This document is a Statement of Work (SOW) for a federal contract opportunity to provide professional land surveying services to support the subdivision of two existing school parcels in Summerton, South Carolina into two new parcels for the National Park Service.
The SOW details the specific survey tasks required, including recovering and confirming the boundaries of the existing parcels, marking the proposed new parcels with permanent monuments, and providing recordable plats, legal descriptions, and digital survey and mapping data. The contractor must have a Registered Professional Land Surveyor in South Carolina, and the work must be completed within 45 days after a kickoff meeting. The government will provide the survey control points and coordinate the initial site walkthrough. The contractor is responsible for quality control, coordinating access with the current property owners, and avoiding any damage to archaeological or cultural findings. Pricing is requested as a fixed cost per site, with an additional cost per monument point if needed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_BRVB_RFQ_140P2124Q0338_0001.pdf | ||
| Sol_140P2124Q0338_Amd_0001.pdf | ||
| B03_140P2124Q0338_BRVB_Survey_WD.pdf | ||
| Sol_140P2124Q0338.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW, BRVB SC Land Surveying Services Page 1 of 10
National Park Service (NPS) Request for Surveying Services
Provide professional land survey services to support the subdivision of an existing single parcel of land into two new parcels at two proximate school sites. The initial intent is to contract both sites at the same time. An additional cost item or factor has been added to the cost/bid sheet should these surveys not be performed sequentially or contemporaneously.
Brown v. Board of Education National Historical Park
Site 1 Old Summerton High School
12 South Church Street (US 301), Summerton, Clarendon County, SC 29148 Latitude: 33°36'24.5"N., Longitude: 80°21'14"W (WGS84)
Site 2 Old Scotts Branch High School
1102 4th Street, Summerton, Clarendon County, SC 29148 Latitude: 33°36'34.5"N., Longitude: 80°21'31"W (WGS84)
Table of Contents
I. BACKGROUND PROJECT INFORMATION/LIMITS OF SURVEY:
II. PROJECT DETAILS:
PERFORMANCE PERIOD AND SCHEDULE:
CONTRACTOR’S PROJECT STAFF:
STANDARD SURVEY TASKS:
SURVEY STANDARDS OF CARE:
SURVEY CONTROL:
DELIVERABLES:
ELEMENTS OF SURVEY PLAT:
III. POINTS OF CONTACT:
IV. OTHER CONTRACT DETAILS:
CONFIDENTIALITY:
QUALITY CONTROL:
INSPECTION AND ACCEPTANCE:
ARCHAEOLOGICAL AND CULTURAL FINDINGS:
V. COST WORKSHEET:
SOW, BRVB SC Land Surveying Services Page 2 of 10
I. BACKGROUND PROJECT INFORMATION/LIMITS OF SURVEY:
Site 1: (Summerton HS):
The National Park Service (NPS) would like to acquire an approximately 1.37-acre portion from within a larger parent parcel that is approximately 8.13 acres in size.
The parent parcel to be subdivided is located at 12 South Church Street, Summerton, South Carolina, near the Southwest corner of the intersection of South Church Street (US301), and Larry King, Jr. Highway.
The current tax parcel ID of the parent parcel is 078-11-01-004-00.
Clarendon County Assessor Parcel Specific Link:
https://qpublic.schneidercorp.com/Application.aspx?AppID=795&LayerID=11833&PageTypeID=1&PageID=57 31&Q=1233751879&KeyValue=078-11-01-004-00
This project involves recovering and confirming the boundary of the parent parcel, and then marking the proposed NPS lot with approximately ten new exterior corners with iron rebar or pipe with aluminum caps in soft surfaces, or drilling/hammering PK type nails and washers in hard surfaces. There are also two existing iron pipes along the line common to the original parent parcel that will need to be recovered. If these pipes are no longer in place, or damaged, they are to be monumented as well.
Proposed lot shown on 2021 Aerial Proposed lot shown on 2013 Survey https://qpublic.schneidercorp.com/Application.aspx?AppID=795&LayerID=11833&PageTypeID=1&PageID=5731&Q=1233751879&KeyValue=078-11-01-004-00 https://qpublic.schneidercorp.com/Application.aspx?AppID=795&LayerID=11833&PageTypeID=1&PageID=5731&Q=1233751879&KeyValue=078-11-01-004-00
SOW, BRVB SC Land Surveying Services Page 3 of 10
Site 2: (Scotts Branch High School):
The National Park Service (NPS) would like to acquire an approximately 2.67-acre portion from within a larger parent parcel that is approximately 5.96 acres in size.
The parent parcel to be subdivided is located at 1102 4th Street, Summerton, South Carolina, on the Northwest corner of the intersection of Larry King, Jr. Highway, and 4th Street.
