This Draft Statement of Work (SOW) outlines a contract for the National Park Service (NPS) Northeast Region to develop White-tailed Deer Management Plans and Environmental Assessments (Plans/EAs) for up to five parks. The project aims to address overabundant deer populations that are causing significant ecological damage, including forest regeneration challenges and impacts on native vegetation, wildlife, and cultural landscapes. The contract will involve comprehensive environmental planning services, including pre-NEPA project planning, civic engagement, alternatives development, impact analysis, and preparation of Environmental Assessments and Finding of No Significant Impact (FONSI) documents.
The project is scheduled to begin in October 2025, with staggered 4-month intervals between park initiations, and is expected to be completed by August 2028. Key deliverables include stakeholder involvement plans, public meetings, comment analysis, draft and final Environmental Assessments, and decision files for each park. The contract will be executed on a firm-fixed-price basis, with the specific pricing to be determined. The NPS will conduct the work in compliance with various environmental regulations, including NEPA, Endangered Species Act, National Historic Preservation Act, and other relevant federal guidelines. The ultimate goal is to develop adaptive management strategies that support protection and restoration of natural resources in the affected national parks.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SAM_Sources_Sought_Worksheet_1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
TASK ORDER NO. xxxxxx 6/2/2025 Northeast Region White-Tailed Deer Management Plans/Environmental Assessments Preliminary Project Planning and Environmental Compliance
CONFIDENTIALITY
The information developed under this task order is the property of the U.S. government and shall be kept in strict confidence.
PERFORMANCE PERIOD
The work shall begin following issuance of the task order, proceed in accordance with the schedule for submittals, and be completed no later than August 2028.
PROJECT IDENTIFICATION
PMIS Titles and Associated Numbers:
Develop deer management plans for multiple northeastern parks: PMIS 349855
PEPC Number:
TBD
POINTS OF CONTACT
Northeast Region POCs:
· Project Manager/COR: Brian Mitchell, 401-318-5165, brian_mitchell@nps.gov
· Wildlife Biologist: Zach Ladin, zachary_ladin@nps.gov
· Regional Compliance Specialist: Christine Yott, 267-822-1878, christine_yott@nps.gov
· Contracting Officer: TBD
· Contracting Specialist: TBD
Park POCs:
Natural Resource Manager (GATE): Brady Simmons, brady_simmons@nps.gov Ecologist/IPM Manager (HOFU): Kate Jensen, 610-783-1035, kate_jensen@nps.gov Biologist (HOFU): Marta Lefevre-Levy, 610-783-1059, marta_lefevre-levy@nps.gov Chief, Planning & Resource Management (HOFU): Amy Ruhe, 610-783-1036, amy_ruhe@nps.gov Resource Manager (RICH): Kristen Allen, 804-640-7919, kristen_allen@nps.gov Superintendent (SARA): Leslie Morlock, 518-670-2940, leslie_morlock@nps.gov Integrated Resource Manager (SARA): Ranna Wells, joanna_wells@nps.gov Natural Resource Program Manager (FRSP): Sara Strickland, sara_strickland@nps.gov
BACKGROUND/PROJECT DESCRIPTION
The purpose of this contract is to prepare up to five (5) White-tailed Deer Management Plans / Environmental Assessments (Plans/EAs), for parks in the Northeast Region of the National Park Service. This work is currently subject to availability of funds; if less funding than anticipated is confirmed, the project will support fewer parks.
White-tailed deer (Odocoileus virginianus) densities have increased dramatically in the eastern seaboard states over the past century. Decreased regeneration caused by overbrowsing results in forests unable to replace themselves and persist as forests. The browsing pressure created by deer, in combination with other climate change exacerbated stressors – invasive plants, pests, pathogens, and increased storm severity and frequency – has driven eastern forests to such a degraded condition that many are one disturbance away from total loss (Miller et al. 2023). This loss is often not noticed until canopy trees die and are not replaced. At that point management action is difficult, costly, and it takes decades for forests to recover. Deer browsing also impacts the cultural landscapes within the parks by changing vegetation patterns and historic character. Deer overabundance affects visitor experience by altering the habitat of other species. The primary safety issue for visitors and local residents involves injuries from deer-vehicle collisions. Deer-related diseases may also pose health risks to park visitors or area residents. Black-legged ticks (Ixodes scapularis), also known commonly as deer ticks, are vectors for Lyme disease, with deer and rodents as preferred hosts.
Historically, deer densities at or below 15 deer per square mile allow forest regeneration to occur naturally (McCabe and McCabe 1997). In the absence of management, densities in parks can exceed 150 deer per square mile, resulting in regeneration debt (Miller et al. 2023), where tree regeneration quantity and composition is inadequate and will result in future forest loss. In eleven parks in the National Park Service (NPS) Northeast Region (NER) and National Capital Region (NCR) that have managed deer for up to three decades, data show that as deer densities decrease, canopy tree seedlings increase in number, size, and diversity (Schmit et al. 2020); and herbaceous plants that are intolerant to heavy browse re-emerge and establish healthy populations (McGarvey et al. 2013). Significantly, Gettysburg National Military Park has managed deer for nearly 30 years and has the highest regeneration rates in eastern national park units (Miller et al. 2023).
