This document is a Statement of Work (SOW) and specifications for a federal contract opportunity to install a roof over an existing cabin and install a vault for a dry basin within the cabin. The work consists of two primary objectives: 1) installing a roof over the existing roof of the Sarvis Cabin, including excavating and installing foundations, demolishing existing framing, providing and installing new framing, roof over-framing, insulation, and roofing materials, and rerouting existing roof penetrations; and 2) installing a vault for a dry basin within the cabin, including connecting it to the existing drain line, providing an alarm system, and installing the dry basin within the existing counter. The contract opportunity is solicitation number 140L1724Q0035, issued by the Department of the Interior Bureau of Land Management Colorado Region. The work is to be performed at the Sarvis Cabin site outside of Steamboat Springs, Colorado.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Colorado BLM – State Office

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 PROJECT INFORMATION

A. Project Identification:

1. Project Location: Sarvis Cabin outside of Steamboat Springs, CO (40.30004294297945° N, 106.804976440660° W)

B. The Work consists of two primary objectives as detailed in the following specifications and drawings.

1. Installing a roof over the existing roof of the Sarvis Cabin

a. Excavating and installing foundations for interior structural supports

b. Demo existing framing and supports as needed and identified on the drawings.

c. Providing and Installing framing for structural supports within the cabin

d. Providing and Installing framing for roof supports within cabin

e. Providing and Installing roof over-framing joists and insulation

f. Providing and Installing exterior roofing material including roofing and underlayments.

g. Rerouting, providing new materials for, and installing existing roof penetrations through the new roof.

2. Installing a vault for a dry basin within the Sarvis Cabin

a. Providing and installing a vault for a dry basin

b. Connecting the proposed vault to the existing drain line beneath the existing patio slab.

c. Providing and installing all necessary exterior piping and connections and cleanouts

d. Providing and installing an alarm system to notify users the vault is full.

e. Providing and installing a dry basin and all connections to the existing drain line within the existing counter top in the cabin interior.

1.2 WORK RESTRICTIONS

A. Contractor's Use of Premises: During construction, Contractor will have full use of site within gated area of Sarvis Cabin. Contractor's use of premises is limited only by Government's right to perform work or employ other contractors on portions of Project and as follows:

1. Perform construction only during normal working hours 7 AM to 6:30 PM Monday thru Friday, other than Federal holidays), unless otherwise agreed to in advance by Government. Clean up work areas and return to usable condition at the end of each work period.

2. Limits: Limit site disturbance, including earthwork and clearing of vegetation, to 40 feet beyond building perimeter; Stage construction material on existing parking area as possible. Coordinate with government if more staging area or disturbance area is necessary. Do not disturb bank of Yampa River.

SUMMARY 011000 - 2

3. Driveways, Walkways, and Entrances: Keep access road serving premises clear and available to Government, Government's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials.

B. Trail at edge of bank of Yampa River will remain open for recreational use. Take care to keep trail open and maintain good relationship with members of the Public.

C. Vault toilet will remain open and will be used by members of the public throughout the duration of the project. Contractor may use vault toilet in lieu of providing a portable toilet. Maintain safe access to toilet off of river trail.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 011000

PRICE AND PAYMENT PROCEDURES 012000 - 1

SECTION 012000 - PRICE AND PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 UNIT PRICES

A. Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.

B. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.

C. Measurement and Payment: See individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

1.2 PAYMENT PROCEDURES

A. Follow FAR and Government guidance for invoice submittal within IPP and payment.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF UNIT PRICES

A. Mobilization

B. Demolition – Section 024119

Over-roofing and Framing of existing Cabin

C. Excavation and Earthwork for cabin foundations Section 312000 – “Earth Moving” and drawings.

D. Foundations, reinforced, installed, including excavation, structural fill, compaction, and anchors

– 1 Lump Sum - Section 033000 “Cast in Place Concrete”

E. Steel and Timber roof framing supports within cabin, installed – 1 Lump Sum – Section 061000 “Rough Carpentry” and Section 051200 “Structural Steel Framing” and Drawings

PRICE AND PAYMENT PROCEDURES 012000 - 2

F. Roof Overframing (over existing cabin), including SIP panels and OSB overlayment and extension of existing fireplace chimney and replacement of gas-fired heating chimney – 1 Lump Sum – Section 061000 “Rough Carpentry” and Section IIIIII “INSULATION” and 235100 – “Breechings, Chimneys, and Stacks” and Drawings

G. Roofing including underlayments, installed – 1 Lump Sum - Section 076100 – “Sheet Metal Roofing” and 076100.1 - “CXT – ColorChart” and Drawings.

Exterior Dormer

H. Foundations, reinforced, installed, including excavation, structural fill, compaction, and anchors

– 1 Lump Sum - Section 033000 “Cast in Place Concrete” and Section 312000 “Earth Moving”

I. Framing and finish work (posts, beams, floor, trusses, joists, and all hardware and accessories, and access stair), installed – 1 Lump Sum – Section 061000 “Rough Carpentry” and Section 062000 – “Finish Carpentry” and Section 051200 “Structural Steel Framing” and Section

083514.1 “Pull-Down Attic Ladder” and Drawings

J. Roofing including underlayments, installed – 1 Lump Sum - Section 076100 – “Sheet Metal Roofing” and 076100.1 - “CXT – ColorChart” and Drawings.

