SECTION MT-01009
GENERAL INFORMATION AND REQUIREMENTS
PART 1: GENERAL
1.01 SUMMARY:
A. Description of Work: Furnishing labor, equipment, supplies, and materials to crack seal, chip seal, and stripe the existing pavements and other related work at the Fort Benton Interpretive center parking lot in accordance with the contract drawings and specifications. The Interpretive
Center will remain open to staff and visitors. The Government will advertise the work being done and parking will only be available on street during work.
B. Stipulations for Performance Time & Parking Lot Closure: The Contractor shall accomplish the work in 9 calendar days within the given performance time of Site Closure Dates as follows: No variance in number of days will be allowed in the Site Closure Dates in order to accommodate Public and
Employee Use. The Government will review the contract work schedule and adjust the start date to the most beneficial date.
1.Actual start date will be determined at the Pre-Work Conference. See Period of Performance for time frame.
a. Fort Benton Interpretive Center parking lot shall be closed to the Public for the following work: Contractor shall perform all work required but not limited to: cleaning of pavements, crack and chip sealing of pavements, vac brooming of chips and hauled off site and striping in accordance with contract specifications and drawings.
C. Location: Work under this Contract is located in Choteau County, Montana.
Work locations are shown on drawings.
1.02 REFERENCES:
A. Referenced Specifications/Standards with Abbreviations and/or Acronyms:
Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor from the following:
ASTM
FP
American Society for Testing and Materials
1916 Race Street
Philadelphia, PA 19103
Standard Specifications for Construction of Roads and
Bridges on Federal Highway Projects
Superintendent of Documents
Government Printing Office
Washington, DC 20402
GENERAL INFORMATION AND REQUIREMENTS 6/20
FORT BENTON INTERPTETIVE CENTER CHIP SEAL
MT-01009-1