Deer management is a multi-regional priority for the NPS. The NER established a deer management strategy in 2021 (NPS 2021) and identified those park units most urgently in need of management action based on forest regeneration metrics (Miller et al. 2023). Action is needed to address overabundant deer impacts in these park units to ensure that natural processes support native vegetation, wildlife, and the cultural/historic landscape. This contract will develop white-tailed deer management plans/EAs for up to five (5) parks in the Northeast Region of the National Park Service. Each Plan/EA will assess alternatives and establish a deer management strategy that supports protection, recovery, and restoration of native vegetation and other natural and cultural resources through adaptive management.
TASK ORDER OBJECTIVES
Preliminary internal scoping identified an EA to be the appropriate NEPA compliance pathway and is the level of analysis for this scope of work. However, this proposed NEPA compliance pathway will need to be approved by the NPS Regional Director for Region 1.
The objectives for the project include engaging in preliminary (pre-NEPA) project planning and early outreach and using initial information to complete a NEPA impact analysis for each park. The tasks shall include the following:
· completing pre-NEPA environmental planning services, including civic engagement, information collection, and preliminary alternatives development and impact analysis;
· preparing an EA for internal and public review;
· providing supporting documentation for compliance with the National Historic Preservation Act (NHPA), Endangered Species Act (ESA), Clean Water Act (CWA), and other related laws and regulations;
· preparing a NEPA decision document (Finding of No Significant Impact [FONSI] anticipated); and
· preparing decision documents and compiling the decision file for each project.
Subsequent project tasks may be awarded to the Contractor as future contract modifications.
PROJECT INITIATION SCHEDULE FOR PARKS
Initiation of project activities under this statement of work shall begin in October 2025 at the first park and subsequent project activities for each additional park will start at 4-month intervals after that.
SERVICES TO BE COMPLETED
This statement of work defines information requirements, products, and services to be produced by the Contractor. Also included in this statement of work are communication and coordination activities such as conference calls and meetings with NPS staff.
The Contractor shall review relevant source materials to develop a clear understanding of each project area, proposed project, and associated issues. Data gaps shall be identified and brought to the attention of the COR as soon as they are identified.
The Contractor shall provide all manpower, equipment, and services to perform the tasks necessary. All work shall be technically and legally defensible and in compliance with the requirements of the NEPA; the Council on Environmental Quality Regulations (40 CFR 1500-1508); the Department of the Interior NEPA Regulations (43 CFR Subtitle A Part 46); Director’s Order-12 Conservation Planning, Environmental Impact Analysis, and Decision-Making, and its NEPA Handbook (collectively, DO-12); and other applicable laws, policies, and regulations such as Department of Interior and NPS regional guidance regarding NEPA streamlining. Other principal applicable laws include but are not limited to the following: the NHPA, ESA, CWA, Wild and Scenic Rivers Act (WSRA), Migratory Bird Treaty Act (MBTA), and Clean Air Act (CAA).
The Contractor shall use only scientific information that meets the information quality standards in NPS Director’s Order 11-B and shall base any impact assessment and resulting conclusions on published and/or peer-reviewed scientific literature, when available.
The NPS will conduct consultations with other agencies, organizations, and federally recognized tribes in accordance with the requirements of the NEPA, ESA, NHPA, and/or other applicable laws. The Contractor shall use information provided by the NPS regarding compliance with these laws as well as information from other agencies (e.g., State Historic Preservation Officer consultation materials, state natural resource management agencies, and state natural heritage inventories) for inclusion and analysis in the compliance documentation.
NOTES ON DELIVERABLES:
· All deliverables must be fully edited, free of spelling and grammatical errors, and user-friendly for public review and understanding, formatted consistent with the Denver Service Center Editorial Style Guide (https://www.nps.gov/orgs/1804/upload/DSC_EditingStyleGuide_2014_AF.pdf) and 40 CFR §1502.8 (plain language).
· The Contractor’s name shall not appear on the cover and/or coversheet of any draft or final products.
· The Contractor shall perform a consistency check of all data and facts used throughout all deliverable products.
· The Contractor shall coordinate closely with the COR and other NPS staff (e.g., NER and park staff) while developing all draft project deliverables.
· All internal draft deliverables shall be line-numbered and include a comment matrix or use ‘track changes’ to facilitate and track resolution of NPS comments.
· All print media that will be made publicly available shall be checked and formatted to be Section 508 compliant and must meet NPS Graphic Identity Standards.
· Digital media products shall be Section 508 compliant and compatible with nps.gov (coordination with the NPS will be necessary to ensure compatibility).
· Unless specifically stated, the Contractor shall submit deliverables to the COR in an electronic format.
· GIS products shall be delivered in a format compatible with the June 2019 GRSM Data Delivery Standards and Specifications Template.
· As appropriate, the COR will complete a Quality Assurance review to verify that each deliverable is complete, meets contract requirements and meets professional standards. Within seven (7) calendar days of receipt of a draft deliverable, the COR will notify the Contractor of any substantive corrections needed before it can be accepted and distributed to the Project Team for review. The Contractor shall then correct the document and resubmit the draft to the COR within seven (7) calendar days of receiving notification. Once approved by the COR, the Contractor shall distribute each draft deliverable to the Project Team for review and comment.
