A04_Cable_Mill_SOW_Wastewater_System_Rehabilitation_Project_9-11-23.docx

DOCX document 45 KB Posted

Attached to
Great Smoky Mountains REHAB CABLE MILL WASTEWATER
Solicitation number
140P5324R0009
Issued by

About this file

This document outlines a federal contract opportunity for rehabilitation services at the Cable Mill Wastewater System in the Great Smoky Mountains National Park. The solicitation number is 140P5324R0009 and is seeking proposals for rehabilitation of the wastewater system located at the historic Cable Mill area. Proposals are due by September 11, 2023. The required scope of work includes inspection and assessment of the current wastewater infrastructure, development of rehabilitation recommendations and construction documents, and project management services through rehabilitation implementation. The awarded firm will work under the supervision of the National Park Service Southeast Region to complete repairs and upgrades to ensure the continued functioning of the wastewater system while preserving the historic structures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

Wastewater System Improvement Project

PMIS # 291751

Cable Mill Area Blount County, TN Great Smoky Mountains National Park 9/11/2023

1. General Information The Great Smoky Mountains National Park (GRSM) is located in Tennessee and North Carolina and consists of nearly 521,000 acres. The park was established by Congress on June 15, 1934. The Park’s mission is to protect, preserve, and interpret the natural, cultural, and historical resources for the benefit and inspiration of present and future generations. There are over 9 million visitors annually.

2. Facility Background The Cable Mill area is located in the far west end of the Cades Cove Loop Road in Blount County, Tennessee. The closest access to this area is from Townsend, via Highway 321 and State Route 73, and finally Laurel Creek Road. The Cable Mill area includes a Visitor Center/Store, and a comfort station, as well as numerous pioneer day structures.

EXISTING WASTEWATER SYSTEM

There is one comfort station in the Cable Mill Area along with the Visitor Center/Store. The wastewater generated in the comfort station is routed to a septic tank, followed by a dosing tank. The dosing tank doses a large underground sand filter. The effluent from the sand filter drains to a holding tank and is pumped to an underground subsurface disposal system. The overall system is not keeping up with the wastewater flow generated at the comfort station.

3. Scope of Proposed Work The proposed scope of work is as follows:

WASTEWATER SYSTEM IMPROVEMENTS

It is proposed to abandon the existing septic tank and sand filter system and install a new septic tank. The new septic tank will discharge to a new dosing tank, which in turn will pump to a new subsurface wastewater disposal field. An additional storage tank will also be installed adjacent to the dosing tank to provide additional storage capacity during peak flows. Due to funding limitations, not all of the proposed work will be done as part of this contract. Several bid options are provided to provide for phasing of the proposed work.

4. Contractor Responsibilities Contractor shall provide the following materials and services:

(All materials and installations shall be in accordance with the Tennessee Department of Environment and Conservation standards and specifications)

WASTEWATER SYSTEM IMPROVEMENTS

· NEW SEPTIC TANK AND DRAIN FIELD:

Contractor shall provide and install a new septic tank, dosing tank, storage tank, distribution boxes, and drain field as illustrated on the proposed construction plans. The proposed drain field will consist of two adjacent areas, each of which will contain 15 drain lines at 135 linear feet each. All clearing and grading necessary for the proposed work shall be included in the scope of work.

· DEMOLITION:

The existing septic tank shall have a bolted lid installed or the existing lid can be welded closed. The sewer lines entering the tank shall be exposed and capped on both sides of the tank – note that the lines are very shallow, and easily exposed.

· AREA RESTORATION:

All areas disturbed by the contractor shall be restored to original condition. A gravel road will need to be crossed with the proposed force main pipe. The road will need to be replaced to original conditions in accordance with the plans and specifications. Areas outside of gravel road areas shall be graded, and hydro-seeded with the approved Park seed mix. Areas outside of the immediate work area shall not be disturbed.

