This Statement of Work (SOW) details a monitoring project for the Bureau of Land Management's Red Devil Mine landspread facility in Alaska. The objective is to conduct progress monitoring of petroleum-contaminated soil in Decision Unit 5 using Multi-Incremental Sampling (MIS) methodology, with the goal of tracking diesel range organic contaminant levels to predict when the soil will meet Alaska Department of Environmental Conservation (ADEC) cleanup standards of 250 mg/Kg.

The project requires the contractor to: 1) mobilize via chartered aircraft to the remote Red Devil Village site, 2) collect primary, duplicate, and triplicate soil samples from the landspread facility, 3) conduct trend analysis of contaminant levels, 4) develop and submit a work plan addendum and summary report for BLM and ADEC review, and 5) comply with environmental protocols including equipment decontamination and prevention of invasive species spread. The field work will be supervised by a BLM Project Inspector, with transportation and logistics carefully coordinated to support the monitoring activities at this abandoned mercury mining site.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Land Management Solicitation #140L6325Q0050 Statement of Work Red Devil Mine 2026 Landspread Progress Monitoring July 7, 2025

A. Introduction:

The Red Devil Mine (RDM) is an abandoned cinnabar mine and mercury retorting operation at a remote location near the village of Red Devil, Alaska. Processed mercury was produced at RDM from the late 1930’s through the late 1960’s. The mine was abandoned in about 1970 and has been unoccupied since that time. The BLM initiated environmental restoration and remediation in the late 1990’s and that process has continued to the present.

The RDM site is located on the south bank of the Kuskokwim River approximately 2 miles upstream from Red Devil Village. Red Devil Village is accessible by aircraft year-round and by boat in summer. Access to the RDM is along approximately 2 miles of pioneer road from the airstrip, or by boat to the mouth of Red Devil Creek. Legal description of the property is: Township 19 North, Range 44 West, Southeast ¼ of Section 6, Sleetmute D-4 Quadrangle, Seward Meridian, Alaska. The RDM location relative to Anchorage and Red Devil Village are illustrated on maps in Attachment 1.

When the mine was active, diesel fuel was stored in five large above ground tanks located near the river on the northeast edge of the mine. The tanks were demolished as part of initial cleanup, and a large volume of petroleum contaminated soil was excavated in 2010. A large landspread facility was constructed to treat the soil. The facility is organized into six 100’ x 100’ Decision Units (DU). The soil in each DU to be monitored is .5 to 1.5 feet deep. GPS coordinates for the approximate center of the 200’ x 300’ landspread facility are 61°45'40.78"N / 157°18'52.53"W. See attached maps and photos.

Hydrocarbon concentrations in five DUs (DUs 1-4, and 6) now meet ADEC cleanup standards and no longer require monitoring. The soil concentration in DU 5 has yet to meet ADEC level and is still being monitored.

The objective of this project is to have a qualified person measure and document treatment progress of soils in a “landspread” treatment facility at the Red Devil Mine. The contractor shall monitor DU 5 at the RDM landspread facility and report the resulting data to the BLM and ADEC. The most recent (2024) sampling event was accomplished by two persons working onsite for about 8 hours. The field team mobilized and demobilized via air charter the same day soil samples were collected.

B. Contract Tasks:

B1. General Requirements

1. Mobilization will not occur without an ADEC approved work plan. All response to hazardous and non-hazardous solid wastes on the site shall comply with 18AAC75 and 18AAC60 respectively, and other applicable federal and State laws and regulations.

2. Field work at the Site shall be done in presence of a BLM Anchorage Field Office (AFO) Project Inspector (PI).

3. The contractor will provide transportation from Anchorage to Red Devil Village airstrip on a chartered aircraft. The aircraft and the pilot must be DOI carded. A Pilatus PC-12 has been used in the past to reach RDM, but the aircraft type is subject to availability. Contractor will need to coordinate date/time and manifesting of personnel and cargo with the BLM Project Manager. Contractor should expect seats for 4-6 personnel. The aircraft will wait on the ground at the Red Devil Airstrip. Travel date will be established at least 30 days in advance, although may need to be adjusted short-notice due to flying weather and aircraft availability.

4. Execution of this project will comply with National Environmental Policy Act (NEPA) policy by preventing and controlling invasive non-native plant and noxious weed introduction or spreading per Executive Order 13112.