· When timeframes are specified in the statement of work, they are given in working days, not calendar days.
· All hardcopy documents shall be prepared on standard 8-1/2” x 11” paper. Pages larger than this may be used with prior approval from the COR.
· Graphics and illustrations (e.g., covers, figures, photographs, graphs, charts) shall be rendered in black and white to facilitate 508-compliance. Graphics and illustrations submitted in other than black and white may be used with prior approval from the COR.
· The Contractor shall use the NPS Planning, Environment, and Public Comment (PEPC) website for each project. The NPS will provide a web link for the computer-based PEPC training and any required role-based privacy training, which will enable the Contractor to learn how PEPC is used for document sharing and posting, as well as internal and external scoping and comment/response documentation. To be assigned a PEPC user profile and access password for a project the Contractor-specified personnel must have completed the computer-based training.
Data and Materials to be Provided by the Government The following items are examples of the material that shall be provided by the government at the request of the Contractor for their use in completing the services specified:
· Park Foundation and General Management Plan documents, as available/applicable
· Recent example EA and FONSI prepared for parks, within NPS region, or pertaining to forest regeneration servicewide
· Copies of or access to GIS and resource / visitor use specific data and surveys for the project areas
· Vegetation and deer monitoring data and reports
PART 1. Pre-NEPA Project Planning The purpose of Pre-NEPA, or preliminary project planning, is to ensure assembly of all key information needed to meaningfully analyze project effects prior to embarking on a formal NEPA process, so that NEPA documents can be prepared effectively, using an efficient and streamlined process. For each park, Pre-NEPA project planning shall include the following:
· Develop and maintain a defined schedule for completion of the tasks in this scope of work, incorporating essential project milestones that affect compliance;
· Review/refine proposed action and no action alternative;
· Review/refine preliminary purpose and need statements;
· Review/refine list of significant/relevant environmental issues which may need to be analyzed;
· Review/identify any new relevant legal and policy issues in considering action;
· Identify data gaps which could affect the efficiency of NEPA reviews and the appropriate NEPA pathway;
· Review existing vegetation and deer data and reports to identify additional needs;
· Develop agency and stakeholder involvement strategies;
· Develop civic engagement materials and provide other civic engagement support; and
· Ensure the project is ready to begin a NEPA process after pre-NEPA activities and prior to initiating work on an EA, including developing the preliminary affected environment and preliminary impact analysis.
Task 1: Pre-NEPA Kick-Off Call Within one month of the task order issuance, the Contractor will facilitate a project kick-off conference call for the first park, and hold subsequent project kick-off calls for each of the other parks on the staggered 4-month schedule (one one-hour call per park). The Contractor shall include two key personnel on each kick-off conference call; representatives of NER and each of the parks will also participate. The primary purpose of these conference calls will be to introduce team members, discuss roles, responsibilities, and communication protocols, identify dates for the preliminary project planning workshop in Subtask 3-B, review project schedule, and determine the appropriate method for transmitting existing information to the Contractor. Existing information will be transmitted as quickly as possible and will be reviewed by the Contractor prior to the preliminary project planning workshop. By the end of the kick-off calls, the Contractor is expected to have enough information to develop a robust project schedule for each park based on the contract scope and high-level schedule provided by NPS. The Contractor shall prepare the agenda for this meeting and provide written meeting notes to NPS following the meeting.
The Contractor shall be prepared to discuss and obtain information from the NPS related to the following topics for each park:
· Reviewing the existing data and documentation related to the project. The Contractor shall conduct a thorough review of these documents and evaluate strengths, weaknesses, and data gaps related to environmental analysis needed.
· Reviewing potential environmental issues and impact topics that may be retained for analysis in future NEPA documentation. Potential topics include but are not limited to the following: water resources, biological resources including species of concern, exotic and native plant impacts, archeological resources, and visitor use/experience. These issues should be succinctly defined and focused.
· Reviewing the proposed action (i.e., the initial NPS proposal for taking action) and potential preliminary alternatives to the action as well as alternatives dismissed.
· Reviewing the purpose and need for taking action.
· Reviewing the scope of the project, project area, and area of potential effects.
· Identifying key stakeholders, tribes, and/or cooperating agencies—their position on relevant planning or environmental issues and strategies for engaging them in the planning process.
· Identifying constraints and commitments of previous planning documents, agreements, etc.
The Contractor shall prepare meeting notes in summary form and not a meeting transcription. The summary shall document the discussion and decisions related to each agenda topic. When the Contractor provides the meeting notes, the related information that was prepared for the meeting (background data, proposed action, preliminary alternatives, environmental issues, stakeholders, etc.) shall also be included. The notes shall be submitted to the COR within 10 working days after the meeting. The Contractor shall assume one revision of the notes, assuming the first draft is of acceptable quality to the COR. The Contractor shall make revisions to the meeting notes and associated materials and provide the COR with the final notes.
