor will:
· Relay all the job task information to the workforce prior to the first day of work.
· Follow all protocols for accessing the project area and avoidance areas as described by refuge staff.
· Meet regularly with refuge staff to discuss the progress and plans for the following day.
· Assist in changes and modifications to the plan and workday as needed.
· Perform all the objectives as listed in “Scope of Work”.
· Adhere to the daily schedule.
· Follow all National Wildlife Refuge Rules and Regulations, including fire safety while on site.
Project Maps image5.jpeg image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.png image15.png image16.png image17.png image18.png image19.png image20.png image21.png image22.png image23.png image24.png image25.png image26.png image27.png image28.png image29.png image30.png image31.png image32.png image33.png image34.jpeg image35.png image36.png image37.png image38.png image39.png image40.png image41.png image42.png image43.png image44.png image45.png image46.png image47.png image48.png image49.png image50.png image51.png image52.png image53.png image54.png image1.png image55.png image56.png image57.png image58.png image59.png image31.jpeg image32.jpeg image33.jpeg image35.jpeg image2.png image3.png image4.png
File details come from the government source that posted it. Updated .