A04_20230612_SOW_GridleyLake-Commercially_available_vault_toilet.docx
DOCX document 35 KB Posted
- Attached to
- GAOA: GRIDLEY LAKE VAULT TOILET
- Solicitation number
- 140L3923Q0135
About this file
This scope of work document outlines requirements for the installation of a new vault toilet at the Gridley Lake site in Nevada. Key details include the contractor designing and constructing a concrete or masonry vault toilet meeting all applicable accessibility and permitting standards, including obtaining approval from the Nevada Division of Environmental Protection. The contractor must also develop construction documents such as drawings, specifications, and cost estimates for review by the Bureau of Land Management. Additional requirements include a two year warranty on materials and workmanship, as-built drawings and operation manuals upon completion, and coordination with the BLM for construction oversight and inspections. The estimated performance period is from October 2023 through June 2024. The selected bidder will provide the best value solution to the government based on their proposed design and process for satisfying the scope of work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B03_Wage_Det_NV20230031.pdf | ||
| Sol_140L3923Q0135.pdf | ||
| A06_20230612_Attachment1-Parts.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
GAOA- Gridley Lake Vault Toilet Installation Bureau of Land Management – Winnemucca District Pine Forest Range, Nevada June 2023 Part 1 General Information
INTRODUCTION AND BACKGROUND
The Government requires a vault toilet to be installed at the Gridley Lake Vault Toilet Site. The task involves any necessary certification, administrative, and construction tasks associated with the toilet and site design necessary including obtaining any permits required from the Nevada Division of Environmental Protection (NDEP) for the installation of the Gridley Lake Vault Toilet. The vault toilet location is at approximately 41.749434° N, -118.837192° W, located approximately ¼ mile to the east of Knott Creek Road 9.5 miles south of Highway 140, Humboldt County, Nevada.
The vault toilet will replace a former vault toilet at the site that has been removed. The vault toilet was formerly known as the Knott Creek Vault Toilet. It has been renamed the “Gridley Lake Vault Toilet” to avoid confusion with other locations and assets in the area. Attachments to this contract package using the name “Knott Creek Vault Toilet” may be considered the same site as “Gridley Lake Vault Toilet.”
Planning and Approach
A pre-bid site visit is not being offered to contractors. The Gridley Lake Vault Toilet is approximately an additional 120 miles from Winnemucca including travel on rough aggregate roads. The Contractor shall be responsible for evaluating the site.
Contractor shall perform all background investigation, analysis, and drawings, and permitting required to finish the project as described. Tasks will include but not be limited to:
· Conference Calls
· Site layout and Visual Resource Management submittals.
· Construction specifications.
· Obtaining permit for construction of the vault toilet from the State of Nevada
· Certification the structure meets site code requirements.
· Construction documents
· Construction, delivery, and installation of the vault toilet.
· Closeout documents
· Follow up assistance required by State of Nevada to provide the BLM with a permit to operate.
Vault Toilet Building requirements
The building shall include the following features and requirements:
· One toilet inside one enclosed room.
· Structure is constructed from concrete, or concrete masonry units. Prefabricated structures are acceptable.
· The vault toilet must meet ABA standards for outdoor settings. Additionally grading within 15-foot access to the vault toilet such as a firm and stable surface. Vault Toilet for outdoor settings references other chapters of the ABA code which must be met.
· Surface runoff drainage must be away from vault toilet building.
· The vault toilet must meet all Nevada Administrative Code requirements.
· The contractor must obtain a permit for construction of the vault toilet from NDEP before beginning construction.
· The contractor must obtain approval from the BLM COR before submitting the permit application.
· Vault toilet signage to be all gender. BLM to approve signage. BLM will provide example signs upon request.
· Vault toilet to conform to the US Forest Service 1991 In-Depth Design and Maintenance Manual for Vault Toilets. Restroom floor and vault impact zone must meet slope requirements.
· A sign must be included inside of the vault toilet building directing the public to not throw any waste into the vault.
· The vault must be a minimum of 1000 gallons and be accessible without entering the restroom enclosure.
· Vault access hatch must be lockable.
· Vault toilet to have chimney installed on south side of building to assist in airflow.
· The installation of new vault toilets is subject to Permanent Holding Tank permitting requirements through NDEP. Applicants are to fill out the Permanent Holding Tank application in order to submit plans and seek approval to construct and operate a holding tank. When construction has taken place, applicants must seek coverage under the corresponding General Permanent Holding Tank permit by completing the corresponding Notice of Intent (NOI) form.
Application instructions, materials and forms are available through NDEP at:
https://ndep.nv.gov/water/water-pollution-control/permitting/holding-tank-program.
Maintenance, repairs, modification and operation of all vault toilets must comply with General Permit for Domestic Sewage Discharges Associated with Permanent Holding Tanks (GNEVPHT09). Before bid submittal, contractor to coordinate and verify all requirements with the NDEP for all requirements before bid submittal. Informational only: The requirement for an alarm when the tank is filling is typically waived for vault toilets. A permit from NDEP for the vault toilet is required. The contractor will be responsible for obtaining this permit and any adjustments required by the NDEP to the contractor’s design. The contractor will not be additionally compensated for changes required by the NDEP. The task includes any revisions to the construction plans developed by the contractor and required by NDEP.
The construction documents shall include drawings signed by a professional licensed in the appropriate discipline, specifications, submittals required for the NDEP permit, a cost estimate, and a bid schedule. The professional must be licensed in the State of Nevada. Design drawings must include a site layout of the Gridley Lake Vault Toilet site showing the proposed vault toilet location and the setbacks required by the NAC 445A for sewage facilities and design drawings for the proposed vault toilet.
Permitting:
As the site disturbance does not exceed 1 acre in size approval of the Stormwater Prevention Pollution Prevention Plan (SWPPP) is anticipated to not be needed from the Nevada Division of Environmental Protection (NDEP). If concrete work is to be done onsite the contractor will need to use a concrete washout.
SUBMITTAL REVIEW
A. Submittals for Review: Contracting Officer will review each submittal, and approve, or take other appropriate action.
1. Processing Time: Allow enough time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Contracting Officer's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.
a. Initial Review: Allow 10 calendar days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Contracting Officer will advise Contractor when a submittal being processed must be delayed for coordination.
b. Visual resources management approval for color scheme must be submitted at 10% design review.
B. Submittals for Information: Contracting Officer will acknowledge receipt and review. See below for actions to be taken.
C. Contracting Officer's actions will be reflected by marking each returned submittal using virtual stamp on electronic submittals.
D. Contracting Officer's and consultants' actions on items submitted for review:
1. Authorizing purchasing, fabrication, delivery, and installation:
a. "Approved", or language with same legal meaning.
b. "Approved as Noted, Resubmission not required", or language with same legal meaning.
1) At Contractor's option, submit corrected item, with review notations acknowledged and incorporated.
c. "Approved as Noted, Resubmit for Record", or language with same legal meaning.
1) Resubmit corrected item, with review notations acknowledged and incorporated.
2) Non-responsive resubmittals may be rejected.
2. Not Authorizing fabrication, delivery, and installation:
a. "Revise and Resubmit".
1) Resubmit revised item, with review notations acknowledged and incorporated.
b. "Rejected".
1) Submit item complying with requirements of Contract Documents.
E. Contracting Officer's and consultants' actions on items submitted for information:
1. Contracting Officer will review each submittal and will not return it, or will return it if it does not comply with requirements. Contracting Officer will forward each submittal to appropriate party.
2. Items for which no action was taken:
a. "Received" - to notify the Contractor that the submittal has been received for record only.
3. Items for which action was taken:
a. "Reviewed" - no further action is required from Contractor.
INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer.
B. Field quality-control reports.
C. Sample warranty.
GOVERNMENT PROVIDE MATERIALS
The Government will provide the following after award:
Proposed site layout with major features and dimensional reference, .PDF and .DWG electronic files (Att-1 PDF sheet set included with SOW, 3 pages with one being a vicinity map) For informational purposes, the BLM has provided site and vicinity maps, and an example of a site plan with setbacks. The contractor will be the party responsible in charge and must develop their own drawings for site plans. The location maps may be used as figures; however, the contractor will become responsible for the quality and accuracy of any drawings they decide to use.
· USDA operation and maintenance manual
· Letter from Jean Black, staff hydrologist indicating that groundwater modeling indicates that groundwater is not expected to be present at the vault toilet location.
· Site photos from a site visit
DELIVERABLES
Conference Call (within 10 business days after Award):
If the Contractor deems it necessary, initiate and conduct conference calls with the Government’s Contracting Officer’s Representative and a separate call with the Nevada Division of Environmental Protection assigned permit reviewer. The purpose of the call is to preview the project, interview the client on overall expectations for the project, review Government provided materials, and generally discuss plans for the design effort.
Reviews to be performed by the Government and subject to COR approval at the:
100% Construction Documents Provide one electronic copy (pdf) of Preliminary Conceptual Site Layout documents for Government review and submittal.
Final Construction Documents (2 business days after NDEP provides review comments):
If the NDEP requires design revisions, Provide one electronic copy (pdf) of Construction Documents for BLM submittal with the permit. The NDEP requires physical wet-stamped copies which the contractor will be responsible for providing without additional compensation.
· Civil:
· Proposed civil systems developed for the site.
· Civil/Site Drawings:
· Site Plan: A site plan showing existing facilities and proposed new vault toilet location, including locating and dimensioning building.
· Setback plan sheet. A sheet showing that the proposed site meets the setback requirements in NAC 445A
· Note to include a concrete washout area if concrete is used.
· Drawings. Drawings shall be created in AutoCAD (v2013 or newer) and be 11x17. All drawings shall also be combined into one PDF file.
· Operation and Maintenance Manual supplements if required
PERIOD OF PERFORMANCE
The estimated performance time for this task order is 275 calendar days.
| Estimated start date: | October 1st, 2023 |
| Required completion date: | June 30th, 2024 |
SPECIAL CONSIDERATIONS
- The contractor is responsible for obtaining approval from the BLM COR to have the vault toilet match the Visual Resource Management color schemes.
-All construction activities on site require BLM inspection. Contractor to provide written notice to BLM seven days advance for all construction activities.
-Contractor must meet directives NDEP permit requirements.
-Contractor not to install the vault toilet once the ground temperature falls below freezing.
Procurement: The government will select the bid which provides best value to the government based upon the proposed solution developed by the contractor.
FIELD QUALITY CONTROL
A. Field tests shall be witnessed by the Contracting Officer Representative.
B. Perform the following tests and inspections with the assistance of a factory-authorized service representative:
1. Visual Inspection: Conduct visual inspection prior to testing.
a. Inspection shall be based on completed record Drawings and system documentation.
2. Test equipment associated with the vault toilet including the ability for the doors to lock and unlock, the ability for the doors to open and close, and if used any electronic ventilation provided on the chimney.
CLOSEOUT SUBMITTALS
A. As-builts for the vault toilet as installed.
1. Supplements to the USDA Vault Toilet Operation and Maintenance Manual as required for the site specific vault toilet.
a. Provide a complete set of electronic (dwg) and physical planset as-builts to the contracting officer’s representative.
c. Provide construction and operation permit from the NDEP
d. Provide construction inspection log which will include:
1) Depth of overexcavation
2) Soil test reports if conducted.
3) Concrete test reports if conducted.
4) Contractor’s construction log and photos.
QUALITY ASSURANCE
A. Installer Qualifications: Personnel shall be trained and certified by manufacturer for installation of units required for this Project.
B. Contractor shall be responsible for remediating any issues with the vault toilet which prevents the BLM from obtaining a permit to operate the vault toilet from the NDEP.
WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace vault toilet and its ancillary equipment and components that fail in materials or workmanship within specified warranty period.
1. Warranty Extent: All equipment within the vault toilet and the vault toilet structure itself.
2. Warranty Period: Two years from date of acceptance by the Government.
ENCLOSURE:
PDF of Vicinity Map and Site Plan Prepared by BLM (3 Pages) PDF of site sketch with a few notes on NDEP requested information.
Photo Log Tom Scott Report from Jean Black:
Figure 1 Area Map Figure 2 Vicinity Map Attachment 3 Knott Creek Vault Toilet Geology Attachment 4 Knott Creek Vault Toilet area Attachment 5 Knott Creek NDWR Attachment 6 Knott Creek Vault Toilet Photo Log
File details come from the government source that posted it. Updated .