This document provides specifications for the construction of a new headquarters and visitor center building at the Long Lake National Wildlife Refuge in North Dakota. The project involves demolishing an existing building and constructing a new 5,000 square foot office, visitor center, and associated site utilities and improvements. Key specifications include earthwork, site utilities, exterior concrete work, structural insulated panel walls with siding, shop-fabricated wood truss roof, doors and windows, interior partitions and finishes, plumbing, HVAC, electrical, and communications systems. Construction documents include plans, technical specifications organized by CSI division, and requirements for submittals, quality control, and project closeout. The solicitation number indicates this opportunity is for a pre-solicitation notice for the construction project.

View the file

Other files for this federal contract opportunity

Other files attached to ND-LONG LAKE NWR-CONSTRUCT MULTI-PURPOSE, newest first.
File Type Posted
A04_-_Long_Lake_-_Construction_Drawings_1.pdf PDF
Small_Business_Sources_Sought_Long_Lake_Multi-Purpose_BLDG_1.pdf PDF
A04_-_Long_Lake_-_Submittals_1.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES

DEPARTMENT OF THE INTERIOR

FISH AND WILDLIFE SERVICE

REGION 6 ENGINEERING

Lakewood, Colorado

LONG LAKE HEADQUARTERS

AND VISITOR CENTER BUILDING

LONG LAKE NATIONAL WILDLIFE REFUGE

BURLEIGH COUNTY, NORTH DAKOTA

21-025

CONSTRUCTION DOCUMENTS

May 9, 2022

LONG LAKE HEADQUARTERS

AND VISITOR CENTER BUILDING

21-025

Owner:

United States

Department of the Interior

Fish and Wildlife Service

Region 6 Engineering

134 Union Boulevard

Lakewood, CO 80228

Engineer:

DOWL

1833 South Sheridan Avenue

Sheridan, WY 82801 mhines@dowl.com

May 9, 2022

HEADQUARTERS AND VISITOR CENTER BUILDING

(21-025)

