This document is a Statement of Work (SOW) for the Egan Basin 2024 Lop and Scatter project. The contractor will be responsible for furnishing all labor, equipment, supervision, transportation, supplies, and materials to lop and scatter 2,426 acres of pinyon and/or juniper trees in White Pine County, Nevada. The project area is located approximately 60 miles northwest of Ely, NV near the Egan Range.
The SOW outlines the specifications for the lop and scatter treatment, including cutting trees close to the ground, scattering slash, and avoiding damage to fences and roads. Environmental considerations, such as avoiding wet areas and restrictions on work during inclement weather or sensitive periods, are also detailed. The contractor will be required to attend a pre-work conference and progress meetings, and the work will be measured and paid for by the acre. The period of performance is one year from contract award, with no work allowed between March 1st and July 1st.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3924Q0070.pdf | ||
| A06_Map_2.pdf | ||
| A06_Map_4.pdf | ||
| Bid_Schedule.docx | DOCX document | |
| A06_Map_1.pdf | ||
| A06_Map_3.pdf | ||
| B03_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Egan Basin 2024 Lop and Scatter Statement of Work A. Project Area Description and Location
The contractor is responsible for furnishing all labor, equipment, supervision, transportation, supplies and materials to lop and scatter 2,426 acres (Units 1-6) of pinyon and/or juniper trees. A maximum of 2,426 acres would be treated under this contract. Trees to be cut are pinyon and juniper. Leave areas and boundaries may be altered prior to implementation of the project to mitigate sensitive resource concerns that may reduce the acreage.
The project area is located in White Pine County, State of Nevada, approximately 60 miles northwest of Ely, NV, approximately five miles southwest of Cherry Creek, NV. The project area is located in Egan Basin and Butte Valley near the Egan Range (refer to attached maps). There are several unimproved roads that intersect the treatment units. It is advised that potential bidders become familiar with the access within the units.
Although the roads are in good condition, four-wheel drive vehicles and ATVs/UTVs are recommended due to the potential for unexpected inclement weather conditions.
Overland travel may be authorized by the BLM to access the units with ATV’s/UTV’s. This will be determined on a unit by unit basis, by the BLM. There are private lands adjacent to the treatment units. It is the contractor’s responsibility to secure permission to cross these lands if they wish to do so.
The following legal land descriptions apply:
· Township 23 North; Range 62 East; Sections 23-26, 35, 36; MDM
· Township 22 North; Range 62 East; Sections 1, 2, 12, 27, 28, 32-34; MDM
· Township 21 North; Range 62 East; Section 4, 5, 7-9, 16, 17, 19-21, 29-32; MDM The treatment area boundaries will be outlined on a map provided by the Government. The Contractor will be responsible for ensuring that they are within treatment boundaries by utilizing a Global Positioning System (GPS) unit. The contractor may flag the boundaries of the unit at their discretion however, the contractor would be responsible for the removal of all flagging. Leave areas and boundaries may be altered prior to implementation of the project to mitigate sensitive resource concerns.
It is recommended that potential bidders become familiar with access to and within the sites, the density of the trees to be cut and the trees to be left by unit, and the timing restrictions by unit (see Section C).
B.
Specifications
a. Lop and Scatter Lop and scatter treatments will be conducted within the treatment units specified within the shapefile and the attached map (Units 1-6). Boles shall be cut as close to the ground as possible with a target stump height of less than 6 inches (90% or more of stumps cut) and a maximum height of 12 inches (not to exceed 10% of the stumps cut). Slash shall be scattered with a maximum height of 24 inches above ground level or the height of the surrounding shrubs (whichever is higher). Stumps will be cut where there are no living branches, bark or other parts of the tree left attached. All Pinyon and Juniper within the units will be cut regardless of the height of the tree. Some units are very sparse and have young trees (less than 2 feet in height) growing. All of these trees must be removed.
Cutting and slashing will occur to trees that are part of a fence line, unless damage to the fence will occur. Slash shall be pulled back at a minimum or 5 feet from the fence line to allow travel for wildlife.
Any tree that is severed/slashed and blocks any road, two-track, trail, or barrow ditch/road cut shall be moved to allow travel by vehicles or UTV/ATV and upkeep of roads. Contractor shall keep roads clear and free from cut trees.
In certain units there may be leave trees designated. These will be trees exhibiting old growth characteristics that are not within GRSG Habitat. These trees will be marked with flagging and the contractor will be informed about them prior to beginning the treatment unit.
A requirement of no more than one live stem per acre remaining after treatment will be adhered to. If inspections indicate the quality of the work does not meet this standard the unit will be reworked. The worksite will be randomly sampled during inspections by the government representative via a transect and communicated to the contractor point of contact. The sampled areas may involve portions of a unit and not the entire unit and will be at the discretion of the government representative.
Contractors are to submit a single bid for each line item on a per acre basis using the table in Attachment 1.
