This is a draft Statement of Work (SOW) for field fencing installation at the Horning Seed Orchard in Colton, Oregon, commissioned by the Bureau of Land Management (BLM). The project requires installing approximately 3,750 linear feet (0.71 miles) of field fencing along Unger and Baurer roads, with specific technical requirements including a 7-foot high woven wire fence with a 30+ year lifespan and one 16-foot gate. The fencing is designed to protect improved conifer seed trees from animal browse and damage, located at an elevation of 900 feet in Clackamas County.
The SOW details comprehensive technical specifications for fence construction, including post requirements (minimum 3-foot burial depth, 10-inch diameter anchor post holes), materials (pressure-treated wooden or steel posts, woven wire), and installation guidelines. The contractor must provide all labor, transportation, materials, and equipment, with work restricted to regular working hours (sunrise to sunset, Monday-Friday). The project emphasizes quality control, with government inspection of fence line flagging and completed work, and includes provisions for historical and archaeological data preservation. Payment will be made in full upon project completion and acceptance by the Contracting Officer Representative (COR).
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Bureau of Land Management
Horning Seed Orchard – Colton, OR
Field Fencing
Description – Fenceline and Gate Installation: Field fencing must be at least 7 feet high and strung with a square or rectangle woven wire or product of similar durability. Fencing must have a 30+ year lifespan. One gate spanning 16 feet shall also be installed. See description of work below.
Quantity: approximately 3,750 ft (0.71 miles)
Project Location: Horning Seed Orchard 27004 S. Sheckly Rd., Colton, OR 97017.
1.0 INTRODUCTION:
Horning Seed Orchard farms improved conifer seed for reforestation. It is important to protect the trees that provide the seed from animal browse or other damage.
2.0 SITE DESCRIPTION
The site is located in the eastern foothills of the Willamette valley at an elevation of 900 feet, is generally flat, and was recently cleared and pile burned. As of January 2025, the site is still bare mineral soil. All the site is drivable except for a few hundred feet in the southernmost corner of the project area. However, there is a county road that could provide some access.
3.0 LOCATION OF PROJECT
The project is located in Clackamas County near Colton, Oregon. The GPS location is 45°12'16.6"N 122°24'39.8"W – which can be copied and pasted into maps. The field fencing is to follow Unger and Baurer roads along the existing cleared area. See project map below.
DRAFT
4.0 DESCRIPTION OF WORK
The field fencing is to follow Unger and Baurer roads along the existing cleared area. The fence shall be offset a minimum of 15 feet from the ditch line or any guylines supporting power poles. The fence line must be flagged/staked prior to actual fence installation.
Fencing would consist of metal or wooden anchor points (also known as stress panels) with metal intermediate posts. All posts must be buried a minimum of 3 feet. All anchor and corner post holes must be a minimum of 10 inches in diameter and filled with gravel or concrete. A square or rectangle woven wire is to be attached to the posts to create a 7-foot vertical barrier If multiple rolls of woven wire are joined together, they must be connected with fencing clips every 10 feet. No barbed wire and no top railings would be needed with the exception for anchor points and corners, which need a top rail. Gate posts shall be made of steel and placed in concrete while also following the depth and diameter requirements of anchor posts. Gate panels shall be at least 7 feet tall and 8 feet wide and hung with steel locking hinges. See attached photos for examples.
5.0 ACCESS TO PROJECT AREA
Access to the project site would be from Unger Road and thru the BLM gate. A gate key can be issued if needed.
6.0 CONTRACTOR FURNISHED PROPERTY AND SERVICES
Unless otherwise specified herein, the Contractor shall provide all labor, transportation, materials, and equipment necessary to perform the work as described in the SOW.
Crew Requirements
A. The Contractor shall maintain an adequate work force at all times to ensure timely completion of the work.
B. At the pre-work conference, the Contractor shall designate one English-speaking supervisor, who is knowledgeable and experienced in the required work. Any changes in supervisory designations must be submitted in writing to the Contract Officer Representative (COR) at least 24 hours prior to the change taking effect.
C. The person designated by the Contractor as supervisor must perform in that capacity.
The supervisor must, therefore, effectively direct the crew by making periodic inspections of the crews' work and advising them of any discrepancies found in the work that deviate from the specifications and by providing instructions for correcting any improper work. Any group of people without such an individual will not be considered a crew.