Vault

K. Excavation and Earthwork – 1 Lump Sum - Section 312000 – “Earth Moving”

L. Furnish and Install vault, 1000 gallons – 1 Lump Sum - Section 312000 – “Earth Moving” and Section 221313 “Facility Sanitary Sewers” and Section 221316 “Sanitary Waste and Vent Piping” and Section 221319 “Sanitary Waste and Vent Piping Specialties” and Section 221353 “Facility Septic Tanks” and manufacturer’s installation instructions and drawings.

M. Furnish and Install vault level sensor and alarm – Section 221353 “Facility Septic Tanks” Manufacturer’s installation instructions and drawings.

N. Furnish and Install drain and vent line within and out of roof in cabin – 1 Lump Sum - Section 312000 – “Earth Moving” and Section 221316 “Sanitary Waste and Vent Piping” and manufacturer’s installation instructions and drawings.

O. Furnish and Install sink basin (dry-basin) in existing counter – 1 Lump Sum – Section 224000 “Plumbing Fixtures” and Manufacturer’s installation instructions.

P. Furnish and install trail surface - 1 Lump Sum - Section 312000 – “Earth Moving” and manufacturer’s installation instructions

END OF SECTION 012000

ADMINISTRATIVE REQUIREMENTS 013000 - 1

SECTION 013000 - ADMINISTRATIVE REQUIREMENTS

PART 1 - GENERAL

1.1 PROJECT MANAGEMENT AND COORDINATION

A. Subcontract List: Submit a written summary identifying individuals or firms proposed for each portion of the Work

B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. List e-mail addresses and telephone numbers.

C. Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work.

D. Requests for Information (RFIs): On discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI via email to the Government CO or COR

E. Schedule and conduct progress meetings at Project site at regular intervals. Government and Contractor to determine appropriate interval at Project kick-off meeting. Notify Government of meeting dates and times. Require attendance of each subcontractor or other entity concerned with current progress or involved in planning, coordination, or performance of future activities.

F. Product Submittals.

1. Submit electronically when able for all product submittals required in job

2. If only paper is available, scan or take a clear photo of paper and send it to project CO or

COR.

G. Identify options requiring selection by Government and record Government selection.

H. Identify deviations from the Contract Documents on submittals.

I. Contractor's Construction Schedule Submittal Procedure:

1. Submit required submittals in one of the following format:

a. Utilize Government Microsoft Teams project schedule. Government will provide entry to a Microsoft Teams web team and a schedule to fill out.

b. PDF electronic file in the event contractor is using another software package.

2. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.

a. Submit a working electronic copy of schedule, using software indicated, and labeled to comply with requirements for submittals. Include type of schedule (initial or updated) and date on label.

ADMINISTRATIVE REQUIREMENTS 013000 - 2

3. Coordinate Contractor's construction schedule with the schedule of values, list of subcontracts, submittal schedule, progress reports, payment requests, and other required schedules and reports.

PART 2 - PRODUCTS

2.1 SUBMITTAL PROCEDURES

A. General Submittal Procedure Requirements: Prepare and submit submittals required by individual Specification Sections.

1. Post electronic submittals as PDF electronic files directly to Government provided Microsoft Teams site.

2.2 ACTION SUBMITTALS

A. Submit electronically

B. Product Data: Mark each copy to show applicable products and options. Include the following:

1. Manufacturer's written recommendations, product specifications, and installation instructions.

2. Wiring diagrams showing factory-installed wiring.

3. Printed performance curves and operational range diagrams.

4. Testing by recognized testing agency.

5. Compliance with specified standards and requirements.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data. Submit electronically. Include the following:

1. Dimensions and identification of products.

2. Fabrication and installation drawings and roughing-in and setting diagrams.

3. Wiring diagrams showing field-installed wiring.

4. Notation of coordination requirements.

5. Notation of dimensions established by field measurement.

D. Samples: Submit Samples for review of kind, color, pattern, and texture and for a comparison of these characteristics between submittal and actual component as delivered and installed. Include name of manufacturer and product name on label.

2.3 INFORMATIONAL SUBMITTALS

A. Informational Submittals: Submit electronically.

B. Qualification Data: Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified.

ADMINISTRATIVE REQUIREMENTS 013000 - 3

C. Product Certificates: Prepare written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

2.4 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Gantt-Chart Schedule: Submit a comprehensive, fully developed, horizontal Gantt-chart-type schedule within 30 days of date established for the Notice to Proceed. Alternatively, use the schedule in the Government Microsoft Teams website.

B. Preparation: Indicate each significant construction activity separately. Identify first workday of each week with a continuous vertical line.

PART 3 - EXECUTION

3.1 SUBMITTAL REVIEW

A. Review each submittal and check for coordination with other Work of the Contract and for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Architect.

B. Government will review each action submittal, make marks to indicate corrections or modifications required, will stamp each submittal with an action stamp, and will mark stamp appropriately to indicate action.

C. Informational Submittals: Government will review each submittal and will not return it, or will return it if it does not comply with requirements.

D. Submittals not required by the Contract Documents may not be reviewed and may be discarded.

3.2 CONTRACTOR'S CONSTRUCTION SCHEDULE

A. Updating: At monthly intervals, update schedule to reflect actual construction progress and activities. Review and update schedule at each regularly scheduled progress meeting.

1. Deliver updated copies of schedule to Government.

END OF SECTION 013000

QUALITY REQUIREMENTS 014000 - 1

SECTION 014000 - QUALITY REQUIREMENTS

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Testing and inspecting services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements.

B. Referenced Standards: If compliance with two or more standards is specified and the standards establish different or conflicting requirements, comply with the most stringent requirement. Refer uncertainties to Government for a decision.

C. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum. The actual installation may exceed the minimum within reasonable limits.

Indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to Architect for a decision.

D. Test and Inspection Reports: Prepare and submit certified written reports specified in other Sections. Include the following:

1. Date of issue.

2. Project title and number.

3. Name, address, and telephone number of testing agency.

4. Dates and locations of samples and tests or inspections.

5. Names of individuals making tests and inspections.

6. Description of the Work and test and inspection method.

7. Identification of product and Specification Section.

8. Complete test or inspection data.

9. Test and inspection results and an interpretation of test results.

10. Record of temperature and weather conditions at time of sample taking and testing and inspecting.

11. Comments or professional opinion on whether tested or inspected Work complies with the

Contract Document requirements.

12. Name and signature of laboratory inspector.

13. Recommendations on retesting and reinspecting.

E. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that replaced Work that failed to comply with the Contract Documents.

F. Testing Agency Responsibilities: Cooperate with Government and Contractor in performance of duties. Provide qualified personnel to perform required tests and inspections.

1. Notify Government and Contractor of irregularities or deficiencies in the Work observed during performance of its services.

QUALITY REQUIREMENTS 014000 - 2

2. Do not release, revoke, alter, or increase requirements of the Contract Documents or approve or accept any portion of the Work.

3. Do not perform any duties of Contractor.

G. Associated Services: Cooperate with testing agencies and provide reasonable auxiliary services as requested. Provide the following:

1. Access to the Work.

2. Incidental labor and facilities necessary to facilitate tests and inspections.

3. Adequate quantities of representative samples of materials that require testing and inspecting. Assist agency in obtaining samples.

4. Facilities for storage and field curing of test samples.

5. Security and protection for samples and for testing and inspecting equipment.

H. Coordination: Coordinate sequence of activities to accommodate required quality-assurance and -control services with a minimum of delay and to avoid necessity of removing and replacing construction to accommodate testing and inspecting.

1. Schedule times for tests, inspections, obtaining samples, and similar activities.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 REPAIR AND PROTECTION

A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.

B. Repair and protection are Contractor's responsibility, regardless of the assignment of responsibility for quality-control services.

END OF SECTION 014000

REFERENCES 014200 - 1

SECTION 014200 - REFERENCES

PART 1 - GENERAL

1.1 GENERAL REQUIREMENTS

A. Publication Dates: Comply with standards in effect as of date of the Contract Documents unless otherwise indicated.

B. Abbreviations and Acronyms: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

1. AAMA - American Architectural Manufacturers Association; www.aamanet.org.

2. AASHTO - American Association of State Highway and Transportation Officials;

www.transportation.org.

3. AATCC - American Association of Textile Chemists and Colorists; www.aatcc.org.

4. ACI - American Concrete Institute; (Formerly: ACI International); www.concrete.org.

5. AF&PA - American Forest & Paper Association; www.afandpa.org.

6. AGA - American Gas Association; www.aga.org.

7. AHAM - Association of Home Appliance Manufacturers; www.aham.org.

8. AHRI - Air-Conditioning, Heating, and Refrigeration Institute (The); www.ahrinet.org.

9. AIA - American Institute of Architects (The); www.aia.org.

10. AISC - American Institute of Steel Construction; www.aisc.org.

11. AISI - American Iron and Steel Institute; www.steel.org.

12. AITC - American Institute of Timber Construction; www.aitc-glulam.org.

13. AMCA - Air Movement and Control Association International, Inc.; www.amca.org.

14. ANSI - American National Standards Institute; www.ansi.org.

15. APA - APA - The Engineered Wood Association; www.apawood.org.

16. APA - Architectural Precast Association; www.archprecast.org.

17. API - American Petroleum Institute; www.api.org.

18. ARI - Air-Conditioning & Refrigeration Institute; (See AHRI).

19. ARI - American Refrigeration Institute; (See AHRI).

20. ARMA - Asphalt Roofing Manufacturers Association; www.asphaltroofing.org.

21. ASCE - American Society of Civil Engineers; www.asce.org.

22. ASCE/SEI - American Society of Civil Engineers/Structural Engineering Institute; (See

ASCE).

23. ASHRAE - American Society of Heating, Refrigerating and Air-Conditioning Engineers;

www.ashrae.org.

24. ASME - ASME International; (American Society of Mechanical Engineers);

www.asme.org.

25. ASSE - American Society of Safety Engineers (The); www.asse.org.

26. ASSE - American Society of Sanitary Engineering; www.asse-plumbing.org.

27. ASTM - ASTM International; (American Society for Testing and Materials International);

www.astm.org.

28. AWI - Architectural Woodwork Institute; www.awinet.org.

29. AWMAC - Architectural Woodwork Manufacturers Association of Canada;

www.awmac.com.

