A04_SOW.doc

DOC document 3 MB Posted

Attached to
DUCK CREEK MASTICATION Federal contract opportunity
Solicitation number
140L3921R0016
Issued by
Department of the Interior Bureau of Land Management Nevada Region

About this file

This performance work statement outlines requirements for a mastication services contract with the Bureau of Land Management in Nevada. The contractor will be responsible for masticating up to 849 acres of pinyon pine and juniper across eight treatment units in Duck Creek Basin to improve vegetation health, reduce wildfire fuel loads, and enhance wildlife habitat. The contract involves removing all trees using one of two specified mastication methods, cleaning up work areas, and preventing environmental damage. Equipment, personnel, and performance period requirements are defined. The related solicitation was issued by the BLM Nevada Region for this Duck Creek Mastication project under number 140L3921R0016.

View the file

Other files for this federal contract opportunity

Other files attached to DUCK CREEK MASTICATION, newest first.
File Type Posted
SCA_Wage_Determination.pdf PDF
Bid_Schedule.docx DOCX document
Map_1.pdf PDF
Sol_140L3921R0016.pdf PDF
Map_3.pdf PDF
Map_2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

Duck Creek Basin 2021 Mastication I. General Information and Requirements

A. Description of Work The contractor is responsible for furnishing all labor, equipment, supervision, transportation, supplies and materials to masticate pinyon pine and juniper from 667 acres (Units 1-4). There may be up to an additional 182 acres (Units 5 - 8) indicated as an option items that would be awarded subject to available funding (see attached maps). The service requested is the mastication or grinding of whole tree biomass. Method 1 will treat all pinyon pine and juniper (regardless of size) by removing them while leaving and not damaging any other species including mountain mahogany and service berry. Method 2 will leave pinyon and juniper trees with a spacing of 45ft X 45ft and leave all other species. The purpose of the project is to improve the overall health of targeted vegetation communities, reduce fuel loading, reduce threat from wildland fire to structures and infrastructure and improve wildlife habitat and other watershed values.

A minimum of 667 acres and potential maximum of 849 acres of mastication will be conducted under this contract (see Table 1). Contractors are to submit a bid for each unit in accordance with Table 1. Bids are to be submitted on a cost per acre basis.

Table 1 – Table of treatment units by line item, treatment and size.

Line Item
Unit Number
Treatment Method
Total Acres
010
Unit 1
Mastication Method 1
108
020
Unit 2
Mastication Method 1
184
030
Unit 3
Mastication Method 1
219
040
Unit 4
Mastication Method 1
156
050
Unit 5 - Option
Mastication Method 1
55
060
Unit 6 - Option
Mastication Method 2
53
070
Unit 7 - Option
Mastication Method 2
41
080
Unit 8 - Option
Mastication Method 2
33

Leave areas and boundaries may be altered prior to implementation of the project to mitigate sensitive resource concerns. Treatment area boundaries will be outlined on a map provided by the Government. The Contractor will be responsible for ensuring that they are within treatment boundaries by utilizing a Global Positioning System (GPS) unit. The contractor may flag the boundaries of the unit at their discretion however, the contractor would be responsible for the removal of all flagging. Leave areas and boundaries may be altered prior to implementation of the project to mitigate sensitive resource concerns.

B. Work Layout

The Government will provide a map to the Contractor with the treatment area boundaries (outside perimeter, islands, etc.) necessary for the work executed under the Contract. The Government will provide a shapefile (for upload on GPS unit) of the project area boundary to the Contractor. A map with avoidance areas (archaeological sites; springs; structural range improvements; survey markers such as sections corners, quarter corners, mining claims, etc.) will be provided to the contractor. Survey markers disturbed or removed during operations shall be reset at the Contractor’s expense. Range improvements or other physical structures damaged or removed during operations shall be repaired or replaced at the Contractor’s expense.