D. The designated supervisor shall be present at the work site each workday. If the supervisor is not present, the crew will not be permitted to work.
E. The supervisor shall know the requirements of the contract including technical requirements and unit locations. The COR or any Government representative will not act as a supervisor to the crew.
Materials
A. The contractor shall supply all wooden and/or steel metal posts, steel T posts, woven wire (or equivalent), fencing nails, clips, and stays, wire bracing, gates, hinges, gravel, and concrete (if needed)
- Wooden posts must be pressure treated and at least 6 inches in diameter.
- Woven wire equivalent but must approved by the COR.
- Gate must be two 8 foot steel panels to form a 16 foot wide gate. Gate panels must be at least 7 feet tall.
- Gate posts must be steel and placed in concrete.
Equipment
A. The contractor is responsible for supplying all equipment to complete fencing.
Equipment may be stored on site. The government is not liable for any damage or theft that may occur to equipment during operations or storage.
7.0 SECURITY OF MATERIALS
The Contractor may leave its equipment and supplies at the work site. The Contractor shall be responsible for any equipment and supplies if it should be lost, stolen or damaged. Any refuse, garbage, or debris are to be discarded by the Contractor.
8.0 WORK PLAN
The Government may request a work plan to be submitted with the price proposal. The Government shall furnish the Contractor with a written request that shall include all documentation necessary for the Contractor to prepare a work plan for the individual requirement. Work plan requests, if needed, shall be specific to the requirement. The work plan is the Contractor's overall estimate for the completion of the requirement and shall include the following:
8.1 Date of commencement of work and any necessary revision to the Government's requested schedule of performance.
8.2 In the event certain items and/or services are required and are not contained or priced in the contract schedule, the Contractor shall immediately contact the BLM NOC Contracting Officer (CO) for appropriate guidance.
9.0 QUALITY CONTROL PLAN/INSPECTION
The contractor shall establish and maintain a complete Quality Control Plan acceptable to the Government to ensure the requirements of the contract are provided as specified. The government shall inspect and approve the fence line flagging/staking prior to fence installation.
The Government shall inspect completed fence as a basis for acceptance and payments, and to provide recommendations to improve work quality while work is in progress. The Contractor is responsible for providing quality control to assure that work complies with requirements of contract specifications.
Unsatisfactory Work
If the work quality is deemed unsatisfactory, the COR shall immediately notify the CO and the Contractor in writing. The CO, COR, and Contractor shall meet and discuss the unsatisfactory work and how to resolve any issues to bring the work back to an acceptable level.
Performance Time
In the event that work is performed that is contrary to the requirements in the Contract, the Government is not liable for costs incurred by the Contractor during negligent performance that is without the fault or negligence of the Government.
10.0 WORK HOURS
The performance period established for this contract is based upon all work being conducted during regular working hours. Regular working hours are limited to the time between one-half hour before sunrise to one-half hour after sunset each day, Monday through Friday, excluding Government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and Government holidays, a request must be submitted to the Contracting Officer Representative in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.
11.0 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
The Historic and Archeological Data Preservation Act of 1974, provides for the preservation of historical and archeological data that might otherwise be lost as the result of alterations to the terrain caused by a federal or federally licensed activity or programs.
If, in connection with operations under this contract, the Contractor or employees discovers, encounters, or becomes aware of any possible historical or archeological data, objects or sites of cultural value on the project area, such as historical ruins, graves or grave markers, fossils, or artifacts, the Contractor shall immediately suspend all operations in the vicinity of the cultural value and shall notify the COR and shall notify the Contracting Officer in writing, giving the location and nature of the findings. No objects of cultural resource value may be removed.
Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the Changes clause.
The Contractor shall be responsible for protecting the cultural resources within the affected area from damage. In addition, the contractor shall be liable for all damage to the identified cultural resources caused by their actions or the actions of their agents or representatives. The Contractor shall immediately notify the Contracting Officer or his/her representative if any damage occurs to any cultural resource and immediately suspend work in the area in which damage has occurred until authorized to proceed. Actions taken under this paragraph shall be subject to the FAR 52.242-15 Stop-Work Order.
12.0 PAYMENT
Payment shall be made in full once the COR has notified the CO that the work is acceptable, and the project is complete.
Example of anchor point with intermediate steel T post to the right and woven wire.
Example of corner.
Example of steel double gate with steel posts.