REFERENCES 014200 - 2

30. AWPA - American Wood Protection Association; (Formerly: American Wood-Preservers' Association); www.awpa.com.

31. AWS - American Welding Society; www.aws.org.

32. AWWA - American Water Works Association; www.awwa.org.

33. BHMA - Builders Hardware Manufacturers Association; www.buildershardware.com.

34. BICSI - BICSI, Inc.; www.bicsi.org.

35. BISSC - Baking Industry Sanitation Standards Committee; www.bissc.org.

36. CFFA - Chemical Fabrics & Film Association, Inc.; www.chemicalfabricsandfilm.com.

37. CFSEI - Cold-Formed Steel Engineers Institute; www.cfsei.org.

38. CGA - Compressed Gas Association; www.cganet.com.

39. CIMA - Cellulose Insulation Manufacturers Association; www.cellulose.org.

40. CISCA - Ceilings & Interior Systems Construction Association; www.cisca.org.

41. CISPI - Cast Iron Soil Pipe Institute; www.cispi.org.

42. CLFMI - Chain Link Fence Manufacturers Institute; www.chainlinkinfo.org.

43. CPA - Composite Panel Association; www.pbmdf.com.

44. CRRC - Cool Roof Rating Council; www.coolroofs.org.

45. CRSI - Concrete Reinforcing Steel Institute; www.crsi.org.

46. CSA - CSA International; (Formerly: IAS - International Approval Services); www.csa-international.org.

47. CSI - Construction Specifications Institute (The); www.csinet.org.

48. CWC - Composite Wood Council; (See CPA).

49. DASMA - Door and Access Systems Manufacturers Association; www.dasma.com.

50. DHI - Door and Hardware Institute; www.dhi.org.

51. ECA - Electronic Components Association; (See ECIA).

52. ECAMA - Electronic Components Assemblies & Materials Association; (See ECIA).

53. EIA - Electronic Industries Alliance; (See TIA).

54. EJMA - Expansion Joint Manufacturers Association, Inc.; www.ejma.org.

55. ESD - ESD Association; (Electrostatic Discharge Association); www.esda.org.

56. ESTA - Entertainment Services and Technology Association; (See PLASA).

57. EVO - Efficiency Valuation Organization; www.evo-world.org.

58. FM Approvals - FM Approvals LLC; www.fmglobal.com.

59. FM Global - FM Global; (Formerly: FMG - FM Global); www.fmglobal.com.

60. FSA - Fluid Sealing Association; www.fluidsealing.com.

61. FSC - Forest Stewardship Council U.S.; www.fscus.org.

62. GA - Gypsum Association; www.gypsum.org.

63. GANA - Glass Association of North America; www.glasswebsite.com.

64. GS - Green Seal; www.greenseal.org.

65. HMMA - Hollow Metal Manufacturers Association; (See NAAMM).

66. ICBO - International Conference of Building Officials; (See ICC).

67. ICC - International Code Council; www.iccsafe.org.

68. ICEA - Insulated Cable Engineers Association, Inc.; www.icea.net.

69. ICRI - International Concrete Repair Institute, Inc.; www.icri.org.

70. IEEE - Institute of Electrical and Electronics Engineers, Inc. (The); www.ieee.org.

71. IEST - Institute of Environmental Sciences and Technology; www.iest.org.

72. ISO - International Organization for Standardization; www.iso.org.

73. KCMA - Kitchen Cabinet Manufacturers Association; www.kcma.org.

74. LMA - Laminating Materials Association; (See CPA).

75. MFMA - Metal Framing Manufacturers Association, Inc.; www.metalframingmfg.org.

76. MPI - Master Painters Institute; www.paintinfo.com.

77. NAAMM - National Association of Architectural Metal Manufacturers; www.naamm.org.

REFERENCES 014200 - 3

78. NACE - NACE International; (National Association of Corrosion Engineers International);

www.nace.org.

79. NAIMA - North American Insulation Manufacturers Association; www.naima.org.

80. NeLMA - Northeastern Lumber Manufacturers Association; www.nelma.org.

81. NFPA - NFPA; (National Fire Protection Association); www.nfpa.org.

82. NFPA - NFPA International; (See NFPA).

83. NHLA - National Hardwood Lumber Association; www.nhla.com.

84. NLGA - National Lumber Grades Authority; www.nlga.org.

85. NRCA - National Roofing Contractors Association; www.nrca.net.

86. NRMCA - National Ready Mixed Concrete Association; www.nrmca.org.

87. NSF - NSF International; (National Sanitation Foundation International); www.nsf.org.

88. NSPE - National Society of Professional Engineers; www.nspe.org.

89. NSSGA - National Stone, Sand & Gravel Association; www.nssga.org.

90. PCI - Precast/Prestressed Concrete Institute; www.pci.org.

91. PDI - Plumbing & Drainage Institute; www.pdionline.org.

92. RCSC - Research Council on Structural Connections; www.boltcouncil.org.

93. SAE - SAE International; (Society of Automotive Engineers); www.sae.org.

94. SCTE - Society of Cable Telecommunications Engineers; www.scte.org.

95. SEFA - Scientific Equipment and Furniture Association; www.sefalabs.com.

96. SEI/ASCE - Structural Engineering Institute/American Society of Civil Engineers; (See

ASCE).

97. SJI - Steel Joist Institute; www.steeljoist.org.

98. SMA - Screen Manufacturers Association; www.smainfo.org.

99. SMACNA - Sheet Metal and Air Conditioning Contractors' National Association;

www.smacna.org.

100. SPIB - Southern Pine Inspection Bureau; www.spib.org.

101. SPRI - Single Ply Roofing Industry; www.spri.org.

102. SSINA - Specialty Steel Industry of North America; www.ssina.com.

103. SSPC - SSPC: The Society for Protective Coatings; www.sspc.org.

104. TPI - Truss Plate Institute; www.tpinst.org.

105. TPI - Turfgrass Producers International; www.turfgrasssod.org.

106. TRI - Tile Roofing Institute; (Formerly: National Tile Roofing Manufacturing

Association); www.tileroofing.org.