C. Location and Access to Work Sites Work under this Contract is located in White Pine County, State of Nevada. The project area is located in Duck Creek Basin along the west side of the Schell Creek Mountain Range (refer to attached Map). The area is typical Great Basin sagebrush communities with pinyon, juniper and mountain mahogany.

Access to the treatment area is along the Duck Creek Basin Highway State Route 486 which is a paved road that can be accessed from Highway 93 approximately 15 miles north of Ely. From this road there are a few improved and unimproved roads that intersect the treatment units. The treatment units are bordered on the western edge by private lands. Contractors wishing to cross private lands to access the treatment units will be responsible for securing permission.

Although the roads are in good condition and the terrain within the project areas is gentle, four-wheel drive vehicles are recommended due to the potential for unexpected inclement weather conditions.

There are no seasonal weather restrictions unless heavy rains occur or during periods of snow melt which may result in an intermittent work schedule due to muddy conditions. Work shall not occur if project implementation is creating excessive rutting. Roads will be considered impassable when saturated and access into the project area may be closed by the government during this time.

The following legal land descriptions apply:

· Township 19 North; Range 65 East; Sections 28, 32 and 33; MDM.

· Township 18 North; Range 65 East; Sections 4, 5, 8, 9 and 16; MDM.

· Township 17 North; Range 65 East; Sections 5; MDM.

D. Environmental Considerations

Due to timing restrictions for sensitive resources, treatments will not occur during the listed dates in Table 2. These timing restrictions shall be built into the proposal. No extensions to the performance period will be granted due to these timing restrictions. Waivers may be granted from July 16th through September 16th and November 1st through February 28th pending further agency consultation, but the contractor shall not include these dates when submitting a bid.

Table 2 - Seasonal Restrictions

Unit
Seasonal Restriction
Unit 1, 2, 6-8
11/1-9/15
Unit 3-5
3/1-9/15

The project site shall be cleaned up, and all refuse removed to an approved landfill at the Contractor’s expense. The Contractor shall not disturb lands adjacent to the project site. Existing access roads and trails within the project area that are damaged by the Contractor shall be restored at the Contractor’s expense to the same condition they were in at the commencement of work. Stream channels, springs and other wet areas will be avoided by vehicles and heavy equipment.

Vehicles and other equipment used for implementation of the project shall be washed to remove any vegetation and potential noxious weed and invasive species parts prior to beginning the work and following completion of the work.

E. Work Camp

Camping will be allowed during project implementation only at sites approved by BLM in advance. All fire regulations and permits shall be followed. All garbage and refuse shall be removed from the camp site by the contractor within seven days of camp abandonment. Final payment will be reserved subject to inspection of these sites by BLM and approval of site cleanup.

II. PROJECT MEETINGS

A. Pre-Work Conference A pre-work conference will be held prior to the start of work, and within seven days of Contract award. The Contractor will be notified in advance of the meeting location, date and time. The purpose of the meeting will be to review the required work, the project location, project specifications, the work schedule, payroll and payments and administrative provisions of the Contract. The Contractor and the persons responsible for coordination of the work shall be present at the meeting. The Contractor shall be prepared to summarize and explain procedures planned for the project.

B. Progress Meetings

Meetings may be called by either the Contracting Officer or the Contractor. Meetings shall be held at the project site, or as determined by the Contracting Officer.

C. Final Inspection

The meeting shall be held at the project site, or as determined by the Contracting Officer. The Contractor shall notify the Contracting Officer at least two (2) working days before the completion date, so the Government can schedule a final inspection. Final payment of the contract will be held pending the completion of a satisfactory final inspection of all associated areas.

III. Government Furnished and contractor furnished Property

A. Materials Furnished by the Government

The Government will provide a map with the project area boundaries, and a shapefile of the project area boundaries (for GPS upload). Maps provided within this statement of work represent a general depiction of the work area boundaries may change prior to the initiation of work. Tree densities, terrain and geographic area will be similar to those depicted within the units on the attached maps.

