Statement of Work Installation and Construction of High-Speed Internet Service Infrastructure at EISE Locations in Gettysburg, PA.

Introduction

Eisenhower National Historic Site (EISE), located in Gettysburg, PA, is in need of more internet/WAN bandwidth than is currently available to get our online-based work accomplished and to keep our Cisco VoIP system running effectively. The existing network infrastructure is through CenturyLink and they cannot provide any better service than DSL. Installing high speed internet through Comcast Cable is the only viable option in the current marketplace.

Quotes shall include all the one-time installation fees for outside network construction, demarcation equipment, and to bring optical internet and/or cable modem internet to each location where covered before internet service starts.

Installation

Installation, as needed, to provide high-speed internet service shall occur at the following Gettysburg, PA locations designated in the table below for the specific services described. The contract shall be for installation and construction only and not for services the installation shall make available.

Table 1

Service Address Service Description 250 Eisenhower Farm Road, Gettysburg, PA 17325

Comcast Business Upgrade to 200 download / 20 upload, Cable Modem

The overall installation shall include outside network construction and the installation of demarcation equipment to bring Optical Internet and HFC cable modem internet to the specified locations in Table 1.

The contractor shall assign an outside plant engineer to work with NPS personnel to design access routes with consideration for the unique historical aspects of the locations. Eisenhower National Historic Site will assign a Cultural Resource Manager to work with the contractor-assigned outside plant engineer.

Construction at historical locations in Eisenhower National Historic Site shall proceed only with the prior approval of EISE’s assigned Cultural Resource Manager.

Timeline for Installation Completion

90-180 days for installation completion after award of contract. If more than 180 days is needed for permits, construction, or Section 106 National Historic Preservation Act compliance, it will be granted as necessary with Contracting Officer’s approval.

Telephone pole on Eisenhower Farm Lane and Emmitsburg Road. Cable is already under the road and on this telephone pole.

Rear view of the Eisenhower Farm 2 Headquarters building. New utility can be collocated with the other existing utilities.