Table 1 – Table of treatment units by line item, treatment and size.
| Line Item |
| Unit Number |
| Treatment Description |
| Total Acres |
| 010 |
| Unit 1 |
| Lop and Scatter |
| 71 |
| 020 |
| Unit 2 |
| Lop and Scatter |
| 245 |
| 030 |
| Unit 3 |
| Lop and Scatter |
| 43 |
| 040 |
| Unit 4 |
| Lop and Scatter |
| 219 |
| 050 |
| Unit 5 |
| Lop and Scatter |
| 885 |
| 060 |
| Unit 6 |
| Lop and Scatter |
| 963 |
C.
Environmental Considerations
The project site shall be cleaned up, and all refuse removed to an approved landfill at the Contractor’s expense. The Contractor shall not disturb lands adjacent to the project site. Existing access roads and trails within the project area that are damaged by the Contractor shall be restored at the Contractor’s expense to the same condition they were in at the commencement of work. Stream channels, springs and other wet areas will be avoided by vehicles and heavy equipment.
There are no seasonal weather restrictions unless heavy rains occur or during periods of snow melt which may result in an intermittent work schedule due to muddy conditions. Work shall not occur if project implementation is creating excessive rutting. Roads will be considered impassible when saturated, or when there are deep snow drifts, or during periods of heavy snowfall and access into the project area may be closed by the government during this time. If the Contractor chooses to use a County Road to access the worksite during inclement weather, the Contractor shall establish a maintenance agreement with the County Road Department.
Vehicles and other equipment used for implementation of the project shall be washed to remove any vegetation and potential noxious weed and invasive species parts prior to beginning the work and following completion of the work.
Due to timing restrictions for sensitive resources, treatments will not occur between March 1st and July 1st. These timing restrictions shall be built into the proposal. No extensions to the performance period will be granted due to these timing restrictions. The contractor shall include these dates when submitting a bid.
D. Work Camp
Camping will be allowed during project implementation only at sites approved by BLM in advance. All fire regulations and permits shall be followed. All garbage and refuse shall be removed from the camp site by the contractor within fifteen days of camp abandonment. Final payment will be reserved subject to inspection of these sites by BLM and approval of site cleanup.
E.
Pre-Work Conference
A pre-work conference will be held prior to the start of work, and within seven days of Contract award. The Contractor will be notified in advance of the meeting location, date and time. The purpose of the meeting will be to review the required work, the project location, project specifications, the work schedule, payroll and payments and administrative provisions of the Contract. The Contractor and the persons responsible for coordination of the work shall be present at the meeting. The Contractor shall be prepared to summarize and explain procedures planned for the project.
F.
Progress Meetings Meetings may be called by either the Contracting Officer or the Contractor. Meetings shall be held at the project site, or as determined by the Contracting Officer.
G.
Final Inspection
Final inspection for the project area shall be held at the project site or as otherwise mutually agreed by the Government and the Contractor. The Contractor shall notify the Government representative at least two (2) working days before the completion date, so the Government can schedule a final inspection. Final payment of the contract will be held pending the completion of a satisfactory final inspection of all associated areas.
H.
Measurement of Payment
Work will be measured and paid for by the number of acres within each treatment unit as that unit is completed. The total will be rounded up to the nearest whole acre. Once a treatment unit is complete the acreage completed may be billed for. Area measurements required under this Contract will be measured on a horizontal plane.
Prices and payment will be full compensation for the work described in this section. Payment will be made under the following:
| Pay Item |
| Pay Unit |
| Lop and Scatter |
| Acre |
The Contracting Officer or representative will make periodic inspections as a basis for progress payments and recommendations for adjustments in work quality. The Contractor or representative is encouraged to observe inspections at the time they are being made. Work performed according to the specifications will be considered acceptable for payment purposes.
I. Equipment Maintenance and Repairs
The Contractor is responsible for all maintenance and repairs of Contractor furnished equipment. The Contractor shall complete sufficient maintenance of the equipment to prevent down-time on the project sites. The Contractor is responsible for all maintenance measures to ensure proper functionality and for safety precautions.
Any fuels or oils stored on site must be stored in an approved container with an approved spill guard with berms.
J. Salvageable Items
Unsalvageable materials shall be removed from the work site by the Contractor.
K.
Performance Schedule
Period of performance for this work shall begin as soon as possible following the award of the contract, not to exceed 15 days. The end of the performance period will be one calendar year from contract award. The Contractor shall be required to start and complete the treatment area within the performance time identified above or as otherwise negotiated during the pre-work conference, provided weather conditions permit. If inclement weather conditions should occur prior to the Contractor completing the project, the Contractor shall be issued a stop work order and the project shall be completed as soon as weather conditions permit.
Due to timing restrictions for sensitive resources, treatments will not occur between March 1st and July 1st.
Egan Basin 2024 Lop and Scatter Performance Work Statement
File details come from the government source that posted it. Updated .