107. UL - Underwriters Laboratories Inc.; www.ul.com.

108. UNI - Uni-Bell PVC Pipe Association; www.uni-bell.org.

109. USGBC - U.S. Green Building Council; www.usgbc.org.

110. WASTEC - Waste Equipment Technology Association; www.wastec.org.

111. WCLIB - West Coast Lumber Inspection Bureau; www.wclib.org.

112. WCMA - Window Covering Manufacturers Association; www.wcmanet.org.

113. WDMA - Window & Door Manufacturers Association; www.wdma.com.

114. WI - Woodwork Institute; (Formerly: WIC - Woodwork Institute of California);

www.wicnet.org.

115. WMMPA - Wood Moulding & Millwork Producers Association; (See MMPA).

116. WSRCA - Western States Roofing Contractors Association; www.wsrca.com.

117. WWPA - Western Wood Products Association; www.wwpa.org.

C. Code Agencies: Where abbreviations and acronyms are used in Specifications or other Contract Documents, they shall mean the recognized name of the entities in the following list. Names, are subject to change and are believed to be accurate and up-to-date as of the date of the Contract Documents.

REFERENCES 014200 - 4

1. IAPMO - International Association of Plumbing and Mechanical Officials;

www.iapmo.org.

2. ICC - International Code Council; www.iccsafe.org.

3. ICC-ES - ICC Evaluation Service, LLC; www.icc-es.org.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 014200

BLM Building Codes and Standards updated 07/19/2023

Federal Law. The Public Buildings Amendments of 1988, 40 U.S.C. 3312 (formerly section 21 of the Public Buildings Act of 1959, 40 U.S.C. 619), require that each building constructed or altered by GSA or any other federal agency shall, to the maximum extent feasible, be in compliance with one of the nationally recognized model building codes and with other applicable nationally recognized codes.

Nationally Recognized Codes. For all design and construction work performed on federal buildings by BLM or those functions under BLM’s construction authority, BLM has adopted the technical requirements of the following nationally recognized codes and standards referred to in this subsection (including any and all accumulative supplements). The technical requirements of these nationally recognized codes and standards will supplement other BLM requirements mandated by Federal Laws and Executive Orders, as well as other BLM criteria noted within this document that has been established to meet our customers’ needs and their unique requirements.

State and Local Codes. BLM recognizes that the national building codes are typically the foundation of state and local building codes. State and local codes also represent important regional interests and conditions. As such, state and local building codes shall also be followed to the maximum extent practicable.

Legally, however, buildings built on federal property are exempt from state and local building codes. Local building permits and approvals are not required as BLM is the Authority Having Jurisdiction (AHJ). Notwithstanding, it is BLM’s policy to comply with state and local building codes to the maximum extent practicable. Should a conflict exist between state and local codes and the BLM adopted nationally recognized codes, the BLM requirement shall prevail. All code conflicts shall be brought to the attention of the BLM NOC A/E Branch for resolution.

The BLM National Operations Center - Branch of Architecture and Engineering is charged with providing A/E technical assistance and direction for the BLM. The BLM NOC A/E branch requires the following nationally recognized codes and standards be incorporated into all BLM projects (where applicable):

National Codes and Standards

• 2021 IBC (International Building Code) o Including IBC Appendix F: Rodent Proofing o NFPA 101 – Life Safety Code – Use when/where IBC is silent

• 2021 IEBC (International Existing Building Code)

• 2021 IFC (International Fire Code)

• 2021 IFGC (International Fuel Gas Code)

• 2021 IMC (International Mechanical Code) o Except use ASHRAE 62.1 - 2022 “Ventilation and Acceptable Indoor Air Quality” instead of Chapter 4 “Ventilation” for commercial projects. Use Chapter 4 of the IMC for residential occupancies.

• 2021 IPC (International Plumbing Code)

• 2021 IRC (International Residential Code)

• 2021 IWUIC (International Wildland-Urban Interface Code) o WUI is defined by USDA’s map of 2010 Wildland-Urban Interface of the Conterminous United States

• 2021 IECC (International Energy Conservation Code) o See ‘Regulations’ section below for Energy Efficiency Standards for the Design and Construction of New Federal Low-Rise Residential Buildings o Including Appendix CB – Solar Ready Zone – Commercial o Including Appendix RB – Solar Ready Provisions – Residential

• ASHRAE 90.1-2019 (Energy Standards for Buildings Except Low-Rise Residential Buildings) o See ‘Regulations’ section below for Energy Efficiency Standards for the Design and Construction of New

Federal Commercial and Multi-Family High-Rise Residential Buildings

• NFPA 13 – Standard for the Installation of Sprinkler Systems (2022 Edition) (for non-residential buildings or non-residential portion of buildings)

• NFPA 13R – Standard for the Installation of Sprinkler Systems in Low-Rise Residential Occupancies (2022 Edition) (for crew quarters or sleeping quarters portion of buildings served by sufficient water supply)

• NFPA 13D - Standard for the Installation of Sprinkler Systems in One- and Two-Family Dwellings and Manufactured Homes (2022 Edition) (for sleeping quarters or sleeping quarters portion of buildings served by insufficient water supply for NFPA 13R system)

• NFPA 70 - National Electrical Code (2020 Edition)

• NFPA 72 - National Fire Alarm and Signaling Code (2022 Edition)

• NFPA 101 – Life Safety Code (2021 Edition) see IBC, above

• NFPA 780 – Standard for the Installation of Lightning Protection Systems (2023 Edition) (Perform Simplified Risk

Assessment per Annex L and follow the recommendation output. Utilize lightning flash density from the web based, high resolution, Viasala Interactive Map.)

