A04_FIIS_Barge_Scope_of_Work.pdf

PDF 6 MB Posted

Attached to
FIIS - REHABILITATE BARGE
Solicitation number
140P4521Q0030
Issued by

View the file

Other files

File Type Posted
Sol_140P4521Q0030_Amd_0001.pdf PDF
B03_WD_2015-4157_4-13-21.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Sol_140P4521Q0030.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rehabilitate 20’ x 60’ Flat Bottom Barge (Seahorse)

Fire Island National Seashore 166 West Ave, Patchogue, NY 11772

1.0 Background

2.0 Scope

3.0 Objectives

4.0 Tasks

5.0 Delivery

6.0 Government-Furnished Property

7.0 Security

8.0 Place of Performance

9.0 Period of Performance

10.0 Safety

11.0 Environmental Protection

1.0 Background

Fire Island National Seashore (FINS) owns and operates a 20’x60’ shallow draft steel barge in the Great South Bay to transport vehicles, equipment, and supplies between Fire Island back and forth across the Great South Bay to support operations. The barge was built in 1994 and requires the repair of deferred cyclic maintenance. The steel barge requires replacement of specific areas of plating, removal of paint to the substrate in other areas, as well as rust removal prior to painting in remaining areas. The bilge area will require rust removal followed by priming and painting. New deck hatches, mooring bits, navigation light post, and access platform to the wheelhouse will also need to be removed and installed to replace worn out steel. The vessel will need to be hauled and blocked out of the water to complete the work. FINS will deliver the vessel to the offeror as applicable.

2.0 Scope

• Haul and block 20’x60’ vessel. Vessel has a flat bottom with a 4’ of freeboard and 16” keel.

• The National Park Service (Fire Island) will remove all electronics prior to commencement of work. Existing wiring to remain.

• Side Shell-Provide bare metal substrate, prime with Intergard 269 or equal and paint with White Intershield 852 or equal which consists of areas measuring; Port side 4’x60’, Starboard 4’x60’, Stern 4’x20’, Bow is a semi-V shape with an area approximately 5’x24’. Paint scheme to change to Black Intershield 852 or equal at water line on side shell.

• Deck area-Provide bare metal substrate, prime with Intergard 269 or equal, and paint with Grey Intershield 852 or equal of entire deck area and engine vents.

• Wheelhouse superstructure (exterior)-Provide bare metal substrate, prime with Intergard 269 or equal, and paint with White Intershield 852 or equal of exterior wheelhouse area, platform, uprights, and roof.

• Wheelhouse superstructure (interior)-Remove rust and/or oxidation in the interior of the wheelhouse superstructure followed by Ospho or equal treatment to retard rust in treated areas. Prime with Intergard 269 or equal and paint with White Intershield 852 or equal.

• Interior void (engine room, collision void, midship compartment)-Remove rust and/or oxidation in interior void followed by Ospho or equal treatment to retard rust in treated areas. Prime with Intergard 269 or equal and paint with Grey Intershield 852 or equal on interior of entire void, including, but not limited to; bottom, sides, top, bulkheads, and structural channel steel. Void consists of 3 compartments that include, a collision bulkhead, mid compartment, and engine room which are separated by vertical steel bulkheads and accessed by deck hatches or engine hatches.

• Vessel bottom-Complete power wash of bottom, including up to waterline followed by 1 coat of Intergard 269 primer followed by 1 coat of black Interspeed 640 or equal paint. Bottom measures approximately 20’x60’ with a longitudinal keel 12”x16”x45’.

Items to be replaced and renewed-

• Crop and renew main deck with 3/8” steel plate in the following specific areas-o Port side-from bow 47’2” back 4’ wide to include new steel rubrail (see diagram below) o Starboard side-from bow 47’2” back 4’ wide to include new steel rubrail (see diagram below) o Midship main aft between pilot house and previously installed 3/8” steel plate (see diagram below) o As part of the deck removal, adjacent horizontal rub rails to be removed and replaced with 4” tube steel cut down the middle to create a half moon rub rail. Prime with Intergard 269 or equal and paint with White Intershield 852 or equal.

o As part of the deck removal, remove 6 of the 10 midship mooring posts and install new. Posts are 6” outside diameter with 1” solid perpendicular posts. Use existing bow and stern mooring posts as template. Prime with Intergard 269 or equal and paint with Black Intershield 852 or equal.

