A04_Scope_of_Work_generator_AST_building.docx
DOCX document 14 KB Posted
- Attached to
- LA-NATCHITOCHES NFH-GENERATOR INSTALL
- Solicitation number
- 140FS325Q0110
About this file
This document is a Scope of Work for a standby generator installation at the Alligator Snapping Turtle Building. The project requires providing and installing a 22KW natural gas generator with specific technical specifications, including a 993 cc commercial-grade engine, 120/240 single-phase output, and a 150-amp transfer switch. Additional requirements include a rainproof enclosure, battery with 625 cold cranking amps, and a residential-grade muffler operating at 68 dBA noise level.
The generator installation is part of a federal contract opportunity (Solicitation Number: 140FS325Q0110) for the Department of the Interior Fish and Wildlife Service, specifically for the LA-NATCHITOCHES NFH location. The contractor will be responsible for making all plumbing and electrical connections, setting up the transfer switch, and providing employee training on generator operation and testing. The customer will supply the installation pad, and the generator is configured to run on natural gas.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS325Q0110.pdf | ||
| Attachment_2_Wage_Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Standby Generator Alligator Snapping Turtle Building
Provide and Install 22KW generator – Natural Gas - 60 Hz Engine generator unit 120/240 single phase
| Engine: 993 cc Commercial grade | |
| Engine instruments: oil pressure, battery charge, run time meter | |
| Enclosure: rainproof | Battery: 625 cold cranking amps |
| Muffler: Residential grade housed unit w/- 68 dBA | |
| Transfer Switch: 2 pole 120/240 single phase 150 amps Nema 3R/ Load shed |
Note 1: Fuel: Set up to run on customers Propane ( ) Natural Gas ( X ) Note 2: Pad Supplied by customer.
Make all plumbing and electrical connection including the set up and installation of transfer switch.
Provide training to employees on the operation and testing of generator.