The current tax parcel ID of the parent parcel is 078-07-04-005-00.
Clarendon County Assessor Parcel Specific Link:
https://qpublic.schneidercorp.com/Application.aspx?AppID=795&LayerID=11833&PageTypeID=1&PageID=57 31&KeyValue=078-07-04-005-00
This project involves recovering and confirming the boundary of the parent parcel, and then marking the proposed NPS lot with approximately six new exterior corners with iron rebar or pipe with aluminum caps in soft surfaces, or drilling/hammering PK type nails and washers in hard surfaces. There are also two existing corners along the line common to the original parent parcel that will need to be recovered. If these corners are no longer in place, or damaged, they are to be monumented as well.
Proposed lot shown on 2021 Aerial
Project Goal:
The primary purpose of this project is to physically mark, monument, and provide a recordable legal description describing the perimeter of the area to be conveyed to the United States of America and provide, both a hardcopy recordable and digital boundary or perimeter survey, and a detailed digital planimetric map of same.
https://qpublic.schneidercorp.com/Application.aspx?AppID=795&LayerID=11833&PageTypeID=1&PageID=5731&KeyValue=078-07-04-005-00 https://qpublic.schneidercorp.com/Application.aspx?AppID=795&LayerID=11833&PageTypeID=1&PageID=5731&KeyValue=078-07-04-005-00
SOW, BRVB SC Land Surveying Services Page 4 of 10
The National Park Service as an agency of the United States Government is considered exempt from state and local regulations and codes regarding land development. This subdivision may or may not conform to state and local rules and regulations. In addition, the severed buildings may no longer comply with international, state, or local building codes.
The selected contractor will not assume any liability in this regard. They will however remain subject to the minimum state surveying standards as well as any work detailed herein.
II. PROJECT DETAILS:
PERFORMANCE PERIOD AND SCHEDULE:
Once the government and the selected firm (contractor) agrees to the price communicated for the work that is to be completed as described within this document, the contractor can begin the preliminary work. There will be an on-site kick off meeting with the contractor, NPS Lands, and school staff to finalize the corner locations prior to field work and final monumentation.
All final work shall be completed, and the described products delivered to the government no later than 45 days after the kick-off meeting.
Draft deliverables shall be submitted electronically to the government’s technical POC listed in Section III for review within 30 days of the begin of work. The reviewer will provide approval or request for changes within 7 days of receipt of the draft documents.
CONTRACTOR’S PROJECT STAFF:
The contractor’s staff must include an individual who is a Registered Professional Land Surveyor in South Carolina and fully qualified to perform land surveys, prepare legal descriptions, and comply with all applicable federal, state, and local laws. This person shall be the individual that is responsible and in-charge of the land survey work and all land survey decisions.
STANDARD SURVEY TASKS:
The contractor will provide all labor, equipment and supplies necessary to complete a boundary survey as identified herein unless otherwise noted. Specific tasks noted below will be completed as part of this project:
1. Landowner Contacts (complete prior to field work)
a. Contact the NPS park contact as well as school staff to provide times and dates of entry and coordinate any logistics regarding physical access to the project area (reference Section III for contact information).
b. Contact all applicable adjoining private property owners and obtain permission for entry if needed.
SOW, BRVB SC Land Surveying Services Page 5 of 10
c. Contact the local utility line location services (811). Please request that markings on hard surfaces be minimized to the greatest extent possible.
2. Records Research Contractor is responsible for conducting the necessary research required to complete the tasks listed herein. To the extent available, NPS will provide land title, survey records, maps or other documents currently in the possession of NPS related to the project area.
3. Investigate Boundary Line Evidence
a. The character and location of evidence of possession or occupation along the perimeter of the surveyed property, both by the occupants of the surveyed property and by adjoiners, observed in the process of conducting the fieldwork.
b. Without expressing a legal opinion as to the ownership or nature of the potential encroachment, the evidence, location and extent of any conflicting boundary evidence related to record title documents.
c. The location, size, character, and type of any monuments found during the fieldwork, including legislated park boundary monuments and private property boundary monuments.
d. The location, description, and character of any lines or natural features that appear to delineate or control the boundaries of the surveyed property (i.e. fences, walls, rivers).
4. Preliminary Marking or Staking NPS and school staff will meet on-site with contractor to preliminarily mark the proposed new property corners with stakes or flagging prior to installing and surveying of the semi-permanent monuments. This step is critically important as part of the new boundary runs between two existing buildings that are close to each other. NPS wants to ensure sufficient access for maintenance equipment along this portion of the new boundary.
