Statement of Work Arrowwood NWR Bypass Channel Road Graveling

Deliver and apply 2,913 tons of Class 5 gravel to 2.3 miles of the Jim Lake reach of the bypass channel road. Gravel will be spread with belly dumps 3 inches deep, by 14 foot wide, for a length of 12,145 feet. Delivery will require drive through access/departure via 14th St. SE/15th St. SE and 17th St. SE.

Finish grading will be completed by Fish and Wildlife Service personnel and is excluded from this statement of work.