• Crop and renew front face of pilot house measuring 6’1”x5’ (see diagram below)

• Remove and replace wheelhouse roof with ¼” steel plate. Prime with Intergard 269 or equal and paint with White Intershield 852 or equal. (12’x13’-see photo below). Provide mounting and access on cabin roof for government furnished equipment, to include; 2 antennas, 1 radar, 1 spotlight, and 1 horn.

• Remove and fabricate new light mast. Prime with Intergard 269 or equal and paint with White Intershield 852 or equal. See photo below)

• Remove existing navigation lights and install new LED light package in accordance with U.S. Coast Guard navigational rules, international/inland.

• Remove and replace 2 engine hatch covers with raised coaming ¼” steel plate 3’10”x5’2”. Engine covers to have mechanism to keep hatch open as needed. Prime with Intergard 269 or equal and paint with Black Intershield 852 or equal.

• Remove and replace aft wheelhouse platform with ¼” steel plate 3’x7’9” along with pipe railing around deck. Prime with Intergard 269 or equal and paint with Black Intershield 852 or equal.

• Install new internal longitudinal #2 3” x ¼” flat bar (34’) in bilge compartment for rigidity. Prime with Intergard 269 or equal and paint with Grey Intershield 852 or equal.

• Remove plywood material inside engine room between transom assembly and outdrives and fabricate steel plate housing to be perpendicular to assembly to allow for a better transition between systems. (see photo below) Prime with Intergard 269 or equal and paint with Grey Intershield 852 or equal.

• Remove and replace all anodes inkind.

• All primer and paint shall be applied as per manufacturers specifications.

The offeror shall request approval of the National Park Service, Fire Island project manager prior if they seek to facilitate work by removing engines, tanks, assemblies, pumps, piping, etc.

3.0 Objectives

• To rehabilitate a 20’x60’ shallow draft steel barge by performing specific replacement of steel components along with renewing the paint on the entire vessel.

4.0 Task

• Haul and block vessel to perform the work.

• Remove specified steel plating and replace with new on cargo deck and superstructure.

• Remove paint to substrate, prime and paint in areas as specified in scope.

• Remove rust, seal, prime and paint in areas specified in scope.

• Remove, fabricate, prime, and paint hatch covers, engine covers, and deck platform as specified in scope.

• Launch vessel for return to the National Park Service

Photo for scale only taken in 2007. Current conditions vary.

Photo taken May 26, 2021

20’x60’ steel barge. 4’ freeboard. Pilot house is 14’ high.

Photo taken May 26, 2021

Wheelhouse measurements

12’

6’

8’

9’

7’

Crop and renew highlighted area with 3/8” steel plate inclusive of rub rail.

47’2” x4’ 12’2”x15’ 47’2”x4’

Rest of deck plate to remain. Provide bare metal substrate and prime/paint top deck to match renewed areas.

Remove and replace 2 raised coaming hatch covers that provide access to below deck. Hatch covers are 2’2”x2’10”x2”.

Remove and replace 6 out of 10 mooring bits (midship-3 port/3 starboard)

Remove and renew with ¼” steel plate portion of front face of pilot house (6’1”x5’)

Remove rust and Ospho or equal treated areas prior to paint (Typical)

Remove and renew with ¼” steel plate roof of pilot house (12’x13’)

Remove and replace navigation light post

Remove and replace platform (3’x7’9”) and railing

Remove and replace engine hatch covers with raised coaming (5’2”x3’10”)

Remove grey plywood and install steel plate to be perpendicular to transom assembly (2 engines). Paint as described.

5.0 Delivery

• N/A

6.0 Government Furnished Property

• 2 antennas, 1 radar, 1 spotlight, and 1 horn for on wheelhouse roof.

7.0 Security

• N/A

8.0 Place of Performance

• Contractor’s Facility

• Vessel work to be performed with the area of the south shore of Long Island, NY or in a location that the vessel can be transported via water from the south shore of Long Island, NY by Fire Island National Seashore.

9.0 Period of Performance

• Pre-Construction meeting will be held within 4 weeks of contract award.

• Notice to Proceed will be provided to contractor after preconstruction meeting within a timeframe to allow the contractor to submit their schedule.

• Work shall be completed within 120 calendar days.

10.0 Safety

• All work should comply with standards set forth by the Occupational Safety and Health Administration (OSHA) and the National Institute for Occupational Safety and Health (NIOSH).

11.0 Environment Protection

• Contractor shall provide and maintain environmental protection during the life of the Contract to control pollution or to correct conditions that develop during construction.