5. Boundary Surveying and New Survey Monuments Monuments will be established at every change in direction along the perimeter of the new parcel to be established. These new monuments will be at a minimum a ¾ inch (#6) diameter iron rod or rebar, a minimum of 30 inches long with an aluminum cap to be provided to the surveyor by NPS. For hard surfaces a 2” or longer Parker Kalon or MagNail type nail with washer can be substituted.
6. Recordable Hardcopy Plat and Legal Description of New Parcel Contractor will provide two signed sealed copies of both a hardcopy plat and legal description of the new parcel complying with State and local laws and suitable for recording and use within an instrument of conveyance.
7. Digital Boundary Data Contractor will provide the boundary data used to create the hardcopy plat and legal description in both an Adobe PDF, and an AutoCAD drawing format.
8. Digital Planimetric Mapping Contractor will digitally map planimetric features that are both visible and lie above ground. Some typical features include building outlines, sidewalks, roads, alleys, driveways, ramps, steps, fire hydrants, catch basins, storm sewers, manholes, headwalls, signs, antennas, water bodies, landmark trees or groups of vegetation, curbs, pads, parking lots and striping, utility valves and meters, power poles, etc. The planimetric data is to be provided in a separate AutoCAD drawing, as well as a formatted PDF plot of this data.
SOW, BRVB SC Land Surveying Services Page 6 of 10
SURVEY STANDARDS OF CARE:
1. Other Requirements and Standards of Practice - In addition to any standards set forth herein, this survey will comply with minimum standards of surveying for the State of South Carolina. As noted earlier, the contractor will not be held liable should the new boundary not conform to state and local regulations, nor if any severed improvements no longer comply to code.
2. Measurement Standards - The acceptable relative positional accuracy of the survey is the same as identified in the current version of Section C, NSPS Classifications and Accuracy Standards for Property Surveys.
SURVEY CONTROL:
All reported horizontal distances will be based on ground measurements in either U.S. or International Feet at the discretion of the surveyor or as required by law. The basis of bearings for the project is at the discretion of the surveyor. Both the units and basis of bearings will be noted on the plat.
At least two survey monuments (existing or new) within the project extents will serve as “master” control points. These can be existing property corner monuments or NGS monuments. Both will be described and referenced on the final plat in South Carolina State Plane Grid Coordinates, FIPS 3900, NAD 83, U.S. Survey Feet. The combined scale factor from grid to ground will also be noted. These points should be located on opposite sides of the project area if possible.
DELIVERABLES:
All deliverables and products created under this project including such items certified plats of survey, field notes and research documents used to produce this survey and descriptions are considered property of the National Park Service, U.S. Department of the Interior.
1. Two hard copies mylar land survey plat will be prepared on an 18”x24” (Architectural C) or 24”x36” (Architectural D) map sheet. The actual size and format will be based on any state or local requirements as well as the surveyor’s professional opinion as to the appropriate degree of precision to convey the required information.
2. A digital high resolution PDF file of the survey plat and legal description.
3. A digital CAD file of the survey plat in AutoCAD DWG format.
4. A digital high resolution PDF file of the planimetric features within and immediately adjacent to the new parcel boundary.
5. A digital CAD file of these planimetric features in AutoCAD DWG format.
ELEMENTS OF SURVEY PLAT:
1. The evidence and locations gathered, and the monuments and lines located during the fieldwork pursuant to Section II above, with accompanying notes if deemed necessary by the surveyor or as otherwise required as specified below.
2. Boundary, descriptions, dimensions, and closures:
a. A full description of all found and set monuments, including artificial and natural
SOW, BRVB SC Land Surveying Services Page 7 of 10 monuments or features.
b. The point of beginning, the remote point of beginning or point of commencement
(if applicable) and all distances and directions identified in the record description of the surveyed property (and in the new description, if one was prepared). Where a measured or calculated dimension differs from the record by an amount deemed significant by the surveyor, such dimension shall be shown in addition to, and differentiated from, the corresponding record dimension. All dimensions shown on the survey and contained in any new description shall be ground dimensions unless otherwise noted.
c. The directional, distance and curve data necessary to compute a mathematical closure of the surveyed boundary. A note if the record description does not mathematically close. The basis of bearings and, where it differs from the record basis, the difference.
d. The relationship of the boundaries of the surveyed property with its adjoiners (e.g., contiguity, gaps, overlaps), where ascertainable from documents provided to or obtained by the surveyor and/or from field evidence gathered during the process of conducting the fieldwork.
e. When, in the opinion of the surveyor, the results of the survey differ significantly from the record, or if a fundamental decision related to the boundary resolution is not clearly reflected on the plat or map, the surveyor shall explain this information with notes on the face of the plat or map.
f. Note the area of the property as surveyed in acres to the nearest hundredth (0.01).