4A. Base Bid and Bid Options The contract is to be broken up into a Base Bid and three Options. Work associated with each is as follows:

Base Bid: This item includes providing and installing a Duplex Pump Vault (12 – refer to the Construction Plans for the numbered items) in the existing storage tank under the existing Chlorinator Building, installing a 2-inch HDPE pump line (5), including three clean-outs (5A-5C), to the 5-Way Splitter Box (7) and the supply lines for the proposed subsurface disposal field, and installation of one-half of the proposed Subsurface Disposal Field (10A), which includes 15 Subsurface Disposal Lines as shown on the Construction Plans, and labeled as 10A.

Option A: This item includes providing and installing the new Intercepting Manhole (1), Gravity Sewer (1A), the 7,000-gallon Septic Tank (2), and the 7,000-gallon Dosing Tank (3).

Option B: This item includes providing and installing the 7,000-gallon Storage Tank (4).

Option C: This item includes providing and installing the 2-Way Splitter Box (6), the 2-inch Pump Line (8) to the second splitter box, the 5-Way Splitter Box (9), and the supply lines for the proposed subsurface disposal field, and installation of one-half of the proposed Subsurface Disposal Field (10B), which includes 15 Subsurface Disposal Lines as shown on the Construction Plans, and labeled as 10B.

5. Government Furnished Property, Materials & Supplies The GSMNP will not be providing property, materials or supplies for the subject project.

6. Business Hours The contractor shall typically complete on-site work or delivery, including unloading, during normal business hours of 7:30 am to 4:30 pm, Monday through Friday, excluding weekends and Federal holidays. However, upon coordination with the COR, the contractor may work earlier or later as required. The contractor may also work weekends if necessary, upon coordination with the COR. The contractor shall coordinate the specific on-site work schedule with the Contracting Officer and COR five days prior to performance start date. While on site, the COR may be reached by mobile phone during normal business hours.

Also, Wednesdays are “Vehicle Free” days or bicycle only days. The Contracting Officer may allow work on these days provide the contractor enters the Park early, has a Park escort, and leaves at the end of the day under a Park escort. This will have to be addressed on a week by week basis.

7. Management During Normal Working Hours The contractor shall manage the total work effort in accordance with effective and efficient management principles and safe working practices to ensure safety of the public and on-time completion of this contract.

8. Maintenance of Traffic The proposed work will need to be done while the Cable Mill Visitor Center/Store and comfort station are open and in use; therefore, the contractor will need to provide traffic control, both vehicular and pedestrian, in these areas as necessary. The contractor shall follow the Manual of Uniform Traffic Control Devices (MUTCD) for any traffic control that might be required. The Contractor shall use appropriate traffic control devices needed for all work and for protecting workers and visitors. One lane closures are allowed, Traffic shall be controlled with flaggers and appropriate signage. Contractor shall provide advance notice if the closure is expected to exceed 10 minutes.

9. Safety & Environmental Compliance

· The contractor shall comply with pertinent provisions of the Occupational Safety and Health Act (OSHA), and state, local, safety, laws.

· The contractor shall comply with pertinent Environmental Protection Agency laws and regulations.

· Contractor must be licensed in the State of Tennessee to install subsurface wastewater disposal facilities.

· Installed sewer lines must pass a pressure test per the project specifications.

· The GRSM safety officer has the authority to issue restraint or cease-and-desist orders to the contractor when violations or unsafe acts are present and threaten Government and contractor employees or damage to Government property.

· The contractor shall immediately report to the Contracting Officer, COR and GRSM safety officer all accidents resulting in employee injury or death or damage to property while performing this contract.

· The contractor shall erect and maintain temporary barricades/fencing to limit public access to hazardous areas or staging areas.

10. Insurance The Contractor shall be insured in accordance with the Solicitation documents. The Government is not responsible for damage to Contractor’s equipment, vehicles, tools or materials or their employees and the personal property brought on-site. The Government will not accept any liability due to contractor employee negligence.

