A04 SOW.doc

DOC document 80 KB Posted

Attached to
TERRY BADLANDS WSA Federal contract opportunity
Solicitation number
140L3421Q0008
Issued by
Department of the Interior Bureau of Land Management Montana-Dakotas

View the file

Other files for this federal contract opportunity

Other files attached to TERRY BADLANDS WSA, newest first.
File Type Posted
A04 Map 3 - Terry Data.jpg JPG image
A04 Approved Surfactants.xlsx XLSX spreadsheet
A04 Map 2 - Terry Project Map 2.pdf PDF
B03 SCA Wage Rates.pdf PDF
A04 Map 1 - Terry Project Map 1.pdf PDF
A04 Approved Herbicides.xlsx XLSX spreadsheet
Past Performance Questionnaire.doc DOC document
Sol_140L3421Q0008.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Terry Badlands WSA Noxious Weed Control 1.

Description: The Bureau of Land Management (BLM) has a requirement for noxious weed treatment on one project on BLM land within specific areas in Prairie County in Eastern Montana. Treatment for the project is 217 acres. This project contains a priority weed species. However, any additional weed species that are listed on the Montana Noxious Weed Species List shall also be identified and treated per the requirements of this SOW.

IMPORTANT: The project area identified above (also shown in corresponding maps) shall be treated in their entirety before moving to another priority area. For this to be accomplished, weeds shall be followed from the drainages into the upland areas ensuring full treatment of the weeds. This may require hiking and/or backpack spraying. A priority shall not be considered complete and/or accepted if the area has not been covered/treated properly.

PERIOD OF PERFORMANCE: Work will be performed from approximately June 1, 2021 through August 2, 2021.

PROJECTS:

Project 1:

This project is called the Terry Badlands WSA project and is in Prairie County MT.

The treatment requirement is 217 acres of BLM land. The priority spray areas are listed below. The contractor shall begin with priority area one and continue through the priority areas until the 217 acres requirement is met. This means that there is a possibility that some of the latter priority areas will not be treated.

a. Weed Priority Area 1: Terry Badlands Wilderness Study Area (WSA) priority treatments are the roads leading into the WSA as well as the draws/drainages in and around the public access areas along the Calypso Trail. The priority area concludes at the parking area of the Natural Bridges (see black dots on Attachment 3). The weed infestations are found in the drainages and moving into the uplands. The terrain is extremely rugged. Backpack work will be necessary to complete this project. Contractors must stay on the two track roads while using UTV/ATV’s. Off-road driving is not allowed. Any spraying completed off the two tracks must be completed with a backpack sprayer.

b. Weed Priority Area 2: The remaining WSA outside of Priority Area 1. This area primarily contains leafy spurge. Follow drainages and into the uplands.

2.

The Contractor Shall:

· Submit a General Work Plan within three days of contract award. A General Work Plan shall contain the following:

· Schedule for starting and completing work.

· General description of operating procedures.

· Methods to ensure thorough coverage of the contract area.

· Methods of application, i.e., type of equipment to be used in various situations.

· Methods to ensure effective application of herbicide to large, old plants.

· Comply with Federal and Montana state pesticide laws.

· Be a licensed applicator for both general and restricted use pesticides and apply according to label specifications (Label Specifications are on the back of herbicide containers) and BLM guidelines within the H-9011-1 Handbook (http://www.blm.gov/ca/st/en/prog/weeds/9011.print.html).

· Provide copies of pesticide application records for each application site, recording the date of application, start time, finish time, amount of herbicide, surfactant, and dye applied, application rate, type of equipment used, weather, location, pest treated, and acres treated on public land and these will be submitted to BLM COR (Brenda Witkowski) every 2 weeks.

· Herbicides will only be applied by ATV mounted sprayer, truck mounted sprayer or by backpack sprayers calibrated not to exceed label rates.

· Adhere to the Standard Operating Procedures identified in Appendix 1 of this Statement of Work. Ensure that all personnel handling pesticides have read the appropriate MATERIAL SAFETY DATA SHEET (MSDS).

· Locate and GPS areas of noxious weeds infestations within the specific sections listed (see maps). All areas must be mapped using GPS units and that information (metadata included) will be submitted every two weeks along with the Pesticide Application Records to the BLM COR (Brenda Witkowski).