B. Equipment Furnished by the Contractor

The contractor will at a minimum provide one functioning GPS unit capable of downloading shapefiles and displaying them in a manner that can be followed by the contractor’s personnel. It is expected that the individual assigned by the contractor who is responsible for using the GPS unit to follow and/or mark project area boundaries will be able to operate and trouble shoot the GPS unit.

The contractor equipment shall:

· Be a wheeled or tracked mounted vehicle equipped with either hydraulic or PTO driven cutter head with a minimum head lift height of 12.5’ to alter the vegetation type in accordance with the specified level of work, prescription, or as otherwise as described under specifications.

· Preference will be given to tracked machines (due to slope and leave vegetation) with grinding heads attached to a boom that enable the operator to reach over leave vegetation and vertically grind the trees to be removed. If other machines are proposed clearly address how the objectives will be met.

· Be of durable design and construction to withstand the stresses of natural obstructions within pinyon-juniper woodlands such as rocks, stumps, dust, and the general unevenness of the land.

· Be free of fluid leaks and have hoses in good operating condition.

· Be equipped with a head capable of performing the work described in this document.

· Be of a quality that guarantees the contractor’s safety.

· Meet or exceed the requirements listed in Fire Prevention/Suppression Section.

· The contractor’s GPS (as required) shall be capable of uploading ArcGIS shapefiles.

· Contractor shall insure that all equipment moved on to BLM administered land under this contract is free of soil, seeds, vegetative matter or other debris that could contain or hold weeds and weed seeds. For purposes of this provision, equipment shall be considered free of soil, seeds, and other such debris when a visual inspection does not disclose such material. Disassembly of equipment components or specialized inspection tools will not be required. A current list of noxious weeds of concern to the BLM is available at the Ely Field Office for this contract. Known noxious weed areas near the project will be discussed with the successful contractor during the pre-work conference. Areas with known noxious weeds should be avoided if possible. Contractor and CO shall agree on methods of cleaning, locations for the cleaning, and control of off-site impacts, if any. New infestations of noxious weeds of concern to the BLM, identified by either Contractor or the BLM, on BLM land in the Project Area or on the route to the Project Area shall be promptly reported to the other party.

C. Fire Prevention/Suppression

The contractor shall:

a) Equip all diesel and/or gasoline operated engines with spark arresters.

b) Equip all machines with one shovel, and one 12 pound (minimum) “ABC” fire extinguisher.

c) Remove all concentrations of wood dust and debris from equipment daily.

IV. Measurement and Payment A. Measurement of Payment

Work will be measured and paid for by the number of acres within each treatment unit (see Table 1) as that unit is completed. The total will be rounded up to the nearest whole acre. Once a treatment unit is complete the acreage completed may be billed for. Area measurements required under this Contract will be measured on a horizontal plane and recorded with a GPS unit.

B. Basis of Payment

Prices and payment will be full compensation for the work described in this section. Payment will be made under the following:

Pay Item
Pay Unit
Mastication
Acre

The Contracting Officer or representative will make periodic inspections as a basis for progress payments and recommendations for adjustments in work quality. The Contractor or representative is encouraged to observe inspections at the time they are being made. Work performed according to the specifications will be considered acceptable for payment purposes.

V. Specifications

A. Method 1 Remove all pinyon and juniper trees within the designated boundaries. All other tree species and shrubs will not be removed or damaged.

· The by-product of mastication will be a mulch layer less than 6 inches deep, and slash shall be ground or cut, such that 90 percent of woody pieces less than 12 inches in diameter is greater than 3 feet in length. Large boles and branches that exceed 12 inches in diameter may be longer than 3 feet such that they are completely severed from the ground and smaller branches are removed.

· Sever and/or masticate all trees within the project area as identified on the map. All stumps shall be cut so they are no greater than 6 inches in height on the uphill side above mineral soil. If obstacles are encountered, such as rocks, the mastication attachment may be raised to clear the obstacle.

· Work shall not occur if project implementation is creating excessive rutting when the ground is saturated. Work may resume only when the area has sufficiently dried out.

