About this file
This document is a Statement of Work (SOW) for the service and replacement of three overhead doors on a vehicle storage building at the Garrison Dam National Fish Hatchery in Riverdale, North Dakota. The contractor must be appropriately licensed and certified in North Dakota to perform this work, which needs to be completed by October 1, 2024. The contractor will procure and install three 10'2"W x 9'H Raynor Aspen, 200 model, white, flush plank panel, insulated overhead doors. The doors will be manually operated and must meet specific requirements for track, seal, and window configuration. The government will provide access to restrooms, electricity, and water for the contractor. Acceptance of the work is contingent upon the designated U.S. Fish and Wildlife Service representative's approval. The primary and secondary technical coordinators are identified, along with the contracting point of contact.
The related federal contract opportunity is Solicitation Number 140FS224Q0206, "ND-GARRISON DAM NFH-REPLACE SHOP DOORS," issued by the Department of the Interior Fish and Wildlife Service.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140FS224Q0206.pdf | ||
| B03_Wage_Determination_2015-5383_rev_22_05012024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (2024 6 27)
Service
Replace Overhead Doors for vehicle building
1. General:
1.1 Garrison Dam National Fish Hatchery (NFH), 530 Hatchery Rd, Riverdale, ND 58565.
Service, Replace three overhead doors on Vehicle Storage Building
1.2 Purpose/End Application: This project is to install new overhead doors for the vehicle buildings.
1.3 Contractor Qualifications: The contractor must be appropriately licensed and certified within the state of North Dakota to install the garage doors.
1.4 Other: The contractor must follow all associated regulations and laws including:
Municiple, Federal, State, and County.
2. Place of Performance and Period of Performance
2.1 Work is to be performed at Garrison Dam National Fish Hatchery, 530 Hatchery Rd, Riverdale, ND 58565.
2.2 This project needs to be completed prior to October 1, 2024.
2.3 Normal duty hours Monday thru Friday 7:30 a.m. - 4:00 p.m. In the event of emergencies, Contractor shall provide contact information.
2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day).
3. Scope
3.1 Contractor shall install three 10’2”W x 9’H Raynor Aspen, 200, white, flush plank panel, insulated with an R-value of 18, standard interior lock, normal headroom track that requires 14” of headroom, 2” angle mount track, 2” thick door, self-contained neoprene head and jamb seal, 2
ea. insulated ranch windows in the 2nd from top section.
4. Deliverables and/or Delivery Schedule: (for extended list a bid schedule and/or use of line item detail on the PR is recommended)
4.1 The contractor shall procure and install three 10’2”W x 9’H Raynor Aspen, 200, white, flush plank panel, insulated with an R-value of 18, standard interior lock, normal headroom track that requires 14” of headroom, 2” angle mount track, 2” thick door, self-contained neoprene head and jamb seal, 2 ea. insulated ranch windows in the 2nd from top section.
4.2 The contractor shall procure and install the three 10’2”W x 9’H doors are manual operated.
5. Data Management Plan (DMP) N/A
6. Government-Furnished Equipment (GFE) / Government-Furnished Information
(GFI)
6.1 Garrison Dam NFH will provide restrooms, electricity, and water for the contractor to using while the contracted work is being completed.
6.2 Identify any limitations. N/A
7. Evaluation and Acceptance
7.1 The contractor will be evaluated as detailed herein. Government acceptance is contingent upon: designated U.S. Fish and Wildlife Service representative(s) determining the work to be acceptable and in good working order.
8. Quality Control/Quality Assurance:
8.1 For commercial supplies reference clauses for inspection and acceptance. Where appropriate, QC will be maintained according to industry standards and made available to the agency with the contractor’s proposal.
8.2 Identify and detail measures for assessing quality control and acceptance; each requirement is unique and a table format is visually friendly and may be desirable.
9. Technical Coordinator:
9.1 Primary individual responsible for the final product or service.
Aaron Von Eschen Project Leader Garrison Dam National Fish Hatchery Complex
530 Hatchery Rd Riverdale, ND 58565.
Office: 701-654-7451 aaron_voneschen@fws.gov
9.2 Secondary individual responsible for the final product or service.
Kristopher “Kris” Johnson Facility Management Coordinator (FMC) Asset Management Coordinator (AMC) U.S. Fish and Wildlife Service Fish and Aquatic Conservation (FAC) 1380 South 2350 West Vernal, UT 84078 Cell: 435-299-5150 Office: 435-789-0351 ext. 16 kristopher_b_johnson@fws.gov
CONTRACTING POC: Renee Babineau, Contract Specialist, (404) 679-7349, Renee_Babineau@fws.gov mailto:aaron_voneschen@fws.gov mailto:kristopher_b_johnson@fws.gov
| STATEMENT OF WORK (2024 6 27) |
| 1. General: |
| 2. Place of Performance and Period of Performance |
| 2.1 Work is to be performed at Garrison Dam National Fish Hatchery, 530 Hatchery Rd, Riverdale, ND 58565. |
| 2.2 This project needs to be completed prior to October 1, 2024. |
| 2.3 Normal duty hours Monday thru Friday 7:30 a.m. - 4:00 p.m. In the event of emergencies, Contractor shall provide contact information. |
| 2.4 Non-duty hours include week nights, weekends, and Government holidays (New Year’s Day, Martin Luther King JR.s’s Birthday, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, Christmas Day). |
| 3. Scope |
| 4. Deliverables and/or Delivery Schedule: (for extended list a bid schedule and/or use of line item detail on the PR is recommended) |
File details come from the government source that posted it. Updated .