INDEX 000001 - 1

DESCRIPTION/SPECIFICATIONS

CONSTRUCTION DOCUMENTS

INDEX

DIVISION 1 - GENERAL REQUIREMENTS No. of Pages

SECTION 011000 SUMMARY 6

012500 SUBSTITUION PROCEDURES 3

012900 PAYMENT PROCEDURES 1

013100 PROJECT MANAGEMENT AND COORDINATION 8

013200 CONSTRUCTION PROGRESS DOCUMENTATION 2

013233 PHOTOGRAPHIC DOCUMENTATION 3

013300 SUBMITTAL PROCEDURES 8

013310 SUBMITTAL TEMPLATE 1

014000 QUALITY REQUIREMENTS 7

015000 TEMPORARY FACILITIES AND CONTROLS 5

016000 PRODUCT REQUIREMENTS 5

017419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 5

017700 CLOSEOUT PROCEDURES 2

017823 OPERATION AND MAINTENANCE DATA 7

DIVISION 2 – EXISTING CONDITIONS No. of Pages

SECTION 024116 STRUCTURE DEMOLITION 6

024119 SELECTIVE DEMOLITION 8

DIVISION 3 - CONCRETE No. of Pages

SECTION 033000 CAST-IN-PLACE CONCRETE 16

035413 GYPSUM CONCRETE UNDERLAYMENT 5

DIVISION 4 - MASONRY No. of Pages

SECTION 048500 NATURAL THIN VENEER STONE 7

DIVISION 5 - METALS No. of Pages

SECTION 055000 METAL FABRICATIONS 4

DIVISION 6 – WOOD, PLASTICS AND COMPOSITES No. of Pages

SECTION 061000 ROUGH CARPENTRY 6

061200 STRUCTURAL INSULATED PANELS 6

061600 SHEATHING 3

061715 ENGINEERED STRUCTURAL WOOD 5

061753 SHOP FABRICATED WOOD TRUSSES 3

062000 FINISH CARPENTRY 4

INDEX 000001 - 2

DIVISION 7 - THERMAL & MOISTURE PROTECTION No. of Pages

SECTION 071100 DAMPPROOFING 2

072100 THERMAL INSULATION 3

072114 METAL FACED INSULATED SHEATHING 6

072129 SPRAYED FOAM THERMAL INSULATION 3

072616 BELOW-GRADE VAPOR RETARDERS 4

074646 FIBER-CEMENT SIDING 7

076100 SHEET METAL ROOFING 7

076200 SHEET METAL FLASHING AND TRIM 6

079200 JOINT SEALANTS 4

DIVISION 8 - OPENINGS No. of Pages

SECTION 081113 HOLLOW METAL DOORS AND FRAMES 6

081400 WOOD DOORS 5

083100 ACCESS DOORS AND PANELS 2

083313 COILING COUNTER DOORS 4

084113 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS 4

085413 FIBERGLASS CASEMENT WINDOWS 6

087000 HARDWARE 23

088000 GLAZING 4

089000 LOUVERS AND VENTS 3

DIVISION 9 - FINISHES No. of Pages

SECTION 092116 GYPSUM BOARD ASSEMBLIES 6

092216.13 NONSTRUCTURAL METAL STUD FRAMING 1

092236.23 METAL LATH 1

093000 TILING 4

095100 ACOUSTICAL CEILINGS 4

096500 RESILIENT FLOORING 3

096513 RESILIENT BASE AND ACCESSORIES 3

096800 CARPETING 4

099000 PAINTING AND COATING 8

DIVISION 10 - SPECIALTIES No. of Pages

SECTION 102813 TOILET ACCESSORIES 3

104400 FIRE PROTECTION SPECIALTIES 3

105100 LOCKERS 2

107500 FLAGPOLES 3

DIVISION 11 No. of Pages

SECTION NOT USED NA

DIVISION 12 – FURNISHINGS No. of Pages

SECTION 122100 WINDOW BLINDS 4

123200 MANUFACTURED WOOD CASEWORK 2

124813 ENTRANCE FLOOR GRIDS AND FRAMES 4

INDEX 000001 - 3

DIVISIONS 13 THROUGH 21 No. of Pages

DIVISION 22 – PLUMBING No. of Pages

SECTION 220000 PLUMBING GENERAL REQUIREMENTS 8

220500 COMMON WORK RESULTS FOR PLUMBING 8

220517 SLEEVES AND SLEEVE SEALS FOR PLUMBING PIPING 4

220518 ESCUTCHEONS FOR PLUMBING PIPING 2

220519 METERS AND GAGES FOR PLUMBING PIPING 6

220523.12 BALL VALVES FOR PLUMBING PIPING 5

220523.14 CHECK VALVES FOR PLUMBING PIPING 5

220529 HANGARS AND SUPPORTS FOR PLUMBING 8

PIPING AND EQUIPMENT

220548.13 VIBRATION CONTROLS FOR 14

PLUMBING PIPING AND EQUIPMENT

220553 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT 5

220593 TESTING, ADJUSTING AND BALANCING FOR PLUMBING 13

220719 PLUMBING PIPING INSULATION 19

221113 FACILITY WATER DISTRIBUTION PIPING 11

221116 DOMESTIC WATER PIPING 14

221119 DOMESTIC WATER PIPING SPECIALTIES 8

221316 SANITARY WASTE AND VENT PIPING 10

221319 SANITARY WASTE PIPING SPECIALTIES 7

223400 FUEL-FIRED, DOMESTIC-WATER HEATERS 4

224213.13 COMMERCIAL WATER CLOSETS 4

224216.13 COMMERCIAL LAVATORIES 4

224216.16 COMMERCIAL SINKS 5

DIVISION 23 – HEATING, VENTILATING,

AND AIR CONDITIONING No. of Pages

SECTION 230000 MECHANICAL GENERAL REQUIREMENTS 8

230500 COMMON WORK RESULTS FOR HVAC 8

230513 COMMON MOTOR REQUIREMENTS FOR HVAC 3

EQUIPMENT

230517 SLEEVES AND SLEEVE SEALS FOR HVAC PIPING 4

230518 ESCUTCHEONS FOR HVAC PIPING 2

230523.12 BALL VALVES FOR HVAC PIPING 12

230529 HANGARS AND SUPPORTS FOR HVAC 8

PIPING AND EQUIPMENT

230548.13 VIBRATION CONTROLS FOR HVAC 13

230553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT 6

230593 TESTING, ADJUSTING, AND BALANCING FOR HVAC 8

230713 DUCT INSULATION 15

230719 HVAC PIPING INSULATION 22

230923 DIRECT DIGITAL CONTROL (DDC) SYSTEM FOR HVAC 90

230923.11 CONTROL VALVES 12

INDEX 000001 - 4

No. of Pages

230923.12 CONTROL DAMPERS 12

230993.11 SEQUENCE OF OPERATIONS FOR HVAC DDC 4

231126 FACILITY LIQUEFIED-PETROLEUM GAS PIPING 19

232113 HYDRONIC PIPING 13

232116 HYDRONIC PIPING SPECIALTIES 5

232123 HYDRONIC PUMPS 5

232300 REFRIGERANT PIPING 13