Deliverables:
· Meeting agendas for each park
· Draft and final meeting notes for each park
Task 2: Project Schedule The Contractor shall develop and maintain a detailed project schedule for each park. The initial draft for the first park shall be submitted to the COR no later than three (3) weeks after contract award, and then subsequent project schedules for each park will be submitted 3 weeks after the start of project activities at a park according to the 4-month staggered start schedule. Each detailed project schedule shall include the deliverables as identified in the scope of work, review period for NPS (at least 2 weeks for more complex deliverables), and other important milestones as identified in this scope of work. The Contractor will make the necessary changes to each draft schedule to produce and submit a final schedule to the COR within four (4) weeks after the contract award or staggered start date of each park. The Contractor shall be responsible for updating the schedule on a monthly basis, to reflect changes to the overall project schedule. A Gantt chart format, such as Microsoft Project, is preferable.
Deliverables:
· The initial detailed project schedules (in MSProject or similar) shall be submitted to the COR within three (3) weeks after the contract award for the first park and then 3 weeks after the staggered start date for each of the other parks.
· The final schedule for the first park is due four (4) weeks after the contract award and then 4 weeks after the staggered start date of each of the other parks and shall be updated on a monthly basis.
Task 3: Preliminary (Pre-NEPA) Project Planning Workshop Subtask 3-A Workshop Preparation Call The Contractor shall provide two key personnel for one conference call approximately one week after each park’s kick-off call with the project team to prepare for each park’s respective workshop. The Contractor shall prepare all meeting materials necessary to facilitate each workshop including, but not limited to, the agenda, sign-in sheets, maps, and PowerPoint presentation. The Contractor shall also have a draft of the purpose and need, proposed action, and very high-level alternatives or questions for consideration in determining the range of alternatives written out for review, as well as a list of impact topics and potential environmental issues.
At each Workshop, the Contractor shall be prepared to facilitate discussions of the following topics:
· Reviewing applicable background materials to help understand existing issues, conditions, and challenges. The Contractor shall conduct a thorough review of these documents prior to the workshop and give a brief overview at the workshop. Materials include but are not limited to the following:
· applicable background planning documents
· scoping or other workshop reports conducted prior
· existing resource reports or surveys conducted
· applicable treatment plans (e.g., HSR, CLR) or historic property nominations or DOEs
· Refining purpose and need for taking action and the proposed action (i.e., the initial NPS proposal for taking action).
· Refining the scope of the project, project area, and area of potential effects.
· Identifying operational/management issues that may be addressed within the proposed action.
· Reviewing impact topics that may be retained in the NEPA analysis. The Contractor will assist with writing the justifications for dismissal of topics from further analysis for the decision file.
· Identifying and refining the range of preliminary alternatives to the proposed action.
· Identifying the list of key stakeholders—their position on relevant planning or environmental issues and strategies for engaging them in the planning process.
· Reviewing available data and data needs to inform alternatives development, a description of the affected environment, and impact analysis.
· Identifying constraints and commitments of previous planning documents, agreements, etc.
Deliverables:
· Preparation call agenda for each park
· Meeting materials for review/discussion for each park
Subtask 3-B Workshop Attendance and Facilitation The Contractor shall assume a two-day workshop with one day devoted to site visit(s) and the second for the workshop meeting. The Contractor should assume one trip for each park with four days maximum per visit, including travel. It is anticipated that the workshop and site visit will take place in/adjacent to the parks. The parks will arrange for a meeting room and logistics associated with the site visit.
The Contractor shall provide at least two key personnel to facilitate, take notes, and actively engage in the discussions during each site visit/workshop. The Contractor shall perform the following tasks as part of the workshop:
· Meeting facilitation – The Contractor shall provide a facilitator for each workshop. The facilitator shall design and plan the workshop using appropriate facilitation tools to best help the group address the topics described under Subtask 3-A, ensure there is effective participation from all members of the group by managing the group dialogue, and establish and maintain the group’s focus on the agenda. The facilitator must be prepared to change strategies or methods throughout the workshop to ensure that the group makes progress, remains focused, and is well-positioned to accomplish the intended workshop outcomes as listed in Subtask 3-A. The facilitator must also be prepared to summarize the discussions, draw conclusions, make recommendations, identify next steps over the course of the workshop, and revise in real-time the purpose and need, proposed action, preliminary alternatives, and potential issues and impact topics.
· Site visit photographs – The Contractor shall take representative photographs during each site-visit to be used in the NEPA analysis and throughout the planning process. These may be augmented, as needed, by NPS-provided photographs.
· Gathering information – While visiting the parks, the Contractor shall obtain or arrange to obtain copies of the documents necessary to complete the preliminary project planning and subsequent NEPA tasks.
· Note taking – The Contractor shall take notes during the meetings and prepare a meeting summary (subtask 3-C).
Deliverables:
· Facilitate workshops
· Take workshop notes
Subtask 3-C Workshop Notes The Contractor shall prepare meeting notes from each meeting in summary form and not a meeting transcription, documenting discussion, decisions, and action items related to each agenda topic listed above under Task 3-A. Meeting notes shall include the related information that was prepared for the meeting under Task 3-A. The notes shall be submitted to the COR within 10 working days after the meeting. The Contractor shall assume one revision of the notes to produce final notes, assuming the first draft is of acceptable quality to the COR.