11. Motor Vehicle & Traffic Regulations Contractor employees operating motor vehicles shall possess an appropriate, valid, driver's license. Driver and vehicle permits, licenses, registrations and proof of insurance shall be maintained in the vehicle at all times and made available upon request. Contractor employees shall comply with federal vehicle motor law requiring seat belts be worn at all times. Contractor employees shall adhere to the posted speed limits. Commercial vehicles are prohibited from the Park without prior notification to the Park. Contractor shall contact the Dispatch Office at 865-436-1294 to notify the Park of an incoming commercial vehicle.

12. Statement of Work - Requirements Summary The contractor shall install all proposed wastewater facilities and appurtenances in strict conformance with the requirements outlined in the Tennessee Department of Environment and Conservation (TDEC) regulations – 0400-48-01 Regulations to Govern Subsurface Sewage Disposal Systems. Contractor shall also comply with the TDEC Erosion and Sediment Control Handbook for all land disturbance activities.

13. Maintenance of Roadways Contractor shall show due diligence to ensure that asphalt on roadways and developed parking areas are protected from damage.

14. Gates (N/A) Contractor shall be responsible for ensuring gates are locked at the end of each shift.

1. Contractor shall provide a lock to be used on a joint locking system serving both the Park and the Contractor.

2. Gates shall be closed during the day and at the end of each day.

15. Employee Parking All contractor employees shall comply with parking procedures published for the GRSM.

16. Replacement of Contractor Employee for Security Reasons The Government retains the right to request removal of the contractor’s employee(s), regardless of prior clearances.

17. Non-Payment for Additional Work Any additional contractor performed services not specified in contract, either at its own volition or at the request of an individual other than an appointed Contracting Officer, except as may be explicitly authorized in the contract, shall be performed at the financial risk of the contractor. Only an appointed Contracting Officer is authorized to bind the Government to a change in specifications, contract terms, or conditions.

18. Conflict of Interest The contractor shall not employ off-duty COR’s or other Government employees if such employment would create a conflict of interest or be contrary to the policies contained in conflict-of-interest directives.

19. Quality Control The contractor shall establish and maintain a Quality Control Plan (QCP) to ensure the work performed conforms to the contract requirements. The Statement of Work - Requirements Summary (Section 12) provides requirements for the installation of wastewater lines, and appurtenances that are the minimum requirements for the installation of the new wastewater systems. The contractor’s QCP shall address methods for remedying any non-compliant work. The Contractor shall develop QCP and submit with proposal package. The Contractor’s QCP includes:

· Required services identified in the “Statement of Work - Requirements Summary”

· Contractor’s surveillance methodology

· Method and timeframe for responding to COR or customer complaints

· Progress meetings with Government stakeholders

20. Contractor’s Proposal Package The following deliverables are to be submitted with offer in response to RFQ.

· Technical approach to perform required services.

· Identification of key personnel to be responsible for the on-site work and their qualifications (both regarding technical ability and safety training).

· Contractor safety plan.

· Contractor’s QCP

· Proof of Insurance–Business Liability & Workers Compensation.

21. Inspection.

The Government will conduct inspections during and upon completion of required services. Final payment will be processed upon confirming that all noted contractor performance deficiencies have been satisfactorily corrected.

22. Schedule The Cable Mill Visitor Center/Store and comfort station is open year-round. Proposed work shall commence following the Notice to Proceed. The contractor shall provide a realistic schedule for the completion of the proposed work; and notify the Park if there is not sufficient time in the schedule prior to accepting the contract. Proposed schedule shall take into account limited work on Wednesdays due to “Vehicle Free” days.

23. Liquidated Damages (NA)

24. Referenced Documents The Design Plans and Specifications for the “Cable Mill Wastewater Rehabilitation Project”.

25. Base Price Schedule See attachment.

26. Location Map See attachment