Performance Statement of Work
Installation of HVAC System Headquarters Building
National Elk Refuge, Jackson, Wyoming
1.0 Introduction and Overview
National Elk Refuge HQ building (asset # is 10026593) located at 675 East Broadway, Jackson WY. The refuge is a unit of the US Fish and Wildlife Service, National Wildlife Refuge System. This statement of work requires the design and installation of a new and appropriately sized HVAC system for the headquarters building. There is currently no system in place, all heat is provided by electric baseboard units on both levels, so no ductwork exists in the building. The building consists of two floors – a basement level and a ground floor level with a total square footage of approximately 6,500 square feet.
Both levels shall be serviced by this system. The system should be energy efficient and include a system to clean and filter the air and kill air bourne virus and bacteria (to include Covid 19) such as the GPS Needle Point Bi-Polar Ionization System or an approved equivalent. The ground floor has nine individual offices with an open common area and a small conference room (see attached floor plans), the basement level is an open office design with six large spaces. Each enclosed office and conference room shall have at least one vent into that space.
1.1 Scope of Work
The contractor is responsible for designing and installing a new energy efficient HVAC system in the NER Headquarters building.
1. The contractor shall visit the building, conduct condition assessment, design, furnish, and install a 90% efficiency HVAC system. The complete HVAC system shall be tested for proper operation upon installation. The new HVAC control system shall communicate with all the air handlers, pump, and valves, etc. seamlessly and efficiently, providing staff a comfortable work environment year-round.
2. The contractor shall be a licensed Mechanical Contractor in the state of Wyoming. All work and testing shall be in accordance with the International Mechanical Code (IMC 2021) and International Energy Conservation Code (IECC 2018). Duct work shall be performed in accordance with NFPA90B.
Electrical work shall be in accordance with NFPA National Electrical Code -2017.
3. The contractor shall maintain and protect existing facilities from damage during all work.
· Protect building structure and interior from weather and water leakage and damage.
· Locate, identify, shutoff or disconnect utility services prior as needed.
· Notify the facility manager in advance of power and/or water disconnections
4. The contractor shall inspect buildings, perform, and submit load calculations (ACCA manual N) and confirm that the specified system will be efficient and provide adequate capacity
5. All system components shall be from the same manufacturer, including controls.
1.2 Period of Performance
The work shall be completed in 120 days from notice to proceed.
1.3 Project Safety
The Contractor shall be responsible for strict compliance with all provisions of Occupational Safety and Health Administration (OSHA) requirements 29 CFR 1910 and 29CFR 1926 during performance of the work.
2.0 Project Requirements
A. All work will adhere to local building codes. All work and materials shall be in compliance with all applicable building codes, and the applicable performance standards:
1. American Society of Mechanical Engineers (ASME)
2. American Society for Testing Materials (ASTM)
3. National Electric Code (NEC), National Energy Conservation Code (NECC), & International Mechanical Code (IMC).
4. Air-Conditioning, Heating, and Refrigeration Institute (AHRI)
5. American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE)
B. Field Measurements:
On site field investigation and measurements shall be made prior to procurement of the new HVAC system, to ensure that the proposed mechanical equipment will fit the site of the installation.
C. HVAC Equipment and appurtenant work:
The Contractor shall furnish and install all required equipment to include piping, valves, electrical wiring, switches, and appurtenant items as required for a fully functional energy efficient (95% minimum) HVAC system.
D. HVAC equipment shall meet the following performance requirements:
1. Provide and install a new HVAC system for heating, ventilation, and cooling. The HVAC system shall be in compliance with the following applicable performance standards: Air-Conditioning, Heating, and Refrigeration Institute (AHRI), and the American Society of Heating, Refrigerating and Air Conditioning Engineers (ASHRAE).
2. The Contractor shall provide all required adjustments or components so the HVAC unit will properly function when installed. Contractor shall replace the insulation that has been removed.
Provide and install all incidental materials required to install the HVAC unit, including piping, valves, regulators, electrical wiring, switches, connections, drain pan, air filters, and compatible thermostats.
3. The system shall be a minimum 90% energy efficient Energy Star rated.
4. Upon completion of the installation, the HVAC system shall be complete and fully operational.
Perform startup operations with the presence of Refuge personnel.
5. The installer shall provide training to refuge personnel on operation and maintenance needs of the system. O&M manuals shall be provided to the refuge personnel.
6. All workmanship and function of the system shall be warranted for one year. All equipment warranties shall be provided to the Refuge personnel upon completion of the work.
7. Provide to the Service a one-year maintenance contract covering system components and operability.
E. HVAC system installation requirements:
1. All ductwork, equipment, and system installation shall be performed per industry standards and NECC code requirements.
2. Any installation through walls or ceilings shall be patched and painted by the contractor to match existing.
3.0 Material Submittals
A. Material submittals consisting of manufacturer's product information shall be provided for Government approval before any materials are installed on this project.
4.0 End Results/Deliverables
A. Provide and install all materials required to install the HVAC system. Upon completion of the installation, the HVAC system shall be fully operational. Provide all Operations and Maintenance Manuals to the Refuge, including warranty information on the parts.
B. Upon completion of the project, all work areas shall be free of rubbish and debris. All old radiant heating equipment will be removed, disposed, and recycled per federal and state laws.
5.0 Special considerations
1. Technical / government liaison for this contract is the USFWS Facilities Manager, Cris Dippel located at the HQ building, 307-203-6798. Normal working hours for Facility Staff are from 7:00 AM to 3:30 PM Monday through Friday except for Government holidays and special events.
2. Contractor allowable work hours are 7AM to 6:00 PM Monday through Friday. Weekend work is acceptable from 8:00 am to 6:00 pm.
3. Building shall be occupied by refuge personnel through-out the contract period. Coordination of work with refuge staff will be necessary.