232513 WATER TREATMENT FOR CLOSED-LOOP HYDRONIC

SYSTEMS 4

233113 METAL DUCTS 13

233300 AIR DUCT ACCESSORIES 15

233423 HVAC POWER VENTILATORS 6

233600 AIR TERMINAL UNITS 13

233713 DIFFUSERS, REGISTERS AND GRILLS 4

235216 CONDENSING BOILERS 6

236200 PACKAGED COMPRESSOR AND CONDENSER UNITS 5

238219 FAN COIL UNITS 4

238239.13 CABINET UNIT HEATERS 6

238316 RADIANT-HEATING HYDRONIC PIPING 6

DIVISION 26 - ELECTRICAL No. of Pages

SECTION 260000 ELECTRICAL GENERAL REQUIREMENTS 9

260045 TRENCHING FOR SITE UTILITIES 3

260050 FIRESTOPPING 3

260519 LOW-VOLTAGE POWER CONDUCTORS AND 7

CABLES

260526 GROUNDING AND BONDING FOR ELECTRICAL 5

SYSTEMS

260529 HANGERS AND SUPPORTS FOR ELECTRICAL 4

SYSTEMS

260534 CONDUIT 10

260537 BOXES 7

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 5

260919 ENCLOSED CONTACTORS 3

262416 PANELBOARDS 7

262716 CABINETS AND ENCLOSURES 3

262717 EQUIPMENT WIRING 3

262726 WIRING DEVICES 9

262813 FUSES 3

262818 ENCLOSED SWITCHES 5

262913 ENCLOSED CONTROLLERS 3

263213 ENGINE GENERATORS 14

263600 TRANSFER SWITCHES 7

INDEX 000001 - 5

No. of Pages

264300 SURGE PROTECTIVE DEVICES 5

265100 INTERIOR LIGHTING 6

265600 EXTERIOR LIGHTING 5

DIVISION 27 – COMMUNICATIONS No. of Pages

SECTION 270500 COMMON WORK RESULTS FOR COMMUNICATIONS 4

270507 COMMUNICATIONS RACEWAY SYSTEM 3

271021 VOICE/DATA SYSTEMS – CAT 6 9

275132 TELEVISION SYSTEMS 4

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY No. of Pages

SECTION 280500 COMMON WORK RESULTS FOR ELECTRONIC 4

SAFETY AND SECURITY

283111 ADDRESSABLE FIRE-ALARM SYSTEM 25

DIVISIONS 29 THROUGH 30 No. of Pages

DIVISION 31 - EARTHWORK No. of Pages

SECTION 311000 SITE CLEARING 4

312000 EARTH MOVING 11

313700 RIPRAP 2

DIVISION 32 – EXTERIOR IMPROVEMENTS No. of Pages

SECTION 321313 CONCRETE PAVING 9

321373 CONCRETE PAVING JOINT SEALANTS 3

321723 PAVEMENT MARKINGS 2

321726 TACTILE WARNING SURFACING 3

321730 PARKING SIGNAGE 2

329113 SOIL PREPARATION 7

DIVISION 33 - UTILITIES No. of Pages

SECTION 330500 COMMON WORK RESULTS FOR UTILITIES 12

331416 SITE WATER DISTRIBUTION PIPING 8

333113 SITE SANITARY SEWERS 5

334100 STORM UTILITY DRAINAGE PIPING 2

SUMMARY 011000 - 1

SECTION 011000 - SUMMARY

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Project background.

3. Work covered by Contract Documents.

4. Work under separate contracts.

5. Access to site.

6. Coordination with occupants.

7. Coordination with local utilities.

8. Work restrictions.

9. Permits and Fees.

10. Applicable codes, standards, and specifications.

11. Means and methods.

12. Safety.

13. Environmental Protection.

B. Related Requirements:

1. Section 015000-Temporary Facilities and Controls for limitations and procedures governing temporary use of Government's facilities.

1.2 PROJECT INFORMATION

A. Project Location: Long Lake NWR, 12000 353rd St. SE, Moffit, ND 58560, Burleigh County

B. Station Contact Information: Jared Newton, Station Manager, (701)329-0857, Jared_Newton@fws.gov

1.3 PROJECT BACKGROUND

A. Demolish existing Long Lake HQ building and design and construct a new building in it’s place.

1.4 WORK COVERED BY CONTRACT DOCUMENTS

1.5 The work consists of the design of a new 5,000 square foot office building, visitor center and associated site utilities and improvements. The work includes, but is not limited to earthwork, site utilities, exterior concrete flatwork, floor assemblies, structural insulated panel walls with

SUMMARY 011000 - 2

siding, shop-fabricated wood truss roof, doors and windows, interior framed partitions and finishes, plumbing, HVAC system, and electrical power and lighting systems.

1.6 WORK UNDER SEPARATE CONTRACTS

A. General: In the event there is work being performed under a separate contract the Contractor shall cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract or other contracts.

Coordinate the Work of this Contract with work performed under separate contracts.

1.7 ACCESS TO SITE

A. All operations of the Contractor (including storage of materials) upon Government premises shall be confined to areas authorized or approved by the Contracting Officer.

B. Limit use of Project site areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated.

1. Limits: Confine construction operations to project site.

2. Driveways, Walkways and Entrances: Keep driveways and loading areas, and entrances serving premises clear and available to Government, Government Representatives, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

C. Condition of Existing Building: Maintain portions of existing building affected by construction operations in a weather tight condition throughout construction period. Repair damage caused by construction operations.