Parcels less than 0.01 acres will be reported in square feet.
g. A note on the face of the plat or map explaining the site conditions that resulted in a Relative Positional Precision that exceeds the maximum noted above under Measurement Standards.
h. The survey control point coordinate pairs, datum and combined scale factor from ground to grid.
3. Map layout elements:
a. Title block with project name, project location information, date of the survey, and the signature and seal of the licensed surveyor in responsible charge.
b. Name and address of the contractor and any subcontractor.
c. Bar and numeric scale, legend defining map point and line symbols and north arrow.
4. The following items shall also be included on the plat.
a. A table indicating the northing and easting coordinate pairs of all found and set monuments. The datum to be used is noted above under Survey Control.
b. Names of adjacent owners.
All preliminary deliverables are to be provided to the technical point of contact.
SOW, BRVB SC Land Surveying Services Page 8 of 10
All final deliverables will be provided to:
Annabeth Purcell National Park Service Land Resources Program Center, 5th Floor 100 Alabama Street SW, Bldg 1924 Atlanta, GA 30303-8701
III. POINTS OF CONTACT:
CONTRACTUAL:
Sal Elrubaie, LS, PSM Regional Professional Land Surveyor Land Resources Program Office (LRPO) Interior Regions 2 (South Atlantic - Gulf), and 4 (Mississippi Basin - LA, MS) National Park Service 2975 Horseshoe Drive South, Suite 800, Naples, FL 34104 salman_elrubaie@nps.gov 239-944-0576
TECHNICAL POINT OF CONTACT:
Sal Elrubaie, LS, PSM (Same information as above)
SCHOOL DISTRICT CONTACT (CURRENT OWNER OF PARENT PARCEL):
Arthur Moyd, Vice Chair of Clarendon County School Board 803-460-3888
PARK CONTACT:
James Williams, Superintendent 1515 SE Monroe Street Topeka, KS 66612 785-817-1843
IV. OTHER CONTRACT DETAILS:
CONFIDENTIALITY:
The information developed under this contract is the property of the U.S. Government and will remain in strict confidence.
SOW, BRVB SC Land Surveying Services Page 9 of 10
QUALITY CONTROL:
In accordance with the FAR Sections 36.609-2(b) and 52.236-23 the Contractor is responsible for Quality Control, which includes ensuring the technical accuracy, completeness, and correctness of the work associated with this land survey contract, including the coordination and management of all subcontractors (if applicable). The Contractor shall accomplish a Quality Control Review of all deliverables prior to submittal to NPS.
INSPECTION AND ACCEPTANCE:
NPS park staff and the contractor’s representative will coordinate and conduct a final walk-through of the project area prior to the end date of the contract. The purpose of this walk-through is to provide park staff with a final visual inspection of the location and physical characteristics of all boundary markers found or placed as a result of this survey.
All draft deliverables will be provided to the technical point of contact in a draft format for review and approval prior to the end of the contract date as noted above under Performance Period and Schedule.
ARCHAEOLOGICAL AND CULTURAL FINDINGS:
NPS is responsible for all required NEPA investigations prior to survey work. If the contractor or subcontractor discovers archaeological or cultural artifacts during the course of field work, immediately contact the technical or park contact listed in Section III.
SOW, BRVB SC Land Surveying Services Page 10 of 10
V. COST WORKSHEET/SUMMARY:
Although there is a breakdown of cost per site, it is the intent of the National Park Service to contract both sites concurrently to the same contractor.
Both sites performed contemporaneously or sequentially:
Site 1: (Summerton High School):
FIXED COST OF SERVICES: USD$_____________
COST OF EACH ADDITIONAL MONUMENT POINT (if needed): USD$_____________
Site 2: (Scotts Branch High School):
FIXED COST OF SERVICES: USD$_____________
COST OF EACH ADDITIONAL MONUMENT POINT (if needed): USD$_____________
If each site is performed at a different time:
Site 1: (Summerton High School):
FIXED COST OF SERVICES: USD$_____________
COST OF EACH ADDITIONAL MONUMENT POINT (if needed): USD$_____________
Site 2: (Scotts Branch High School):
FIXED COST OF SERVICES: USD$_____________
COST OF EACH ADDITIONAL MONUMENT POINT (if needed): USD$_____________
| I. Background Project Information/Limits of Survey: |
| II. Project Details: |
| PERFORMANCE PERIOD AND SCHEDULE: |
| CONTRACTOR’S PROJECT STAFF: |
| STANDARD SURVEY TASKS: |
| SURVEY STANDARDS OF CARE: |
| SURVEY CONTROL: |
| DELIVERABLES: |
| ELEMENTS OF SURVEY PLAT: |
| III. Points Of Contact: |
| IV. Other Contract Details: |
| Confidentiality: |
| Quality Control: |
| Inspection and Acceptance: |
| Archaeological and Cultural Findings: |