Deliverables:
· Draft workshop notes within 10 working days after each workshop, including a refined proposed action and purpose and need statement
· Final workshop notes within 5 working days of receiving NPS comments for each workshop
Task 4. Follow-up Call to the Preliminary (Pre-NEPA) Project Planning Workshop The Contractor shall participate in up to two calls per park, up to 2 hours in length, to wrap up any discussions and come to resolution on topics discussed during each preliminary project planning workshop. The Contractor shall work with the NPS to set the agenda; facilitation of each call will be shared between NPS and the Contractor, as necessary. The Contractor can anticipate that a substantial portion of each call will be related to preparing for civic engagement and stakeholder outreach.
The Contractor shall prepare conference call notes in summary form (organized by topic rather than a meeting transcription), documenting the discussion and decisions related to each agenda topic, including the elements of the alternatives, rationale/justification for the alternatives selected for analysis and those dismissed from further analysis, and any written revisions to the proposed action, purpose and need, preliminary alternatives, impact topics, and potential environmental issues, list of stakeholders and data needs.
Deliverables:
· Draft meeting materials and notes for each park
· Final meeting materials and notes for each park, including any written revisions to proposed action, purpose and need, preliminary alternatives, impact topics, and potential environmental issues, list of stakeholders and data needs
Task 5. Stakeholder Involvement Plan The Contractor shall prepare a stakeholder involvement plan for each park which will incorporate the list of stakeholders identified in Tasks 2 and 3. The stakeholder involvement plan will identify:
· Strategies and methods (messages, forms of electronic or other media, meetings, and publications) for outreach to public stakeholder groups that go beyond traditional in-person public meetings.
· Steps, schedules, and format for civic engagement meetings (prior to the initiation of the NEPA process), scoping (no in-person meetings), and public review (including in-person meetings).
· Roles and responsibilities of staff involved.
· Tools (forms of electronic or other media) that can be used to involve the public over the life of the planning process.
· Media and mailing lists.
The Contractor should assume the civic engagement plan will mostly be presented in a bulleted format. The Contractor shall submit a draft plan for each park for NPS review and comment and a final plan incorporating those comments. As part of each plan, the Contractor shall be responsible for developing the project mailing list.
Deliverables:
· Draft Stakeholder Involvement Plan for each park (including project mailing list)
· Final Stakeholder Involvement Plan for each park (including project mailing list)
Task 6. Civic Engagement Civic engagement is undertaken prior to initiating a NEPA process, so that the NPS can consider stakeholder input while developing a proposed action that will eventually be the subject of a NEPA review. The Contractor shall prepare for and host six 1.5-hour public meetings, one for each park’s civic engagement period, as well as produce civic engagement materials. Details concerning the date, location, time, and format of each meeting will be determined in consultation with the NPS. Civic engagement for each park will take place during a consolidated 30-day public comment period.
Subtask 6-A Civic Engagement Print and Media Products Based on the outcome of the stakeholder involvement plan (Task 5), the Contractor shall prepare draft print materials (e.g., newsletter, fact sheet) and digital media (e.g., PowerPoint presentation, StoryMap, press release) to provide information about the goals of civic engagement, the project’s purpose and need, proposed action, preliminary alternatives, issues and preliminary impacts, information on submitting public comments, and the schedule for civic engagement meetings. The purpose of the materials shall be to present and discuss the proposed alternatives with the public, agency, and tribal stakeholders. The Contractor shall submit draft materials for NPS review and comment.
The Contractor shall submit a draft PowerPoint presentation and other print and media materials for NPS review at least 15 working days before the first public meeting for each park. The NPS will provide comments within 5 working days of receipt. After addressing NPS comments on the draft content, the Contractor shall provide formatted print materials which meet the standards of the NPS Graphic Identity Program and digital media products, which should be mobile-friendly and compatible with nps.gov (coordination with the NPS will be necessary). Both print and media products must comply with Section 508 requirements.
NPS will print and distribute copies of the print media as necessary and post digital media to NPS websites. NPS will also publish notices announcing the availability of civic engagement materials to the public through PEPC and other sources (e.g., e-blast, social media).
Deliverables:
· Draft and final electronic files for print materials and digital media for each park
· Final electronic file for print materials and digital media with NPS comments addressed in original and PDF format for each park
Subtask 6-B: Civic Engagement Meeting Attendance and Support The Contractor shall assist with the planning and organization of a civic engagement meeting for each park. The Contractor will host and moderate the public meetings. The Contractor shall facilitate and perform tasks such as, but not limited to welcoming participants, troubleshooting, and gathering questions. Two members of the contractor team will attend public meetings.
The Contractor shall document each meeting for the decision file including number of attendees and contact information to add to the project mailing list, preliminary alternatives presented, comments received from public, and final meeting materials.
The Contractor shall provide the workshop documentation within 5 working days after each meeting. The NPS will provide comments within 5 working days of receipt and will post the recording link to PEPC.
