A04_Fort_River_Trail_Tap_Rail_Lumber_SOW.pdf
PDF 116 KB Posted
- Attached to
- MA-FT RIVER DIV OF S. O. CONTE NWR-LUMBER
- Solicitation number
- 140FS326Q0152
About this file
This is a Statement of Work for tap-rail materials delivery to support an accessible trail project at the Silvio O. Conte National Wildlife Refuge's Fort River Division in Hadley, Massachusetts.
The contractor must deliver 800 units of black molded lumber (recycled plastic) with nominal dimensions of 5/4" x 8" to the delivery site at 69 Moody Bridge Road, Hadley, MA 01035. The material must meet ADA accessibility standards and withstand constant ground contact throughout its full life cycle, outlasting standard pressure- or salt-treated lumber. Delivery is required between September and October 2026 and will be coordinated with Refuge staff, with Patrick Moffett serving as the primary point of contact. The delivery location must be approved by the Refuge Manager/Project Leader, and materials should arrive during general refuge operating hours of 7 AM to 5 PM, Monday through Friday. Delivery tickets must be provided for each material type delivered, indicating the sign type and quantity, and signed by the on-site Government representative. Potential suppliers should contact Patrick Moffett at 435-695-3166 or Patrick_Moffett@fws.gov for additional information or site-specific requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140FS326Q0152_Amd_0001.pdf | ||
| A04_Fort_River_Trail_Tap_Rail_Lumber_SOW_0001.pdf | ||
| Past_Performance_Survey.pdf | ||
| B03_Wage_Determination.pdf | ||
| Sol_140FS326Q0152.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
TAP-RAIL MATERIALS DELIVERY
FOR
SILVIO O. CONTE NATIONAL WILDLIFE REFUGE -
PART A – GENERAL INFORMATION AND INSTRUCTIONS
GENERAL DESCRIPTION: Provide tap-rail lumber material for the accessible trail at the Fort River Division of Silvio O. Conte National Wildlife Refuge. The materials will be delivered per Refuge facility schedule.
PART B – PERFORMANCE REQUIREMENTS
Delivery Site:
69 Moody Bridge Road Hadley, MA 01035
Materials requirements list:
Tap-Rail Lumber
800 units of black molded lumber (recycled plastic), nominal 5/4” x 8”. This material outlasts standard pressure- or salt-treated lumber and can withstand constant ground contact for its full life cycle.
The tap-rail material at the 8” width will meet ADA accessibility standards and achieves the Refuge’s commitment to providing an accessible trail for visitors. .
Material will be delivered to an area approved by the Refuge Manager/Project Leader. The materials will be required around September to October 2026.
Delivery will be coordinated by Refuge staff with Patrick Moffett as the primary POC. General refuge hours are 7AM – 5PM Monday – Friday.
PART C – OTHER PERFORMANCE REQUIREMENTS AND INFORMATION
DELIVERY TICKETS:
For each type of material delivered, delivery tickets shall be provided to the on-site Government representative, who will sign the delivery ticket and keep a copy for Government records. The delivery ticket shall indicate the sign type and quantity delivered for each type of sign.
CONTACT INFORMATION: Possible suppliers are encouraged to contact Patrick Moffett; telephone 435-695-3166, Patrick_Moffett@fws.gov for additional information or site specific requirements.
mailto:Patrick_Moffett@fws.gov
File details come from the government source that posted it. Updated .