1.8 COORDINATION WITH OCCUPANTS

A. Partial Government Occupancy: Government will occupy the premises during entire construction period, with the exception of areas under construction. Cooperate with Station Manager during construction operations to minimize conflicts and facilitate usage. Perform the Work so as not to interfere with Government operations. Maintain existing exits unless otherwise indicated.

1. Provide not less than 48 hours' notice to Government of activities that will affect Government's operations.

1.9 WORK RESTRICTIONS

A. Work Restrictions, General: Comply with restrictions on construction operations. Comply with limitations on use of public streets and with other requirements of authorities having jurisdiction.

B. On-Site Work Hours: Limit work in the existing building to normal business working hours of 7:00 a.m. to 4:00 p.m., Monday through Friday, unless otherwise indicated.

SUMMARY 011000 - 3

1. Work on weekends will be restricted to Contracting Officers approval and at the Station Managers discretion.

2. No work will take place over Federally observed holidays.

C. Existing Utility Interruptions: Do not interrupt utilities serving facilities occupied unless permitted under the following conditions and then only after providing temporary utility services according to requirements indicated:

1. Notify Station Manager not less than 48 hours in advance of proposed utility interruptions.

D. Noise, Vibration, and Odors: Coordinate operations that may result in high levels of noise and vibration, odors, or other disruptions to the Government.

1. Notify Station Manager not less than 48 hours in advance of proposed disruptive operations.

E. Nonsmoking Building: Smoking is not permitted within the building or within 25 feet (8 m) of entrances, operable windows, or outdoor-air intakes.

1.10 COORDINATION WITH LOCAL UTILITIES

A. The Contractor shall be responsible for contracting and arranging with local utility for the termination, moving, or connection of utilities that serve existing buildings and ones that are planned to serve the new Work.

B. Local utilities that serve Long Lake NWR are:

1. Capital Electric, 4111 State St, Bismarck, ND 58503, (701) 223-1513

2. South Central Regional Water, 10700 ND-1804, Bismarck, ND 58503, (701) 258-8710

1.11 PERMITS AND FEES

A. The Contractor shall be responsible for obtaining all necessary local, State, and Federal permits and licenses, and payment of related fees, per the Contract Clauses.

1.12 APPLICABLE CODES, STANDARDS AND SPECIFICATIONS

A. All work shall comply with the codes and standards applicable to each type of work as listed in individual Sections of these Specifications.

B. Where a conflict occurs between a referenced document and the Project Specifications, the Project Specifications govern.

C. Where a conflict occurs between referenced documents, the document containing the most stringent requirements governs.

SUMMARY 011000 - 4

D. Where referenced documents are not specified by date, the document current at the bid opening applies.

E. Materials, applications, and tests specified by reference to published standards of society, association, code, or other published standards are included in the specifications as if written in their entirety.

F. Conform to all regulations and statutes of the State of North Dakota and to all Federal Regulations which apply.

1.13 MEANS AND METHODS

A. Means and methods of construction shall be such as the Contractor or subcontractors may choose; subject, however, to the Contracting Officer's right to reject means and methods proposed which:

1. Constitute a hazard to the work, persons, or property.

2. Will not produce finished work in accordance with terms of the contract.

3. Are contrary to specified means or methods included in the contract.

B. The right to reject means and methods of the Contractor or subcontractor shall not be construed or interpreted as acceptance of control of means and methods by the Contracting Officer.

C. The Contracting Officer's approval of means and methods or failure to exercise right to reject means and methods shall not relieve the Contractor of the obligation to complete the work required by the contract.

D. Total responsibility for control of all means and methods lies with the Contractor for all work.

1.14 SAFETY

A. The Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient flasher lights, flagmen, danger signals and signs, and shall take all necessary precautions for the protection of the work and the safety of the public. All ponds and water control structures shall remain accessible by vehicle. Roads closed to traffic shall be protected by effective barricades and shall be placed with acceptable warning signs. All barricades and obstructions shall be illuminated at night and all lights shall be kept burning from sunset until sunrise. Install appropriate traffic signs at crossroads and approaches to site as needed to direct affected public traffic. Specific signs and barricade requirements are detailed in the U.S. Department of Transportation, "Manual on Uniform Traffic Control Devices".

B. The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site, including the provisions of 29CFR1910 and 29CFR1926 of the Code of Federal Regulations. The Contractor shall hold harmless the Government for failure to comply with any applicable safety or health regulation on the part of himself, his employees, or his subcontractors.

SUMMARY 011000 - 5

C. Provide personal safety equipment and training commensurate with the hazards which may exist at the work site. The personal safety equipment and training shall be determined by a thorough hazard analysis of all work site areas. The safety program available at all work sites shall include a minimum of:

1. One nonfreezing-type fire extinguisher in each workshop and shed used for storage of materials at the work site. Place in location readily accessible to construction personnel.