· Provide a report describing your work with photos of treated sites. Inventory for new patches of noxious weeds on a continuous basis when in the project area. A minimum control of 90% is required on weed treatments. Performance standards are dead noxious weeds, standing noxious weeds with no developing (or developed fertile) flower/seed heads, and dead rosettes (rosettes present pre-treatment). The BLM will conduct compliance inspections of contractor treated sites.

· Provide the equipment and trained personnel to treat noxious weed infestations on public land as identified. Ensure all PPE and OSHA Standards are followed.

· Provide supervision to ensure the project is completed safely and herbicides are applied according to label specifications and BLM guidelines.

· The contractor shall be responsible for contacting the grazing permittees to schedule the herbicide application. The contractor shall return the confidential list of permittees to the contracting officer upon completion of the contract.

· Only used herbicides/adjuvants approved by the BLM (See Attachments 1 and 2).

· Any weed infestations found outside the polygon area must be pre-approved for treatment by the Contracting Officer. Any please contact the COR (Brenda Witkowski) for approval to treat. Any additional weed treatment outside the acres defined in this requirement must be pre-approved by the Contracting Officer.

· A pre-work conference may be scheduled upon award of contract. Contractor will be notified of conference date.

3.

BLM Shall provide:

· A list of BLM approved herbicides/adjuvants that can be applied on BLM lands.

· Maps of specific project areas.

· List of noxious weeds to be treated on public lands.

· Contact information will be provided for private landowners. Contact information must be returned to contracting officer at completion of contract.

4.

Communications and Invoicing:

· Contractor shall give weekly updates on progress to both the COR and the CO.

· Upon completion of field work and submission of all required data/application records, contractor shall give WRITTEN notice to both the COR and the CO via email. GIS data (meta data) shall be accurate and include appropriate points, lines, and polygons. Application records shall be completed properly and include all required information. Failure to give written notice of completion to both the COR and the CO may result in delay of inspection.

· The COR will complete a field inspection 2 weeks after written notification that the work has been completed and all deliverables have been submitted.

· Contractor shall submit an invoice electronically in IPP only upon notification that inspection has been completed and the work has been accepted. Invoices submitted prior to inspection shall be rejected.

5.

Data and Map Standards:

The purpose of this document is to address contract data collection standards, GPS accuracy and precision requirements, and data processing for GPS data collection and to make recommendations for standards in recording of positional data.

The FGDC specifies that the Geospatial Positioning Accuracy Standards be used to evaluate and report the positional accuracy of geospatial data produced, revised, or disseminated by or for the Federal Government. “Executive Order 12906 Coordinating Geographic Data Acquisition and Access: The National Spatial Data Infrastructure” designates the FGDC as responsible for setting these standards. (Appendix 2)

The NSSDA was designed to replace the National Map Accuracy Standard (NMAS) developed by the Bureau of the Budget in 1947. The applicability of NMAS is limited to graphic maps, as accuracy is defined by map scale. The NSSDA was developed to report accuracy of digital geospatial data that is not constrained by scale. The USGS used NMAS in the production of the topographic map series.

Characteristics of The National Map Accuracy Standard are:

• Horizontal Accuracy is 1-5 meters (3-15 ft)

• Vertical Accuracy is 1-5 meters (3-15 ft)

GPS feature types to be collected:

Point values – 0.10 acres. Each GPS point collected represents 1/10th acre.

Line values – 20 ft buffer. Each line value represents line length (ft) x 20 ft wide.

Polygon values – represents actual sprayed area contiguous but allows for aggregation of non-sprayed areas within the polygon.

Note: If collected line values, i.e., drainages, transportation corridors, goes beyond the allotted buffered distance, polygon collection must begin.

GPS Positional Accuracy Accuracy is dependent on several factors. Several factors that can significantly impact data accuracy can be monitored in the field: the number of satellite vehicles, Positional Dilution of Precision (PDOP), signal-to-noise (SNR) and Estimated Horizontal Error (EHE). One should always acquire at least 4 satellites. This gives you a 3D position. More satellites are better than fewer. PDOP relates to satellite geometry at a given time and location. Keep the PDOP as low as possible (ideally, maximum PDOP=6) when collecting mapping data. Some receivers have the ability to limit collection of GPS data if certain GPS quality measures such as PDOP, SNR and number of satellites are out of range. These are referred to as masking. Most receivers (but not all) give you a field estimate of horizontal error (EHE or EPE). With the Rockwell PLGR and Garmin line of receivers, the EHE (or EPE) has been shown to be a very good indicator of overall positional accuracy (most of the time your accuracy is going to be better than the EHE).