· Any/all skid trails or two-track roads or any other disturbance created by equipment or vehicles maneuvering the project area will be reclaimed as a part of the site cleanup requirements.

· Project must be completed and any necessary rehabilitation must be completed within one calendar year of award.

· Crossing perennial, intermittent, or ephemeral drainage features would be avoided unless deemed absolutely necessary. If it is deemed necessary to cross these features, crossing of drainage features with flowing water would be coordinated with the BLM. Crossing of dry drainage features would be conducted as close to 90 degrees to the long axis of the feature as possible and would minimize disturbance. Damage to drainage features may require repair at the contractors expense to restore natural water flow.

· Contractor shall furnish two warning signs to be placed on the roadside prior to entrance to the work area. Signs shall be a minimum of 3 feet by 3 feet in dimension and shall warn of possibility of flying debris.

· Contractor shall ensure placing fuel containment barrier if storing fuel on project site.

· All units have young trees (less than 2 feet in height) growing. All of these trees must be removed. A requirement of no more than one live stem per acre remaining after treatment will be adhered to. If inspections indicate the quality of the work does not meet this standard the unit will be reworked. Standard will be randomly sampled during inspections by the government representative and communicated to the contractor point of contact. The sampled areas may involve portions of a unit and not the entire unit and will be at the discretion of the government representative. The contractor may elect to utilize chainsaws to remove trees that are less than 6’ in height or to clear stumps of remaining branches. If a unit is to be reworked, depending upon the number and size of live stems remaining the government representative may request that the area be reworked with the use of chainsaws to minimize soil disturbance.

B. Method 2

Treatments conducted under method 2 would incorporate all of the specifications from method 1 with the exception of leave trees. Under method 2 large healthy pinyon and juniper would be left with an average spacing of 45 ft X 45 ft. Trees that are left should be large trees that are free from disease and damage. Preference will be given to leaving pinyon trees if there is an option. All other tree species and shrubs will not be removed or damaged.

C. Treatment Acreage and Areas

Up to 849 acres of public lands would be treated within the project area delineated on the attached map. Work under this Contract is located in White Pine County, State of Nevada. The project area is located in Duck Creek Basin along the west side of the Schell Creek Mountain Range (refer to attached Map).

The attached map delineates the project area boundary with tentative islands and leave areas. Leave areas and boundaries may be altered prior to implementation of the project to mitigate sensitive resource concerns.

Within the treatment units the density of mountain mahogany and other target and leave species varies greatly. It is the responsibility of the contractor to properly evaluate these tree densities in order to avoid damage to them during treatment.

Slope within the treatment units is generally rolling ridges with some several slopes exceeding 20% with some rocks. It is the responsibility of the contractor to properly evaluate these units in order to ensure the equipment is capable of completing the described work.

D. Loading, Unloading and Transporting Property

Overland travel may be authorized by the BLM outside of the treatment units to transport equipment and machines between units. The contractor must coordinate with the BLM prior to traveling outside of the treatment units.

E. Equipment Maintenance and Repairs

The Contractor is responsible for all maintenance and repairs of Contractor furnished equipment. The Contractor shall complete sufficient maintenance of the equipment to prevent down-time on the project sites. The Contractor is responsible for all maintenance measures to ensure proper functionality and for safety precautions.

Any fuels or oils stored on site must be stored in an approved container with an approved spill guard with berms.

F. Performance Schedule

Period of performance for this work shall begin as soon as possible following the initial award of the contract, not to exceed 30 days, within the appropriate treatment timeframes (see Table 2). The end of the performance period will be one calendar year from the date of the award.

The Contractor shall be required to start and complete the treatment area within the performance time identified above or as otherwise negotiated during the pre-work conference, provided weather conditions permit. If inclement weather conditions should occur prior to the Contractor completing the project, the Contractor shall be issued a stop work order and the project shall be completed as soon as weather conditions permit.

Duck Creek Basin, 2021, Mastication Statement of Work