• NFPA 1221 - Standard for the Installation, Maintenance, and Use of Emergency Services Communications Systems Chapters 3 – 6 (for dispatch centers)

• ABAAS (Architectural Barriers Act Accessibility Standards)

• ASCE/SEI 7 - Minimum Design Loads and Associated Criteria for Buildings and Other Structures (2022 Edition)

• ASHRAE 55 – 2020 - “Thermal Environmental Conditions for Human Occupancy”

• IEEE Standards

• IESNA Applications Standards Collection

• 2021 International Green Construction Code (IgCC) Section 501.3.6 “Reduction in Light Pollution”

• Interagency Security Committee - Physical Security Criteria for Federal Facilities

Laws

• 40 USC §3312 - Compliance with Nationally Recognized Codes

• 40 USC §3318- Lactation room in public buildings

• 42 USC §6834 (a)(3) (A)(iii) – Federal Building Energy Efficiency Standards (Solar Hot Water Heaters if Lifecyle cost-effective)

• 42 USC §8253 – Energy and Water Management Requirements (Including Federal Building Metering Guidance

November 2014 Update

• 42 USC §8259b(b)(d)(e) – Federal Procurement of Energy Efficient Products

• 42 USC §17094 – Storm Water Runoff Requirements for Federal Development Projects (Predevelopment

Hydrology for federal facilities over 5,000 square feet)

• Energy Policy Act of 2005

• Energy Independence and Security Act of 2007

• Architectural Barriers Act (ABA) of 1968

• Energy Act of 2020

• BABIES act: Public Law 114 - 235 – ‘Bathrooms Accessible in Every Situation Act'

Executive Orders/Federal Policies

• Executive Order 13690 - Establishing a Federal Flood Risk Management Standard and a Process for Further

Soliciting and Considering Stakeholder Input

• Executive Order 13717 - Establishing a Federal Earthquake Risk Management Standard

• Executive Order 13728 - Wildland-Urban Interface Federal Risk Mitigation

• Executive Order 13990 - Climate Crisis; Efforts to Protect Public Health and Environment and Restore Science

• Executive Order 14008 - Tackling the Climate Crisis at Home and Abroad

• Executive Order 14030 – Climate Related Financial Risk

• Executive Order 14035 - Diversity, Equity, Inclusion, and Accessibility (DEIA) in the Federal Workforce

• Executive Order 14057 - Catalyzing Clean Energy Industries and Jobs Through Federal Sustainability

• Guiding Principles for Sustainable Federal Buildings and Associated Instructions (December 2020) https://www.sustainability.gov/pdfs/guiding_principles_for_sustainable_federal_buildings.pdf

Regulations

• 10 CFR Part 433 - Energy Efficiency Standards for the Design and Construction of New Federal Commercial and Multi-Family High-Rise Residential Buildings o For commercial buildings and multi-family high-rise residential buildings, comply with the above Regulation including Comcheck compliance of the proposed building(s), and the energy use reduction performance target of 30% below ASHRAE 90.1-2019 Baseline Building.

• 10 CFR Part 435 – Energy Efficiency Standard for the Design and Construction of New Federal Low-Rise Residential Buildings o For low-rise residential buildings, comply with the above Regulation including Rescheck compliance of the proposed building(s), and the energy use reduction performance target of 30% below 2021 IECC (International Energy Conservation Code) Baseline Building

• 41 CFR Part 102-76 - Subpart C - Architectural Barriers Act

DOI Standards

• DOI Space Management Handbook

• Secretary of the Interior’s Standards for the Treatment of Historic Properties

BLM Standards, Policies, and Internal Memoranda (IM)

• BLM Sustainable Buildings Implementation Plan

• BLM Manual 1535 - Space Management

• BLM Guidelines for a Quality Built Environment

• BLM IM 2021-030 Office Space Authorizations

• BLM IM 2023-020 Future Proofing of Fleet Parking Areas

• BLM IM 2023-021 Gender Non-Binary Restroom

• BLM IM 2023-046 Space Authorizations and Design Standards

• National CAD Standard (NCS/UDS) v6

A detailed code data and analysis must be completed by the A/E contractor during the design phase and documented within the project Construction Document drawings to demonstrate compliance with these codes and standards. At a minimum, the A/E shall document in the drawings:

• IBC Chapter 3 Occupancy classification

• IBC Chapter 4 special detailed requirements based on Occupancy and use

• IBC Chapter 5 building height and area limitations

• IBC Chapter 6 Construction Type and fire resistance rating requirements

• IBC Chapter 7 rated/protected assemblies

• IBC Chapter 8 interior finish classifications

• IBC Chapter 9 sprinkler system types/standards

• IBC Chapter 10 Occupant load calculations and means of egress requirements

• IBC Chapter 11 accessibility requirements

• IBC Chapter 29 plumbing fixture counts

• Energy Code data shall be documented to include required insulation and opening/glazing performance requirements and also means of compliance with same.

• For existing building projects, include IEBC Level of Alteration and Accessibility analysis.

• Additional focused data and analyses shall be provided to demonstrate code/standard compliance with project-specific design intent.

It is important to note that these codes and standards are updated periodically, and the most current version of this document should be referenced when the project is designed, in accordance with agency directives and guidance from the BLM NOC A/E Branch.

https://www.nationalcadstandard.org/ncs6/content.php

PRODUCT REQUIREMENTS 016000 - 1

SECTION 016000 - PRODUCT REQUIREMENTS

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent.

B. Comparable Product Requests: Submit request for consideration of each comparable product.

Identify product or fabrication or installation method to be replaced.

