This document outlines a sole source contract opportunity for a pre-engineered building kit replacement at the Quilcene National Fish Hatchery. The U.S. Fish and Wildlife Service intends to award an firm fixed price contract to Absolute Storage, LLC to provide a pre-engineered building kit for adult salmon handling activities. The new 20' x 56' galvanized steel structure with lean-to and garage doors will replace an existing damaged tent. It must meet Jefferson County building codes for snow, wind, and structural loads. Absolute Storage will supply all required materials and hardware for on-site self-installation by March 1, 2024, and provide engineered building plans, calculations, and installation instructions. The North American Industry Classification System code is 332311 and the size standard is 750 employees. Interested parties may submit capability statements by November 15th as consideration for future competitive opportunities.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Quilcene National Fish Hatchery
281 Fish Hatchery RD, Quilcene, WA 98376 Spawning Building Replacement
1. GENERAL: The U.S. Fish and Wildlife Service, Quilcene National Fish Hatchery located in Quilcene Washington is seeking to purchase a pre-engineered building kit as a replacement building for adult salmon handling activities. The current structure is a permanent tent that has been damaged by strong winds and will be removed by hatchery staff before work begins. The new structure will be a galvanized steel tube framed, sheet metal sided building with a vapor shield and reflective insulation. We will purchase the kit and install it in-house with a USFWS Maintenance Action Team.
2. SCOPE: The new spawning building structure will be 20’ wide and 56’ long with 12’ wide by 10’ high garage style door frame-outs centered on both north and south ends. The main building will be 16’ wide by 40’ long with 4, 4’x4’ window frame-outs on the same side as a lean-to for public viewing of spawning operations. On that same side will be a single pedestrian door frame out. The lean-to will be 4’ wide by 40’ long and will provide protection from the elements for the public while viewing. There will be a double-pedestrian door frame-out on the opposite side.
There will be a gable-end roof extension of 16’ on the south side of the building. The building is to be as close as possible in color to the existing main hatchery building with a red roof, brown trim, and stone/tan wall color. The new building will adhere to Jefferson County building codes for snow, rain, and wind shear. Jefferson County requires minimum wind load of 110mph with a 3 second gust and roof snow load of 25PSF. The kit will include all materials and hardware required to build the structure, including but not limited to: 4' on-center frame system, exterior roof & wall panels (26 gauge minimum), complete trim package and ground or concrete anchors.
The vendor will provide signed & stamped engineered plans with all structural calculations for both the structure and the foundation.
The customized building plan that fits our unique footprint shall be provided at no additional cost. Also, the kit shall include stamped engineered blueprints with all structural calculations for both the structure and the foundation, which is required by IMD.
Responses shall include proposed material and installation instructions, estimated delivery date, and warranty.
3. PLACE/DELIVERY AND PERIOD OF PERFORMANCE: The Contractor shall deliver all materials by March 1, 2024.
4. INSPECTION AND ACCEPTANCE: All materials will be inspected upon delivery.
5. GOVERNMENT FURNISHED EQUIPMENT OR MATERIALS/INFORMATION:
None
6. AVAILABILITY: All deliveries will be within 7am and 4pm Monday-Thursday.
7. TECHNICAL COORDINATOR
8. PICTURES:
South side concept picture of new building (Does not doors, windows or gable end roof extension.)
Southwest view of current tent structure and build site (New building site to share same northwest corner as old building)
File details come from the government source that posted it. Updated .