2. A first aid kit for use of construction personnel commensurate with size of project with items necessary for first aid treatment of all injuries.

3. The Contractor shall conduct regular onsite safety inspections and all construction personnel shall receive a safety orientation.

4. Post telephone numbers of nearest hospital, ambulance service or flight for life, and fire station in conspicuous location. Advise all workers of location of telephone numbers.

1.15 ENVIRONMENTAL PROTECTION

A. The Contractor shall abate and control all environmental pollution arising from construction activities by complying with all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement, as well as the specified requirements in this contract. Compliance with this requirement by subcontractors will be the responsibility of the Contractor.

B. Fossils and Artifacts

1. Should the Contractor discover any fossils or artifacts during construction operations, such objects shall become the property of the Government. The Contractor shall cease construction operations in the area of the "find," and immediately notify the station manager of such discovery. Construction operations may proceed in other areas not affected by this clause. Care shall be exercised by the Contractor not to damage fossils or artifacts uncovered during excavation operations.

2. Failure to comply with this requirement may be considered a violation of the Archeological Resources Protection Act of 1979 as amended. Destruction of historic and prehistoric sites and/or unauthorized collection of cultural materials can result in criminal and/or civil penalties. Penalties can include fines, prison sentences, and/or confiscation of equipment.

3. If the Contractor uses fill from a nongovernmental source to perform work that is required under this project, and a new borrow site is opened or an existing borrow area is expanded in order to obtain such materials, the Contractor shall assure that any new borrow area disturbance meet the requirements of Section 106 of the National Historic Preservation Act.

C. Abatement of Air Pollution

1. The Contractor shall comply with applicable Federal, State, and local laws and regulations concerning the prevention and control of air pollution.

2. Construction activities shall be performed in such a manner that air pollution will be held to a minimum.

3. Burning of materials, trees and brush, combustible construction materials, and rubbish will not be permitted. Construction debris shall be disposed of at a location designated by the Contracting Officer or hauled off the Station to an approved disposal site.

SUMMARY 011000 - 6

D. Prevention of Water Pollution

1. The Contractor is responsible for implementing the terms and requirements of the (insert state) storm water discharge permit, as issued to the State under the National Pollution Discharge Elimination System (NPDES) by the Environmental Protection Agency (EPA).

The Contractor shall apply for and execute all permits as required by the State of (insert state) regarding storm water discharge from the construction site. The Contractor shall submit to the Contracting Officer a copy of all permit applications and a copy of all approvals from the State. Allow the Government 10 days for review of the application package prior to submission.

2. During construction, the Contractor shall comply with all applicable Federal, State, and local laws and regulations concerning the control and abatement of water pollution.

3. The Contractor's construction activities shall be performed by methods that will prevent entrance or accidental spillage of solid matter, contaminants, debris, and other objectionable pollutants and wastes into streams, flowing or dry water-courses, lakes, ponds, and underground water sources. The Contractor shall dispose of all pollutants such as petroleum products, rubbish, cement, concrete, etc., and objectionable material at a jurisdictionally accepted waste management facility.

4. Sanitary facilities, such as chemical toilets shall be located far enough from wells, live streams, or ponds to prevent pollution of the water.

5. Dewatering work for structure foundations or earthwork operations adjacent to or encroaching on streams or watercourses shall be conducted in a manner that prevents muddy water and eroded materials from entering streams or watercourses. This shall be accomplished by construction of intercepting ditches, bypass channels, barriers, settling ponds, or other approved means. Excavated material shall not be placed in or adjacent to watercourses where it can be washed away by high water or storm runoff.

E. Prevention of site contamination

1. The purpose of this section is to prevent invasive species from being introduced to the project work sites. This includes both plant and animal species. Invasive species can have long last detrimental effects at project sites at US Fish and Wildlife Service lands.

2. Prior to entrance to the work site, all equipment brought on site will be thorough-ly washed to remove dirt, seeds, and plant parts. Any equipment that has been any body of water within the past 30 days will be thoroughly cleaned with hot water greater than 140 degree F (typically the temperature found at commercial truck washes) and dried for a minimum of five days before being used at this pro-ject site. In addition, before transporting equipment from the project site all visi-ble mud, plants and fish/animals will be removed, all water will be eliminated, and the equipment will be thoroughly cleaned. Anything that came in contact with water will be cleaned and dried following the above procedure.

F. Environmental Litigation: Time lost due to work stoppage because of failure of the Contractor to comply with these requirements may not be the subject of a claim for extension of time, for additional costs, or damages.

END OF SECTION 011000

SUBSTITUTION PROCEDURES 012500 - 1

SECTION 012500 - SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

B. Related Requirements:

1. Section 016000 "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.

1.2 DEFINITIONS

A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.

1.3 ACTION SUBMITTALS

A. Substitution Requests: Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Substitution Request Form: Use CSI Form 13.1A

2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Statement indicating why specified product or fabrication, or installation cannot be provided, if applicable.

b. Coordination information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors, that will be necessary to accommodate proposed substitution.

c. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Include annotated copy of applicable Specification Section.

Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified.

d. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

e. Samples, where applicable or requested.

f. Certificates and qualification data, where applicable or requested.

g. List of similar installations for completed projects with project names and addresses and names and addresses of architects and owners.

h. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.

SUBSTITUTION PROCEDURES 012500 - 2

i. Research reports evidencing compliance with building code in effect for Project, from the applicable code organization.

j. Detailed comparison of Contractor's construction schedule using proposed substitution with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery.

k. Cost information, including a proposal of change, if any, in the Contract Sum.

l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.

m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

3. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within 7 days of receipt of a request for substitution.

Architect will notify Contractor through Construction Manager of acceptance or rejection of proposed substitution within 15 days of receipt of request, or 7 days of receipt of additional information or documentation, whichever is later.

a. Forms of Acceptance: Change Order, Construction Change Directive, or Architect's Supplemental Instructions for minor changes in the Work.

b. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.

1.4 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.

PART 2 - PRODUCTS

2.1 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.

1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Requested substitution provides sustainable design characteristics that specified product provided

SUBSTITUTION PROCEDURES 012500 - 3

c. Requested substitution will not adversely affect Contractor's construction schedule.

d. Requested substitution has received necessary approvals of authorities having jurisdiction.

e. Requested substitution is compatible with other portions of the Work.

f. Requested substitution has been coordinated with other portions of the Work.

g. Requested substitution provides specified warranty.

h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

B. Substitutions for Convenience: Not allowed unless otherwise indicated.

C. Substitutions for Convenience: Architect will consider requests for substitution if received within 60 days after the Notice to Proceed

1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied:

a. Requested substitution offers Owner a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Owner must assume. Owner's additional responsibilities may include compensation to Architect for redesign and evaluation services, increased cost of other construction by Owner, and similar considerations.

b. Requested substitution does not require extensive revisions to the Contract Documents.

c. Requested substitution is consistent with the Contract Documents and will produce indicated results.

d. Requested substitution provides sustainable design characteristics that specified product provided

e. Requested substitution will not adversely affect Contractor's construction schedule.

f. Requested substitution has received necessary approvals of authorities having jurisdiction.

g. Requested substitution is compatible with other portions of the Work.

h. Requested substitution has been coordinated with other portions of the Work.

i. Requested substitution provides specified warranty.

j. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

PART 3 - EXECUTION (Not Used)

END OF SECTION 012500

PAYMENT PROCEDURES 012900 - 1

SECTION 012900 – PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.

1.2 SCHEDULE OF VALUES

A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.

1. Submit the schedule of values to Contracting Officer at earliest possible date but no later than seven days before the date scheduled for submittal of initial Applications for Payment.

1.3 APPLICATIONS FOR PAYMENT

A. Each Application for Payment shall be consistent with previous applications and payments as certified by Contracting Officer.

B. Payment Application Times: The date for each progress payment is indicated in the Agreement between Government and Contractor.

C. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:

1. Schedule of values.

2. Contractor's construction schedule (preliminary if not final).

3. Submittal schedule (preliminary if not final).

D. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:

1. Evidence of completion of Project closeout requirements.

2. Written guarantees, warranties, and certificates.

3. Record (As-Built) Drawings

4. All test reports.

END OF SECTION 012900

PROJECT MANAGEMENT AND COORDINATION 013100 - 1

SECTION 013100 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Coordination drawings.

2. Requests for Information (RFIs).

3. Project meetings.

1.2 DEFINITIONS

A. RFI: Request from Government, Owner, Construction Manager, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.

1.3 INFORMATIONAL SUBMITTALS

A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:

1. Name, address, and telephone number of entity performing subcontract or supplying products.

2. Number and title of related Specification Section(s) covered by subcontract.

3. Drawing number and detail references, as appropriate, covered by subcontract.

1.4 GENERAL COORDINATION PROCEDURES

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Provide a construction schedule noting demolition activities, construction activities, deliveries, payments, etc., as needed to convey coordination information to the Contacting Officer, Contacting Officer’s Technical Representative (COTR), Government Inspector as well as local staff.

2. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

PROJECT MANAGEMENT AND COORDINATION 013100 - 2

3. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.

4. Make adequate provisions to accommodate items scheduled for later installation.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities as well as any activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's construction schedule.

2. Preparation of the Schedule of Values (SOV).

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Pre-installation conferences.

7. Project closeout activities.

8. Startup and adjustment of systems.

1.5 COORDINATION DRAWINGS

A. Coordination Drawings, General: Prepare coordination drawings according to requirements in individual Sections, where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.

1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:

a. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.

b. Indicate dimensions shown on the Drawings. Specifically note dimensions that appear to be in conflict with submitted equipment and minimum clearance requirements. Provide alternate sketches to Architect indicating proposed resolution of such conflicts. Minor dimension changes and difficult installations will not be considered changes to the Contract.