Deliverables:
· Host six public meetings
· Meeting documentation including participant list within 5 working days of each meeting
Task 7. Civic Engagement Comment Analysis Subtask 7-A. Prepare Civic Engagement Comment Coding Structure After reviewing a cross-section of the public/stakeholder comments from each civic engagement meeting, the Contractor shall develop a coding structure using the NPS Planning, Environment, and Public Comment (PEPC) system to be reviewed and approved by the NPS. No coding shall be done without prior approval by the NPS COR. After the coding structure is approved by NPS, the Contractor shall input it into the PEPC system.
Deliverables:
· Draft coding structures
· Revised coding structures
Subtask 7-B. Review and Code Unique Civic Engagement Correspondence Upon review and approval of the coding structures, the Contractor shall review unique pieces of correspondence, identify substantive comments and code comments from the pieces of correspondence, and identify representative quotes (verbatim comments representing the concern statement). Substantive comments are defined in the NPS NEPA Handbook. The Contractor should assume a total of 50 pieces of unique correspondence per park (excluding form letters) will need to be reviewed and coded. For cost estimating purposes, it should be assumed that most of these correspondences will be short (1-2 paragraphs). The Contractor shall enter comments from each civic engagement meeting as one piece of correspondence. NPS will enter any hard copy correspondence received via email or post delivery into PEPC prior to coding.
Deliverable: Code up to 50 unique correspondences for each park
Subtask 7-C. Develop Concern Statements for Civic Engagement Comments After coding the public comments, the Contractor shall develop concern statements for the comments to streamline comment summary. The Contractor shall assume that up to 20 concern statements per park will need to be developed. The concern statements should summarize the issues received from the public as they relate to the purpose and need, scope of the proposed action, and preliminary alternatives and issues. Concern statements should stand on their own, meaning they should not rely on representative quotes for meaning or context. The Contractor shall deliver draft concern statements to NER prior to incorporating into the draft summary report under the next subtask. The Contractor should assume one revision to the concern statements after NPS review, assuming the first draft is of acceptable quality to the COR.
Deliverable: Prepare up to 20 concern statements for each park
Subtask 7-D. Civic Engagement Comment Summary Report Within 15 days after the close of the civic engagement period, the Contractor shall produce a comment summary report for each park for review and approval by the NPS. These reports shall contain concern statements, representative quotes for each concern statement, and may include other demographic information and indices that can be generated in PEPC. The Contractor shall discuss the specific content and organization of these reports with the COR prior to developing the draft.
After NPS review of these products, the Contractor shall participate in a conference call to discuss the reports and identify necessary revisions. The Contractor shall assume one revision of each report would be required after the conference call, if the first draft is of acceptable quality to the COR.
Deliverables:
· Draft comment summary reports for each park
· Final comment summary reports for each park
Task 8. Proposed Action and Preliminary Alternatives Review and Refinement Call The Contractor shall facilitate one call, up to two hours in length, to review and refine the proposed action and alternatives for each park based on civic engagement or other consultation. The Contractor shall prepare all materials necessary to facilitate this call including, but not limited to, call agenda, summary of materials prepared to date regarding the proposed action and alternative, and maps of the project area to facilitate discussions. All maps shall be in sufficient detail to illustrate the planning area, and other information relevant to this project. The call materials shall reflect information and insights obtained from the interdisciplinary team and civic engagement and will be distributed electronically.
The Contractor shall prepare call notes in summary form, documenting the discussion and decisions related to each agenda topic. The notes shall include a summary of the proposed action and preliminary alternatives in a narrative format (tabular format can supplement the narrative and assist in alternatives comparison), as well as a list of outstanding items needing resolution. When the Contractor provides the meeting notes, the related background information that was prepared for the call shall also be included.
Deliverables:
· Draft call materials and notes for each park
· Final call materials and notes for each park
Task 9. Pre-NEPA Overview Documentation The purpose of this task is to prepare existing information to allow the NPS to determine whether it is ready to begin a NEPA process at each park, meaning that there is a well-defined purpose and need, preliminary alternatives, preliminary affected environment, and preliminary impact analysis, to allow the NPS to meaningfully evaluate potential impacts of the proposed action and alternative(s) for each park.
Subtask 9-A. Purpose and Need, Proposed Action, and Preliminary Alternatives The Contractor shall compile the purpose and need and proposed action following the civic engagement at each park. This task should be a refinement of prior tasks and should clearly explain why the NPS is proposing an action and what the action is intended to accomplish.
The Contractor shall prepare a description of all reasonable alternatives developed to-date for each park through preliminary project planning (including the alternatives refinements). The Contractor should prepare up to three alternatives, including the no-action alternative. The Contractor shall include supporting draft color graphics for internal NPS review, including maps of the alternatives. The Contractor shall also include a discussion and justification for alternatives considered but expected to be dismissed, and potentially a table comparing elements of alternatives at the discretion of the NPS if necessary.
The Contractor shall track and document the resolution of all comments in a comment matrix and apprise NPS regarding any unresolved comments. The Contractor shall assume one revision of the Overview Document for each park, assuming the first draft is of acceptable quality to the COR.