SBAS (Space Based Augmentation System) should be used whenever possible. This removes the greatest source of errors remaining in the GPS error budget. Post-process differential GPS can be obtained from the Cors base stations available from the web or local community Cors base stations.

Real-time differential corrections and post land tied differential corrections should be used at all times.

Receiver-Specific Recommended Settings:

Garmin Map 72 and 76, 60 series, Etrex series:

1. EHE: less than or equal to 12 meters. This will keep you just within the NMAS for a 1:24,000 map, which is the maximum acceptable.

2. Minimum of 4 satellites (3D) for every position.

3. Enable the WAAS real-time differential correction.

** Note: Because neither of these units operating in autonomous mode can mask for GPS quality, it is up to the user to monitor constantly the Satellite page for quality. Noting that positions above PDOP standards can be delineated in post processing.

Trimble units Pathfinder Systems (GeoExplorers, GeoXH, Geo7X):

1. PDOP: less than or equal to 6 (we recommend starting with a PDOP maximum of 4 and shifting to 5 if data collection is not successful at 4; this will keep you around the NMAS for a 1:5,000 map).

2. Minimum of 4 satellites (3D) for every position.

3. SNR: no less than 5, recommended 10 and above.

4. Elevation Mask: 15.

5. Antenna height: be sure to check for correct antenna height setting. This setting should be the typical height at which the antenna will be carried. If the antenna is attached to a pole, it must be located above the user’s head and the antenna height setting should be the height of the top of the pole. Wherever possible, the antenna should be clear of any obstructions.

6. Position Type: Must be post-processed or real-time differentially corrected.

Receiver-Specific Recommended Download Best Management Practices

All Garmin Units:

Use the FREE Minnesota DNR Garmin program to download and convert data.

ftp://ftp.dnr.state.mn.us/pub/gisftp/DNRGPS/dnrgps_6_1_0_6_for_Arcmap_10_0.zip Trimble units Pathfinder Systems:

ArcPAD: please submit all collected shapefiles and associated GPScorrect file.

Terrasync: Use Pathfinder office to import, differentially correct and export shapefiles with a defined projection system. Include. ssf, cors, and exported shapefiles.

Attribute Data Data dictionaries (e.g., Trimble) or data collection forms (e.g., ArcPAD) are designed to simply, efficiently, and without redundancy, describe features (landscape, biological, cultural, or historical). A data dictionary or form organizes data into types or ‘themes’ and reduces user error when entering values. It is an efficient use of time and energy to employ this type of data collection. Set up a menu and picklists in a database and load them into the GPS unit or data collection device prior to going out into the field. Create and use a data dictionary or data collection form whenever possible to collected attribute data.

Projection and Coordinate System All digital geospatial data should reference the coordinate system appropriate for its use and it should be documented in the metadata. All spatial data collected or submitted for national, regional, or network BLM programs shall be geo-referenced and provided in a standard projection. Digital geospatial data should be referenced to the following coordinate system—WGS 1984, decimal degrees. The steps used to get the data into the proper projection or exported from the GPS unit must be documented in the metadata. The contractor must specify and document any deviation from these projection standards.

GIS/GPS Contract Deliverables:

1) Data collected by GPS, digitized by tablet or hands on, or scale - scanned must be:

ESRI shapefile, geo-database feature class or ArcInfo export

Datum: D_North_American_1983 or WGS 1984

Have a defined projection.

2) Digital data will be delivered by USB medium.

3) Metadata will be attached as text or XML, to follow FGDC metadata standards as defined in link: https://www.fgdc.gov/metadata/csdgm-standard. Metadata should be clear and concise only describing details about the data as defined by the FGDC standards. All seven steps described in the above link are mandatory and should be completed prior to submission.

APPENDIX 1

STANDARD OPERATING PROCEDURES AND HERBICIDE APPLICATION

SAFETY, EQUIPMENT & APPLICATION

· The safety of the public shall be a primary consideration when conducting treatments.

· Contractor will provide sufficient clean water to assure the opportunity for workers to wash off any chemicals splashed inadvertently onto skin or in the eyes.

· All personnel involved in pesticide application must be trained and licensed. Protective clothing and equipment, as specified on EPA‑approved labels and the BLM H‑9011‑1 Handbook (i.e., coveralls, unlined rubber gloves and boots, safety glasses, hard hat, respirator, as appropriate) will be worn by workers directly involved in herbicide applications and by employees using hazardous tools/equipment. The applicator must have and maintain a Montana Pesticide license or be trained in the use of herbicide application and working under the direction of a licensed applicator. All personnel handling pesticides will read the Material Safety Data Sheet and the label for each product prior to handling or applying the pesticide.

· While mixing and loading, the individuals will wear appropriate protective gear as specified on the chemical label (examples‑‑‑ full length apron, face shield, unlined rubber gloves, liquid repellant footwear).

· Spray pressures for hand- held spray gun and/or boom will meet label and nozzle tip requirements. All equipment shall be properly calibrated before applications are made and to prevent gross errors in the field while mixing. Regular testing on field calibration and calculation will take place (once a month during use or more often if used frequently.)

· Spray nozzles on ground vehicles must be set to produce spray droplets with a median diameter of 200 microns or larger. Ground vehicle equipment will normally operate with a boom pressure of 20 to 35 pounds per square inch unless the product label specifies a different pressure. Backpack and/or hand sprayer application of liquid herbicide will occur with low nozzle pressure (25 lbs psi) and within 2.5 feet of the target plant.

· Herbicides will be mixed and loaded in an area where an accidental spill cannot flow into a stream or water body or contaminate groundwater. No mixing is allowed in riparian areas. Applicators are required to have an emergency spill kit to mitigate small spills. Spills of any size will be reported to the BLM MCFO.

· Low volatile formulations of phenoxy herbicides will be used to reduce the potential for off‑site contamination.

· Where vehicle and hand applications of herbicides are used, the wind velocity must be 8 mph or less, except in riparian areas where the wind speed must be 5 mph or less unless the label states differently. Do not spray when wind is less than 1 mph and no spraying when heat index in greater than 90 degrees Fahrenheit.

· Equipment shall be cleaned only in specifically designated areas away from waterways and reservoirs, wells, and stock tanks. All containers shall be triple rinsed and rinsate used in the spray tank. Containers will be disposed of at a state collection site for recycling, an approved landfill, or other specifically designated areas according to State, Federal, and County laws.

· The licensed applicator will provide copies of pesticide application records for each application site, recording the date of application, start time, finish time, amount of herbicide, surfactant, and dye applied, application rate, type of equipment used, weather, location, pest treated, and acres treated. Records will be completed within 24 hours of application and submitted biweekly or upon request of the BLM. This record will be maintained in the BLM project file.

· Fire Prevention and Liability: The contractor may be held liable for all operator fire starts. All applicable state and local fire prevention laws must be followed by the Contractor and the Contractor’s employees unless written direction is provided by the Contracting Officer. The Contractor shall have a safety plan in place. The Contractor shall be responsible for ensuring all equipment is operated and maintained in a safe manner, has means of communications before and after application, has a plan of action should a fire start, notify appropriate dispatch center or 911 immediately of the location and status of any unplanned ignition, and notify the COR and the CO immediately of any incident.

TREATMENT

Treatments will be conducted in accordance with applicable Federal, State, and local government regulations, including the Sikes Act (16 U.S.C. 670 eL seq.), as amended, the Federal Land Policy and Management Act (http://www.blm.gov/flpma/), the Federal Noxious Weed Control Act (http://ipl.unm.edu/cwl/fedbook/fedweed.html) as amended in Section 15 of Public Law 93‑629. These laws and policy provide direction for BLM to coordinate with appropriate State and County entities and those related weed control agencies and to operate in harmony with State (http://www.montana.edu/wwwpb/pubs/mt9605.html) and County weed control laws (http://mtwow.org/weed-laws.htm).

· Hand pulling and using hand tools to remove noxious weeds may be used when no other means are available to control or eradicate the targeted noxious weed. This method may be effective on new infestations. Gloves and protective clothing will be worn.

· Ordinarily, several considerations govern the choice of treatment method. The choice first depends upon the species of noxious weed. Treatment objective, topography of the treatment area, expected costs, and equipment limitations are implied considerations. Another consideration is the selectivity of the herbicides.

· Commercial products for noxious weed treatment will only be used if the noxious weeds are susceptible to the herbicide, i.e., that is with one treatment the herbicide will retard 90 percent of current years’ growth of the target noxious weed. In large dense stands, 90 percent control may not be realistic the first year.

· Effort should be made to reduce adverse effects of spraying on several non-target woody plant species (Bur oak, green ash, American elm, chokecherry, Juneberry, wild plum). These species are important for wildlife habitat, soil stability and visual resources.