B. Coordination Drawing Organization: Organize coordination drawings as follows:

1. Floor Plans and Reflected Ceiling Plans: Show architectural and structural elements, and mechanical, plumbing, fire-protection, fire-alarm, and electrical Work. Show locations of visible ceiling-mounted devices relative to an acoustical ceiling grid.

PROJECT MANAGEMENT AND COORDINATION 013100 - 3

2. Plenum Space: Indicate subframing for support of ceiling and wall systems, mechanical and electrical equipment, and related Work. Locate components within ceiling plenum to accommodate layout of light fixtures indicated on Drawings.

3. Mechanical Rooms: Provide coordination drawings for mechanical rooms showing plans and elevations of mechanical, plumbing, fire-protection, fire-alarm, and electrical equipment, etc.

4. Structural Penetrations: Indicate penetrations and openings required for all disciplines.

5. Slab Edge and Embedded Items: Indicate slab edge locations and sizes and locations of embedded items for metal fabrications, sleeves, anchor bolts, bearing plates, angles, door floor closers, slab depressions for floor finishes, curbs and housekeeping pads, and similar items.

6. Review: The Government will review coordination drawings to confirm that the Work is being coordinated, but not for the details of the coordination, which are Contractor's responsibility.

1.6 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.

1. The Government will return RFIs as submitted to the Government by other entities controlled by Contractor with no response. RFI’s must come directly from the Contractor.

2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. Project name.

2. Project number.

3. Date.

4. Name of Contractor.

5. RFI number, numbered sequentially.

6. RFI subject.

7. Specification Section number and title and related paragraphs, as appropriate.

8. Drawing number and detail references, as appropriate.

9. Field dimensions and conditions, as appropriate.

10. Contractor's suggested resolution. If Contractor's solution(s) have an impact the Contract

Time or the Contract Sum, Contractor shall state impact in the RFI.

11. Contractor's signature.

12. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

PROJECT MANAGEMENT AND COORDINATION 013100 - 4

C. RFI Forms: AIA Document G716, or Software-generated form with substantially the same content as indicated above, acceptable to the Government.

D. The Governments Action: The Government will review each RFI, determine action required, and respond. Allow seven working days for the Government’s response for each RFI. RFIs received after 1:00 p.m. will be considered as received the following working day.

1. The following RFIs will be returned without action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for coordination information already indicated in the Contract

Documents.

d. Requests for adjustments in the Contract Time or the Contract Sum.

e. Requests for interpretation of Architect's actions on submittals.

f. Incomplete RFIs or inaccurately prepared RFIs.

g. Request For Information submitted by a sub-contractor to the Contractor.

2. The Government’s action may include a request for additional information, in which case the time for response will date from time of receipt of additional information.

3. The Government’s action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal.

a. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Contacting Officer and COR in writing within 10 days of receipt of the RFI response.

E. RFI Log: Prepare, maintain, and submit a tabular log of RFIs organized by the RFI number.

Submit log weekly with not less than the following information:

1. Project name.

2. Name and address of Contractor.

3. Name and address of Contacting Officer and COR.

4. RFI number including RFIs that were dropped and not submitted.

5. RFI description.

6. Date the RFI was submitted.

7. Date the Contacting Officer’s response was received.

F. On receipt of the Government’s action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify the Government within seven days if Contractor disagrees with response.

1. Identification of related Minor Change in the Work, Construction Change Directive, and Proposal Request, as appropriate.

2. Identification of related Field Order, Work Change Directive, and Proposal Request, as appropriate.

PROJECT MANAGEMENT AND COORDINATION 013100 - 5

1.7 PROJECT MEETINGS

A. General: The construction contractor shall coordinate and schedule and conduct weekly construction progress meetings at the Project site unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify the Facility Director, the Contracting officer and the COR of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including the Contracting Officer and the COTR, Construction Manager, and other FWS personnel, within three days of the meeting.

B. Preconstruction Conference: The Contracting Officer will schedule a preconstruction conference before starting construction, at a time convenient to the Contracting Officer, COTR, Facility Director, On-Site Government Inspector and Contractor.

1. Attendees: Authorized representatives of the Contracting Officer, Government Project Manager, Owner's Commissioning Authority, Construction Manager, and their consultants; Contractor and its superintendent; major subcontractors; suppliers; and other concerned parties shall attend the conference. Participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Tentative construction schedule.

b. Phasing.

c. Critical work sequencing and long-lead items.

d. Designation of key personnel and their duties.

e. Procedures for processing field decisions and Change Orders.

f. Procedures for RFIs.

g. Procedures for testing and inspecting.

h. Procedures for processing Applications for Payment.

i. Distribution of the Contract Documents.

j. Submittal procedures.

k. Preparation of record documents.

l. Use of the premises and existing building.

m. Work restrictions.

n. Working hours.

o. Owner's occupancy requirements.

p. Responsibility for temporary facilities and controls.

q. Procedures for moisture and mold control.

r. Procedures for disruptions and shutdowns.

s. Construction waste management and recycling.

t. Parking availability.

u. Office, work, and storage areas.

v. Equipment deliveries and priorities.

w. First aid.