Deliverables:
· Draft Overview Document: Purpose and Need, Proposed Action, and Preliminary Alternatives for each park
· Final Overview Document: Purpose and Need, Proposed Action, and Preliminary Alternatives for each park
Subtask 9-B. Draft Impact Analysis Methodologies and Subject Matter Expert (SME) Calls The Contractor shall schedule up to 4 calls (2 hours each) per park with the NPS subject matter experts, as determined necessary by the NPS, to discuss the proposed approach for analyzing impacts identified as potential topics to retain for NEPA analysis for each park. Before the calls, the Contractor shall develop and submit a recommended impact analysis approach for NPS review, including methodology sections for each resource, sources of data, area(s) of analysis, need for surveys/field review, reasonably foreseeable environmental trends and planned actions in the area(s), and identification of up to 6 potential resources/impacts.
Deliverables:
· Recommended approach to impact analysis and impact topic for each park
· SME calls for each park
Subtask 9-C. Overview Document: Preliminary Affected Environment The Contractor shall prepare a description of preliminary issues associated with the preliminary alternatives at each park to address the purpose and need. The affected environment shall include changes to the environment that are reasonably foreseeable.
The Contractor shall systematically review and include, as necessary, the issues identified throughout the Preliminary Project Planning Services phase, including civic engagement. The Contractor shall track the resolution of all comments in the overview document and apprise NPS regarding any unresolved comments. The Contractor shall assume one revision of the overview document, if the first draft is of acceptable quality to the COR.
Deliverables:
· Draft Overview Document: Affected Environment for each park
· Final Overview Document: Affected Environment for each park
Subtask 9-D. Overview Document: Preliminary Impact Analysis The Contractor shall prepare a preliminary analysis of the potential impacts of the preliminary alternatives for each park. The Contractor shall include supporting graphics as necessary to illustrate findings and conclusions. For each resource, the document shall include the following: a discussion of the environmental impacts of the proposed action and reasonable alternatives, including direct, indirect, and cumulative effects. The Contractor shall consult with lead NPS resource specialists as needed to obtain more detailed technical and support information pertaining to potential impacts. The Contractor shall assume one revision of preliminary analysis for each park, assuming the first draft is of acceptable quality to the COR. The Contractor shall track and document the resolution of all comments in a comment matrix on the Overview Document and apprise NPS regarding any unresolved comments.
Deliverables:
· Draft Overview Document: Preliminary Impact Analysis for each park
· Final Full Overview Documents with NPS comments addressed for each park In addition, the contractor shall provide an Overview Document/Briefing document for each park to assist in requesting permission to start NEPA:
· Status of NHPA Section 106 and Endangered Species Act Section 7 consultations, summary of any outstanding issues, and steps/schedule required to complete consultations.
· Schedule for completion of EA within Department of Interior/NPS streamlining requirements, including permitting and responsibilities for completing requirements.
· This task shall also involve drafting a NPS regional briefing statement for requesting the regional director’s approval to formally start the NEPA process. NPS shall provide an example briefing statement and the Contractor should assume a less than 15 slide presentation.
Deliverable:
· Draft regional briefing statement (NPS to finalize) for each park
PART 2. National Environmental Policy Act (NEPA) NPS will continue to evaluate the appropriate NEPA pathway for this project during the pre-NEPA phase. At this time, the Contractor should assume preparation of an EA and FONSI within the project schedule provided below (which meets the requirement to complete a FONSI within 1 year of NPS Regional approval to start the EA per CEQ NEPA regulations effective September 2020) and following any applicable Department of the Interior and NPS Regional guidance. The EA shall be a succinct summary, no longer than 75 pages, excluding appendices, tables, and figures. The Contractor shall work with the NPS to develop and maintain a schedule for completing the FONSI for each park within the required one-year timeframe.
Task 10. EA Draft 1st The Contractor shall deliver a complete, technically adequate, edited internal draft EA for each park for NPS review in a manner consistent with 40 CFR §1502.8 (in plain language). The internal draft EA shall include, at a minimum, all required content for EA identified in Appendix A of the DO-12 NPS NEPA Handbook (2015). The internal draft EA shall be no longer than 75 pages, excluding tables, figures, and appendices, which shall be included as necessary. It is anticipated the EA will contain at least one technical appendix that is written in a manner that can be easily understood by the public. Appendices may include an adaptive management plan, species/vegetation association lists/descriptions, and a vegetation management plan. The Contractor shall use information from deliverables in Tasks 1-9, and information obtained during the civic engagement and scoping periods for the EA. The Contractor shall incorporate by reference as appropriate any materials that cannot be fully described in the EA, including as appropriate, literature reviews. Items such as alternatives and issues dismissed may be included in the appendix of the EA.
Deliverable: Draft internal EA for each park
Task 11. Internal Review Roundtable Calls The Contractor shall hold up to three calls (each up to two hours) to review internal draft EA comments with each park, NPS regional office, and other specialist team members. The purpose of the roundtable meetings shall be to discuss substantive issues associated with the draft EA, identify any issues needing resolution prior to publishing the EA to the public, evaluate how alternatives meet the objectives of the plan, and discuss an NPS Preferred Alternative. The Contractor shall identify substantive NPS comments that need to be addressed in advance of the meeting and prepare a meeting agenda. The Contractor shall take notes capturing all discussions and decisions during the roundtable meeting to enable the Contractor to resolve comments when preparing the camera-ready EA. The Contractor shall assume one revision of the notes, assuming the first draft is of acceptable quality to the COR.
