A04.01 PWS cold storage rental_Redacted.pdf

PDF 568 KB Posted

Attached to
Cold Storage Rental Federal contract opportunity
Solicitation number
N4523A23Q1338
Issued by
Department of the Navy Naval Supply Systems Command

About this file

This document is a performance work statement for the rental of cold storage units at a naval shipyard. The statement specifies requirements for freezer and refrigerator boxes to be delivered and maintained under lease, including monthly maintenance by the contractor, 24-hour repair timelines, and delivery and return procedures. Units must be fully assembled and operational at delivery, with documentation including manuals and emergency contact information. The related federal contract opportunity is a pre-solicitation notice from the Department of the Navy Naval Supply Systems Command for the cold storage rental with no other details provided.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Freezer and Refrigerator Boxes

Spec #: 2016-03 Rev: Page 2 of 4

4. RESPONSIBILITITES

4.1. Government

4.1.1. N/A

4.2. Contractor

4.2.1. For emission producing machinery as required by the State, the Contractor shall obtain permits for the duration of the lease and affix them onto the units.

4.3. Maintenance

4.3.1. Monthly maintenance of units per original manufactures specifications. Monthly maintenance to include operational check of unit(s) internal/external latches and occupancy sensor indicator to verify proper operation.

4.3.2. Except for daily surveillance checks i.e. liquid levels, the Contractor is responsible for and shall perform all maintenance (e.g. refrigerant charge, oil changes, replace / clean filters, lubrication, coolant refills, liquid top-offs, etc.) for the duration of the lease. Coordinate maintenance with Shipyard POC.

4.3.3. The equipment will be operating around-the-clock under a rigorous deployment performance schedule. Within twenty-four (24) hours (one-day) of initial notification of the need for repair, the Contractor shall have a knowledgeable and equipped technician on the job-site fully prepared to repair the rental equipment.

The defective unit(s) shall be repaired within twenty-four (24) hours (one-day) of initial notification or, if the original defective unit(s) cannot be made operational, replaced within forty-eight (48) hours (two days) of initial notification. If the equipment failure is not the fault of the Government, the Contractor shall bear all costs associated with its repair and/or replacement.

4.4. Training

4.4.1. N/A

4.5. Operator / Maintenance Manuals - Documentation will be located within a water proof case affixed to each machine. Minimally, the documentation shall consist of:

4.5.1.1. Technical Instructions (TIs) such as an Operations & Maintenance Manual, Controls Manual, and/or Electrical Manual with Schematics

4.5.1.2. Lifting & Handling the equipment with its padeye(s) Certification

4.5.1.3. Equipment Data Sheet (EDS)

4.5.1.4. Operating Instructions, if not in the TIs

4.5.1.5. Points of contact with telephone numbers for requesting emergency repair regardless of the time or type of day

5. DELIVERY / RETURN

5.1. Delivery - The machinery shall be in a fully-charged, fully-assembled, ready-to-use, and in a first-class-operating condition. Machines shall be functionally tested to include

Rev: Page 3 of 4 performance of ____N/A_________ prior to its delivery. The machinery with its support equipment shall be delivered to the site on or prior to the request date. It is incumbent and the responsibility of the Contractor to either confirm or coordinate the date and time of delivery prior to each shipment via the Point-of-Contact (POC) as designated on the Contract and/or the Contracting Officer's Representative (COR). The Government can provide forklift services for removing machinery from Vendor’s transport during work hours. Documentation with Shipyard copies shall accompany each delivery.

5.2. Security - To be allowed onto a government Shipyard, personnel must be US citizens and in possession of appropriate personal identification. Proof of US citizenship may be necessary and can be required for access to the drydock. Allowable documentation of US citizenship is an official government issued Certificate of Birth or Naturalization (w/ raised seal & not a photocopy) or a US passport (can be expired). Vehicular access requires a non-expired personal Driver’s License and appropriate vehicle identification or registration. The transport vehicle must have the company’s name / logo prominently displayed. To gain access to the drydock environs, personnel must be escorted and possess / wear their own personal safety gear.

5.3. Inspection Criteria

5.3.1. Start-Up

5.4. Packaging and Marking

5.5. Final Acceptance - Upon satisfactory completion of inspection and test of the equipment, the authorized Government Representative (Puget Sound Naval Shipyard, Code 990 Equipment Manager/Code 420 COR) will sign and forward the acceptance document(s) to Code 220P Production Control for completion. Unloading of equipment from Vendor’s transport does not signify acceptance.

5.6. Return - The Government will dismantle the equipment and provide a temporary storage location convenient for Contractor pick-up. The Government will notify the Contractor as well as the Contracting Office as to when the rental Item has been released and is available for pick-up. The last day of the rental period shall be the next normal workday after the Contractor has been so notified. The Contractor shall be responsible for shipping. The Government can provide forklift services during work hours for placing the equipment onto the vendor’s transport.

6. GENERAL

6.1. Response to Request - As part of the response to this request, descriptive literature shall be furnished in sufficient detail to show that the proposed design will meet these specifications. Vendor submittals shall include brochures of the model being submitted, assembly sketches with critical dimensions, sketches (with dimensions) of all tooling being provided, statements of compliance with specification, and performance statements with special instructions. Supporting information shall be organized and packaged by unit. If supporting information includes multiple models the vendor shall clearly state model number of proposed unit and redact all information not applicable to proposed unit.

Rev: Page 4 of 4

6.2. Approved Models

6.2.1. N/A