PROJECT MANAGEMENT AND COORDINATION 013100 - 6

x. Security.

y. Progress cleaning.

3. Minutes: The construction contractor shall be responsible for conducting meeting, recording minutes and distributing the meeting minutes.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Installer and representatives of manufacturers and fabricators involved in or affected by the installation and its coordination or integration with other materials and installations that have preceded or will follow, shall attend the meeting. Advise the Government of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Review of mockups.

i. Possible conflicts.

j. Compatibility problems.

k. Time schedules.

l. Weather limitations.

m. Manufacturer's written instructions.

n. Warranty requirements.

o. Compatibility of materials.

p. Acceptability of substrates.

q. Temporary facilities and controls.

r. Space and access limitations.

s. Regulations of authorities having jurisdiction.

t. Testing and inspecting requirements.

u. Installation procedures.

v. Coordination with other work.

w. Required performance results.

x. Protection of adjacent work.

y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

PROJECT MANAGEMENT AND COORDINATION 013100 - 7

5. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

D. Progress Meetings: Conduct weekly construction progress meetings as directed by the Contracting officer and/or the COTR.

1. Attendees: In addition to representatives of the Government, Construction Manager, and COTR (as applicable), each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the meeting shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting.

Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's construction schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

1) Review schedule for next period.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Sequence of operations.

3) Status of submittals.

4) Deliveries.

5) Off-site fabrication.

6) Access.

7) Site utilization.

8) Temporary facilities and controls.

9) Progress cleaning.

10) Quality and work standards.

11) Status of correction of deficient items.

12) Field observations.

13) Status of RFIs.

14) Status of proposal requests.

15) Pending changes.

16) Status of Change Orders.

17) Pending claims and disputes.

18) Documentation of information for payment requests.

3. Minutes: The construction contractor shall be responsible for conducting meeting, recording minutes and distributing the meeting minutes.

PROJECT MANAGEMENT AND COORDINATION 013100 - 8

a. Schedule Updating: Revise the construction schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue revised schedule concurrently with the report of each meeting.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 013100

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 1

SECTION 013200 – CONSTRUCTION PROGRESS DOCUMENTATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for documenting the progress of construction during performance of the Work, including the following:

1. Contractor's construction schedule.

2. Construction schedule updating reports.

3. Daily construction reports.

4. Site condition reports.

1.2 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical Activity: An activity on the critical path that must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

1.3 INFORMATIONAL SUBMITTALS

A. Contractor's Construction Schedule: Initial schedule, of size required to display entire schedule for entire construction period.

1. Submit a working electronic copy of schedule, using software indicated, and labeled to comply with requirements for submittals. Include type of schedule (initial or updated) and date on label.

B. Construction Schedule Updating Reports: Submit with Applications for Payment.

1.4 COORDINATION

A. Coordinate Contractor's construction schedule with the schedule of values, submittal schedule, progress reports, payment requests, and other required schedules and reports.

1. Secure time commitments for performing critical elements of the Work from entities involved.

2. Coordinate each construction activity in the network with other activities and schedule them in proper sequence.

CONSTRUCTION PROGRESS DOCUMENTATION 013200 - 2

PART 2 - PRODUCTS

2.1 CONTRACTOR'S CONSTRUCTION SCHEDULE, GENERAL

A. Time Frame: Extend schedule from date established from the Notice to Proceed to the date of completion.

B. Activities: Treat each story or separate area as a separate numbered activity for each main element of the Work. Comply with the following:

1. Activity Duration

2. Procurement Activities

3. Submittal Review Time

4. Punch List and Final Completion: Include not more than 15 days for completion of punch list items and final completion.

C. Constraints: Include constraints and work restrictions indicated in the Contract Documents and as follows in schedule, and show how the sequence of the Work is affected.

1. Phasing: Arrange list of activities on schedule by phase.

2. Work under More Than One Contract: Include a separate activity for each contract.

3. Work by Owner: Include a separate activity for each portion of the Work performed by

Owner.

4. Work Restrictions: Show the effect of the following items on the schedule:

a. Coordination with existing construction.

b. Limitations of continued occupancies.

c. Uninterruptible services.

d. Partial occupancy before Substantial Completion.

e. Use of premises restrictions.

f. Provisions for future construction.

g. Seasonal variations.

h. Environmental control.

5. Work Stages: Indicate important stages of construction for each major portion of the Work.

6. Other Constraints

D. Milestones: Include milestones indicated in the Contract Documents in schedule, including, but not limited to, the Notice to Proceed, Substantial Completion, and final completion and the following interim milestones.

1. Insert milestones not indicated…