The contractor shall observe the standard practice of decontaminating all equipment and personnel before mobilization and before demobilization from the site, to include characterization and proper disposal of demobilization decon wash/rinse wastewater. The contractor shall thoroughly clean all vehicles, transport equipment used in access and construction, and Personal Protective Equipment (PPE) used by the on-site crew prior to moving equipment across or onto BLM managed lands to ensure it is weed and weed seed free. The contractor’s cleaning shall include high pressure washing where practical to treat the insides of bumpers, wheel wells, undercarriages, inside belly plates, excavating blades, buckets, tracks, rollers, drills, buckets, shovels, any digging tools, and any other equipment to remove potential weed and weed seed carrying soil, greasy dirt, and vegetative material.

B2. Petroleum Contaminated Soil Treatment Monitoring The contractor shall conduct progress monitoring of petroleum contaminated soil in DU 5 using Multi-Incremental Sampling (MIS) procedure in accordance with the Maintenance and Monitoring Plan provided in Attachment 1. The main contaminant of concern is diesel range organics, as measured using method AK-102. A primary sample is to be analyzed from DU 5 as well as duplicate and triplicate samples.

B3.

The contractor shall conduct a simple trend analysis to predict when the soil in DU 5 will reach the MTG cleanup level of 250 mg/Kg (18 AAC 75)

C. Submittals:

C1. M&M work plan:

The contractor shall submit a work plan addendum, referencing the 2011 work plan approved (Attachment 2), following the example addendum (Attachment 3). A draft work plan addendum shall be submitted to BLM for review and comment. The contractor shall revise the draft work plan addendum per BLM comments and transmit the revised draft to the BLM. The BLM shall forward the revised work plan addendum to the ADEC POC for review and comment. The contractor shall revise the work plan addendum per ADEC comments and submit the final version to the BLM prior to mobilizing to RDM.

The draft work plan addendum shall be submitted to the BLM as a MS Word 2010 (Word) document. Figures may be submitted as PDF files. The BLM shall provide comments using track changes in the Word document. The contractor shall revise the document per BLM comments and submit a revised draft work plan addendum as a complete PDF (figures included). The revised draft work plan addendum shall be submitted to the ADEC for review and comment. The contractor shall modify the document per ADEC comments and compile a final version. The contractor shall submit 4 hardcopies of the final report and a fully compiled PDF. The final work plan addendum shall be formatted such that it is in compliance with Section 508 of the Rehabilitation Act1.

C2. Summary report:

The contractor shall submit a report to include the trend analysis for DU 5 that’s similar in format and content to the 2019 M&M Summary Report (Attachment 4). A draft report shall be submitted to BLM for review and comment. The contractor shall revise the draft report per BLM comments and transmit the revised draft back to the BLM. The BLM shall forward the revised report to the ADEC POC for review and comment. The contractor shall revise the report per ADEC comments and submit the final version to the BLM.

The draft report shall be submitted to the BLM as a MS Word 2010 (Word) document. Figures may be submitted as PDF files. The BLM shall provide comments using track changes in the Word document. The contractor shall revise the document per BLM comments and submit a revised draft report as a complete PDF (figures included). The revised draft report shall be submitted to the ADEC for review and comment. The contractor shall modify the document per ADEC comments and compile a final version. The contractor shall submit 4 hardcopies of the final report and a fully compiled PDF. The final work plan addendum shall be formatted such that it is in compliance with Section 508 of the Rehabilitation Act1.

508 Compliance: The .pdf final report shall be in Rehabilitation Act Section 508 compliant format subject to being made available to the public via being posted on the internet. Section 508 requires that Federal agencies' electronic and information technology is accessible to people with disabilities to assure accessibility by the visually impaired using assistive technology such as screen readers and refreshable Braille displays. Guidance on Section 508 compliance is available at: http://www.section508.gov/

D. Administrative:

D1. Contacts:

Questions will only be accepted via EMAIL and must be directed to Lisa Brune, lbrune@blm.gov.

D2. Attachments

1. Location Map and Photos

2. 2011 RDM Landspread M&M Plan

3. 2019 RDM Landspread M&M Work Plan Addendum

4. 2019 M&M Summary Report (Lab Data Package Omitted)

File details come from the government source that posted it. Updated .