1. Show compliance with requirements for comparable product requests.

2. Government will review the proposed product and notify Contractor of its acceptance or rejection.

C. Basis-of-Design Product Specification Submittal: Show compliance with requirements.

D. Deliver, store, and handle products using means and methods that will prevent damage, deterioration, and loss, including theft. Comply with manufacturer's written instructions.

1. Schedule delivery to minimize long-term storage at Project site and to prevent overcrowding of construction spaces.

2. Deliver products to Project site in manufacturer's original sealed container or packaging, complete with labels and instructions for handling, storing, unpacking, protecting, and installing.

3. Inspect products on delivery to ensure compliance with the Contract Documents and to ensure that products are undamaged and properly protected.

4. Store materials in a manner that will not endanger Project structure.

5. Store products that are subject to damage by the elements, under cover in a weathertight enclosure above ground, with ventilation adequate to prevent condensation.

E. Warranties specified in other Sections shall be in addition to, and run concurrent with, other warranties required by the Contract Documents. Manufacturer's disclaimers and limitations on product warranties do not relieve Contractor of obligations under requirements of the Contract Documents.

PART 2 - PRODUCTS

2.1 PRODUCT SELECTION PROCEDURES

A. Provide products that comply with the Contract Documents, are undamaged, and, unless otherwise indicated, are new at the time of installation.

1. Provide products complete with accessories, trim, finish, and other devices and components needed for a complete installation and the intended use and effect.

2. Where products are accompanied by the term "as selected," Architect will make selection.

PRODUCT REQUIREMENTS 016000 - 2

3. Descriptive, performance, and reference standard requirements in the Specifications establish salient characteristics of products.

B. Where the following headings are used to list products or manufacturers, the Contractor's options for product selection are as follows:

1. Products:

a. Where requirements include "one of the following," provide one of the products listed that complies with requirements.

b. Where requirements do not include "one of the following," provide one of the products listed that complies with requirements or a comparable product.

2. Manufacturers:

a. Where requirements include "one of the following," provide a product that complies with requirements by one of the listed manufacturers.

b. Where requirements do not include "one of the following," provide a product that complies with requirements by one of the listed manufacturers or another manufacturer.

3. Basis-of-Design Product: Provide the product named, or indicated on the Drawings, or a comparable product by one of the listed manufacturers.

C. Provide a product that complies with requirements and matches Government’s sample when specified. Government’s decision will be final on whether a proposed product matches.

2.2 COMPARABLE PRODUCTS

A. Governement will consider Contractor's request for comparable product when the following conditions are satisfied:

1. Evidence that the proposed product does not require revisions to the Contract Documents, that it is consistent with the Contract Documents and will produce the indicated results, and that it is compatible with other portions of the Work.

2. Detailed comparison of significant qualities of proposed product with those named in the Specifications.

3. List of similar installations for completed projects, if requested.

4. Samples, if requested.

END OF SECTION 016000

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419 - 1

SECTION 017419 - CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Waste Management Conference: Conduct conference at Project site to comply with requirements in Section 013000 "Administrative Requirements." Review methods and procedures related to waste management.

PART 2 - PRODUCTS

NOT USED

PART 3 - EXECUTION

3.1 PLAN IMPLEMENTATION

A. General: Implement approved waste management. Provide handling, containers, storage, transportation, and other items as required to implement waste management during the entire duration of the Contract.

B. Training: Train workers, subcontractors, and suppliers on proper waste management procedures, as appropriate for the Work occurring at Project site.

3.2 DISPOSAL OF WASTE

A. Except for items or materials to be salvaged remove waste materials, materials to be recycled from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction at Contractor’s expense.

B. Do not burn waste materials.

END OF SECTION 017419

This document was created by an application that isn’t licensed to use novaPDF.

Purchase a license to generate PDF files without this notice.

http://www.novapdf.com/

SELECTIVE DEMOLITION 024119 - 1

SECTION 024119 - SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Items indicated to be removed and salvaged remain Owner's property. Carefully detach from existing construction, in a manner to prevent damage, and store on site ready for reuse. Include fasteners or brackets needed for reattachment elsewhere.

B. It is not expected that hazardous materials will be encountered in the Work. If hazardous materials are encountered, do not disturb; immediately notify Architect and Owner. Hazardous materials will be removed by Owner under a separate contract.

C. Known items to be demolished

1. Items to be demolished include but are not limited to

a. Existing metal and asphalt roofing materials and underlayments. (waste).

b. Rubble or framing necessary to remove to install proposed framing.

2. Additional demolition may be required.

PART 2 - PRODUCTS

2.1 PEFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with EPA regulations and with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSE A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 DEMOLITION

A. Maintain services/systems indicated to remain and protect them against damage during selective demolition operations. Before proceeding with demolition, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of the building.

B. Locate, identify, shut off, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.

C. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

SELECTIVE DEMOLITION 024119 - 2

D. Protect walls, ceilings, floors, and other existing finish work that are to remain. Erect and maintain dustproof partitions. Cover and protect furniture, furnishings, and equipment that have not been removed.

1. Coordinate with Government before removing or move furniture as needed in order to accomplish work

E. Provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

F. Provide temporary weather protection to prevent water leakage and damage to structure and interior areas.

G. Requirements for Building Reuse:

1. Maintain existing building structure (including structural floor and roof decking) and envelope (exterior skin and framing, excluding window assemblies and nonstructural roofing material) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

2. Maintain existing interior nonstructural elements (interior walls, doors, floor coverings, and ceiling systems) not indicated to be demolished; do not demolish such existing construction beyond indicated limits.

H. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

I. Remove demolition waste materials from Project site and legally dispose of them in an EPA-approved landfill. Do not burn demolished materials.

J. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION 024119

CAST-IN-PLACE CONCRETE 033000 - 1

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SECTION REQUIREMENTS

A. Submittals: Product Data, concrete mix designs, and submittals required by ACI 301.

B. Ready-Mixed Concrete Producer Qualifications: ASTM C 94/C 94M.

PART 2 - PRODUCTS

2.1 PEFORMANCE REQUIREMENTS

A. Comply with ACI 301, "Specification for Structural Concrete," and with ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."

2.2 MATERIALS

A. Reinforcing Bars: ASTM A 615/A 615M, Grade 60 (Grade 420), deformed.

B. Plain Steel Wire: ASTM A 82/A 82M, as drawn.

C. Plain-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, as drawn, flat sheet.

D. Portland Cement: ASTM C 150, Type I or II.

E. Post-Installed Anchors: Expansion Anchors shall be ICC-Approved (Zinc plated in accordance with ASTM B 633, hot-dipped galvanized in accordance with ASTM A 153, or AISI 304 Stainless Steel) and shall conform with FS-S-325, Group II, Type 4, Class 1.

F. Expansion bolts called for on drawings shall be Simpson weg-all, Strong-bolt 2 or approved equal type anchors with diameters and embedments as specified on the drawings.

G. Adhesive anchors shall be ICC-approved and shall consist of all thread anchor rod, nut, washer, and adhesive capsule. Anchor rods shall comply with ASTM A307 (Not used at PT slab).

H. All Epoxy shall be Simpson Set-XP and shall be installed per the manufacturer specifications.

I. Heavy duty screy anchors shall be stainless steel: Sumpson Titen HD or approved Equal.

J. Fly Ash: ASTM C 618, Class C or F.

K. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.

L. Silica Fume: ASTM C 1240, amorphous silica.

CAST-IN-PLACE CONCRETE 033000 - 2

M. Aggregates: ASTM C 33.

1. Maximum Coarse-Aggregate Size: 3/4 inch nominal.

N. Air-Entraining Admixture: ASTM C 260.

O. Chemical Admixtures: ASTM C 494, Do not use calcium chloride or admixtures containing calcium chloride.

P. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

Q. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B.

R. Clear, Solvent-Borne, Membrane-Forming Curing and Sealing Compound: ASTM C 1315, Type 1, Class A.

S. Clear, Waterborne, Membrane-Forming Curing and Sealing Compound: ASTM C 1315, Type 1, Class A.

T. Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic fiber, or ASTM D 1752, cork or self-expanding cork.

2.3 CONCRETE MIXTURES

A. Prepare design mixtures, proportioned according to ACI 301.

B. Normal-Weight Concrete:

1. Minimum Compressive Strength: 3000 psi at 28 days. Or as specified by the drawings.

2. Slump Limit: 4 inches before adding high-range water-reducing admixture or plasticizing admixture], plus or minus 1 inch.

3. Air Content: Maintain within range permitted by ACI 301. Do not allow air content of floor slabs to receive troweled finishes to exceed 3 percent.

4. Use fly ash, pozzolan, ground granulated blast-furnace slag, and silica fume as needed to reduce the total amount of portland cement, which would otherwise be used, by not less than40 percent.

5. For concrete exposed to deicing chemicals, limit use of fly ash to 25 percent replacement of portland cement by weight and granulated blast-furnace slag to 40 percent of portland cement by weight; silica fume to 10 percent of portland cement by weight.

C. Measure, batch, mix, and deliver concrete according to ASTM C 94

1. When air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.

CAST-IN-PLACE CONCRETE 033000 - 3

PART 3 - EXECUTION

3.1 CONCRETING

A. Construct formwork according to ACI 301 and maintain tolerances and surface irregularities within ACI 347R limits of Class A, 1/8 inch for concrete exposed to view and Class C, 1/2 inch for other concrete surfaces.

B. Place vapor retarder on prepared subgrade, with joints lapped 6 inches and sealed.

C. Comply with CRSI's "Manual of Standard Practice" for fabricating, placing, and supporting reinforcement.

D. Install construction, isolation, and contraction joints where indicated. Install full-depth joint-filler strips at isolation joints.

E. Place concrete in a continuous operation and consolidate using mechanical vibrating equipment.

F. Protect concrete from physical damage, premature drying, and reduced strength due to hot or cold weather during mixing, placing, and curing.

G. Formed Surface Finish: Smooth-formed finish for concrete exposed to view, coated, or covered by waterproofing or other direct-applied material; rough-formed finish elsewhere.

H. Slab Finishes: Comply with ACI 302.1R for screeding, restraightening, and finishing operations for concrete surfaces. Do not wet concrete surfaces. Provide the following finishes:

1. Scratch finish for surfaces to receive mortar setting beds.

2. Float finish for surfaces to receive waterproofing, roofing, or other direct-applied material.

3. Troweled finish for floor surfaces and floors to receive floor coverings, paint, or other thin film-finish coatings.

4. Trowel and fine-broom finish for surfaces to receive thin-set tile.

5. Nonslip-broom finish to exterior concrete platforms, steps, and ramps.

I. Cure formed surfaces by moisture curing for at least seven days.

J. Begin curing concrete slabs after finishing. Apply membrane-forming curing and sealing compound to concrete.

K. Contractor will engage a testing agency to perform field…