Text version
Cameron Prairie Bldg Repairs (Hurricane Laura) Page 1 of 3
STATEMENT OF WORK
FOR THE
Bldg Repairs at Cameron Prairie National Wildlife Refuge
1428 Highway 27 Bell City, LA 70630-9618
Work Order: 2020338844 March 18, 2021
General:
The project consists of all work items required to repair the maintenance shop building located within the Southwest Louisiana Complex at Cameron Prairie NWR. The building is located within the refuge boundary. The needed building repairs due to Hurricane Laura are described below. There are no known lead-based paint or asbestos materials associated with these building. The contractor will submit a detailed proposal for all work required to complete the repairs outlined within this document and all other documents of this solicitation.
Prospective bidders are strongly encouraged to visit the site, inspect existing conditions, review work performance requirements, and make necessary measurements and investigations as may be required to develop accurate proposals. All site visits and work activities are to be coordinated and scheduled in advance with Glenn Harris, Deputy Project Leader, glenn_harris@fws.gov, phone number (337) 598-2216. Questions regarding the scope of work and technical matters shall be directed to Ronald Morse, FMC/ERFO Coordinator, ronald_morse@fws.gov , phone number (404) 679-7061.
Repairs to Maintenance Compound Shop Bldg:
The hurricane damage repairs needed consist of:
1. Replace the gutter downspout on the northeast corner of the building
2. Replace the eastern 1/3 roof panels above the mezzanine.
3. Replace all ceiling insulation in the mezzanine and open bay areas.
mailto:glenn_harris@fws.gov mailto:ronald_morse@fws.gov
Cameron Prairie Bldg Repairs (Hurricane Laura) Page 2 of 3
4. Replace all damaged & missing sheet rock and bat insulation in the enclosed office end of the bldg. (600 sqft).
5. Replace all sheetrock and taped finish in the maintenance office, bathroom, hall and breakroom.
6. Replace all interior insulation in the maintenance office, hall, bathroom and breakroom.
7. Remove and replace water closet.
8. Replace rubber cove base molding in the maintenance office, bathroom, hall and breakroom.
9. Remove and replace inoperable ceiling lights in the shop area, approx.. 24- 4’L X 1’W, 2 light fluorescent with LED.
10. Paint interior of building including the maintenance office, hall, bathroom and breakroom.
11. Remove and replace one exterior metal door -3’0” X 6’8”.
12. Prep, prime and paint 6 metal doors- 3’0” X 6’8”.
13. Prep, prime and paint 2 metal double exterior doors- 6’0” x 6’8”.
14. Remove and replace damaged metal siding on the gable ends.
15. Install new kitchen cabinets and countertop in breakroom. Reinstall existing appliances.
The contractor shall field verify all quantities and dimensions.
The contractor will provide all temporary facilities, portable toilets, dumpsters, and material and equipment storage necessary to complete this project and provide a safe work environment.
Perform work in accordance with all applicable Federal, State, Local codes, and
ICC.
The contractor will comply with OSHA guidelines, including but not limited to fall protection.
The contractor will comply with 29 CFR 1910.134: Respiratory Protection Standard.
The contractor will perform regularly scheduled safety meetings, weekly (minimum) and as required by scheduled work activity. The meetings will include hazards related to scheduled work activity and reinforce OSHA and all safety guidelines. The contractor will invite the FWS representative to all safety meetings.
The Refuge will not sign for or accept deliveries for the contractor.
Cameron Prairie Bldg Repairs (Hurricane Laura) Page 3 of 3
The contractor will not be allowed to use Refuge equipment or personnel.
The contractor will be responsible for the collection and disposal of all construction debris related to the project. The contractor will maintain a clean work site. Unless specified elsewhere, all materials and solid waste from the debris removal, work activities, and clean-up activities, shall become the property of the contractor and shall be removed, salvaged, recycled, or disposed of at a landfill or facility permitted for such waste. Debris and materials shall not be stockpiled for more than 10 calendar days without the permission of the Contracting Officer.
Work Items
1. The contractor will inspect every roof fastener and replace any rusted or underset, raised, stripped fasteners with new metal roof fasteners. The fasteners will be color matched to the existing remaining fasteners, galvanized, neoprene / metal washer. The contractor will check for loose or raised roof panels and if found, reset and refasten with new fasteners.
2. Prime and Paint Exterior Framing: The contractor will prime all building frames and roof purlins and exposed steel that have been installed during the replacement of damaged roofing with one (1) coat of high quality commercial grade epoxy primer and paint two (2) coats high quality commercial grade urethane or polyurethane paint that is compatible with the primer. Top coat shall have a superior UV resistance rating. Primer and top coat shall be from the same manufacturer. The contractor will submit product data to the Contracting Officer for approval. The contractor will submit color samples to the FWS representative. The new color will be selected by the FWS representative.
Acceptance and Close-Out Contractor will complete work items, site and building clean-up, disposal of all debris, remove all temporary facilities prior to a walk-thru inspection with the Contracting Officer’s Site Representative. The contractor will turn over all product / materials information used on this project and all executed product warranties at the walk-thru. If the refuge so desires, the contractor will turn over excess paint for future touch-up. Paint shall be in original manufacturer’s container, sealed in good condition for storage.
General: