A04-20230609_SOW_Campground_Fence.pdf

PDF 121 KB Posted

Attached to
CHASSAHOWITZKA NWR Campground Fence Florida
Solicitation number
140FC124R0021
Issued by

About this file

This document outlines the scope of work for a fence construction project at the Chassahowitzka National Wildlife Refuge campground in Homosassa, Florida. The project requires construction of approximately 1,775 feet of fencing, including 6 feet tall vinyl privacy fencing along the eastern property boundary totaling 1,170 feet, and 4 feet tall barbed wire field fencing along the northern boundary of 605 feet. Materials needed are specified as vinyl fence panels and posts, field fencing and posts, and concrete to set the posts. Acceptance criteria is an inspection by the Crystal River National Wildlife Refuge project leader, with work to be completed within 60 days of task order issuance. The related federal contract opportunity is solicitation number 140FC124R0021 from the Department of the Interior Fish and Wildlife Service for the Chassahowitzka NWR Campground Fence project in Florida.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

CHASSAHOWITZKA NATIONAL WILDLIFE REFUGE

CAMPGROUND FENCE

7798 SOUTH SUNCOAST BLVD, HOMOSASSA, FL

I. GENERAL INFORMATION

The US Fish & Wildlife Service solicits proposals for the construction of a fence bordering the Chassahowitzka NWR’s campground property in Homosassa, Florida.

II. PROJECT LOCATION

Chassahowitzka NWR’s campground property is located at 7798 South Suncoast Boulevard, Homosassa, Florida 34446. The proposed fence will provide a visual and security barrier along the eastern boundary of the property and a security barrier along the northern boundary of the property. See attached map.

III. WORK SPECIFICATIONS

Project Description – The project requires the construction of a 1,775’ fence, including a vinyl fence along the property’s eastern boundary and a field fence along the property’s northern boundary.

The portion of the fence along the eastern boundary includes two segments, a 350’ segment that runs from the southern end of the boundary to the south end of a sound barrier wall and an 820’ segment that runs from the north end of the sound barrier wall to the northern end of the boundary. Fence construction along this boundary includes 6’ tall vinyl privacy fence panels on posts set in concrete. That portion of the fence along the northern boundary includes a single, 605’ segment. Fence construction along this boundary includes a 4’ tall wire, no-climb fence on round posts set in concrete.

Materials needed for the project include –

• Vinyl fence panels and posts sufficient to fence a 1170’ boundary.

• Field fencing and posts sufficient to fence a 605’ boundary

• Concrete to set posts

Material specifications –

Vinyl fence specifications –

• Color: Tan or wood grain

• Height: 6’

• Rails: 2 X 6

• Posts: 5 X 5

• Pickets: 6”

• Length: 1170’

Field fence specifications –

• Height: 4’

• Gage: 14 ga Class 3 galvanized woven field wire

• Posts 4” – 5” round line

• Gate posts: 5” – 6” corner

• Length: 605”

IV. ACCEPTANCE CRITERIA

The task shall be considered complete following an acceptable inspection of the fence by the Crystal River NWR Project Leader.

V. GOVERNMENT-FURNISHED PROPERTY OR INFORMATION

The Government shall furnish no equipment, property or supplies for this task order. No exceptions shall be granted.

VI. OTHER REQUIREMENTS OR PROVISIONS

A pre-site visit may be scheduled prior to award and must be attended by prospective vendor representative(s) to evaluate site conditions and answer pertinent questions.

VII. TIME SCHEDULE/PERIOD OF PERFORMANCE

The project shall be completed within 60 days following issuance of the task order and notification to begin work.

File details come from the government source that posted it. Updated .