This scope of work document outlines requirements for the acquisition of pit run gravel for Felsenthal National Wildlife Refuge. The contractor will be required to deliver approximately 1,400 tons of pit run gravel or river gravel to the refuge, coordinating delivery with the Refuge Manager. Estimates must be priced per ton of gravel delivered according to the scope of work. Deliveries can occur Monday through Friday between 7:00 am and 3:00 pm, excluding holidays, and must accommodate climatic conditions. The contractor must provide weight tickets for each load delivered.

The related federal contract opportunity is solicitation number 140FS323Q0192 to supply and deliver pit run gravel at Felsenthal National Wildlife Refuge, issued by the Department of the Interior Fish and Wildlife Service. Pricing will be based on cost per ton of gravel delivered according to the scope of work and delivery requirements.

View the file

Other files

File Type Posted
Sol_140FS323Q0192.pdf PDF
Clauses_Q4.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

FWS FELSENTHAL NWR

5531 Highway 82 West

CROSSETT AR 71635

Scope of Work for the

Acquisition of Pit Run gravel/rock

Scope Of Work

Deliver (stockpile) approximately 1,400 tons of pit run gravel aka borrow pit gravel or river gravel. All pit run gravel will be delivered to Felsenthal NWR. Delivery will be coordinated with Refuge Manager. Gravel is stockpiled for future use over multiple assets.

Minimum Requirements

• Estimates are to be priced at cost per ton of gravel/rock and per the Scope of Work.

• Deliveries will be allowed Monday through Friday (except holidays) 7:00 am – 3:00 pm and as climatic conditions allow.

• Weight tickets shall be provided for each load delivered.