Deliverables:
· Draft meeting agendas for each park
· Draft call notes for each park
· Final call notes for each park
Task 12. EA Draft 2nd The Contractor shall incorporate NPS comments from Tasks 10 and 11 into a revised second internal draft administrative EA for each park. The document will build upon the first internal administrative draft EA and retain all attributes of those documents including all required content for the EA identified in Appendix A of the NPS NEPA Handbook and a full technical edit. A comment matrix presenting how NPS comments were addressed will accompany this deliverable to ensure the documents are ready for region review.
Deliverable: Revised Second Internal Draft EA for each park
Task 13. Camera-Ready EA The Contractor shall deliver a complete, technically adequate, edited camera-ready EA with NPS comments incorporated for each park. The complete camera-ready draft EA shall include final graphics and shall be delivered in digital format. The NPS will conduct a review of the camera-ready draft EA for any minor text/layout changes that may need to be corrected by the Contractor and will use the camera-ready version to obtain permission to print approval for the public EA from the Regional Director. After incorporation of any minor text/layout changes, the Contractor shall deliver a final camera-ready document which shall include final Section 508 formatting, bookmarking, indexing, and proper format for Government Printing Office printing.
Deliverables:
· Draft camera-ready EA for each park
· Final camera-ready EA incorporating NPS regional and other comments for each park
Task 14. EA Public Comment Meeting Subtask 14-A. Public Meeting Materials The Contractor shall prepare print materials (e.g., updated newsletter) and digital media (e.g., updated StoryMap, press release) for each park to provide information about alternatives, issues and impact analysis, how to submit public comments, and the public meeting schedule for NPS submittal. The draft content shall be delivered first for one round of NPS review and comment, assuming the draft is of acceptable quality to the COR.
After addressing NPS comments on the draft content, the Contractor shall provide formatted print materials which meet the standards of the NPS Graphic Identity Program and digital media products, which should be mobile- friendly and compatible with nps.gov (coordination with the NPS will be necessary). Both print and media products must comply with Section 508 requirements.
NPS will print and distribute copies of the print media as necessary and post digital media to NPS websites. NPS will also publish notices announcing availability of each EA and public meeting (e.g. press release).
Deliverables:
· Draft print materials and digital media for each park
· Final print materials and digital media for each park
Subtask 14-B. Virtual or In-Person Public Meeting Organization and Facilitation The Contractor shall assist with the planning, organization, and moderation of one, 1.5-hour in-person slide presentation during the public review period for the EA for each park. If virtual, the Contractor will provide the host platform (e.g., MS Teams, Zoom.). The Contractor shall work with the COR and parks to develop a draft outline/script for the webinar/meeting and a PowerPoint presentation and shall lead in a practice “dry run” session before the public webinar/meeting to ensure all of the meeting presenters are comfortable using the webinar/presentation software and anticipate issues and public needs during the meeting. The Contractor shall facilitate the public virtual meeting and perform tasks such as, but not limited to, welcoming participants, troubleshooting, and gathering questions. The Contractor shall provide draft meeting materials to NPS for review and comment from which final materials will be created.
If a meeting is hosted virtually, the Contractor shall record the public meetings for future use (e.g., by the public) and provide the 508-compliant recording to the NPS within 5 days of each virtual meeting. The Contractor shall take comprehensive notes documenting the meetings including the number and names of attendees and comments received.
Deliverables:
· Draft meeting materials including presentation and outlines/scripts for each park
· Final meeting materials including presentation and outlines/scripts for each park
· Meeting recordings for each park with a virtual meeting
Task 15. EA Public Review Comment Analysis Subtask 15-A. Entering Public Review Correspondence into the NPS Planning, Environment and Public Comment System (PEPC) The Contractor shall be responsible for entering all non-electronic correspondence into PEPC for each park. The Contractor shall enter correspondence not directly received through PEPC into PEPC. For estimation purposes, the Contractor should assume entry of up to 10 correspondences (e.g. faxes, hard copy letters, and summary of comments from the public meeting typed into the PEPC database) for each park; including those comments received at the public review meetings. (Note: one set of public meeting comments is considered one piece of correspondence).
Deliverable: Enter up to 10 correspondences into PEPC for each park
Subtask 15-B. Prepare Coding Structure After reviewing a cross-section of the comments, the Contractor shall develop a coding structure for each park to be reviewed and approved by the NPS. No coding shall be done without prior approval by the NPS COR.
Deliverables:
· Draft coding structures for each park
· Revised coding structures for each park
Subtask 15-C. Review and Code Unique Correspondence Upon review and approval of the Coding Structure, the Contractor shall review unique pieces of correspondence, code individual comments from the pieces of correspondence, and identify representative quotes (verbatim comments) in PEPC for each park. The Contractor should assume a total of 50 pieces of unique correspondence (excluding form letters) will need to be reviewed and coded for each park. For cost estimating purposes, it should be assumed that the majority of these correspondences will be short (1-2 paragraphs).
Deliverable: Review and code up to 50 unique correspondences for each park
Subtask 15-D. Developing Concern Statements After coding the public comments…