13108_Sources Sought Notice_PM_Construct Transporter Erector Shelter.pdf
PDF 161 KB Posted
- Attached to
- 13108 Erector Shelter Minot Federal contract opportunity
- Solicitation number
- A030042
About this file
This Sources Sought Notice is for market research by the U.S. Army Corps of Engineers, Omaha District to identify potential prime construction contractors for a project at Minot Air Force Base, North Dakota. The project involves constructing a new approximately 2,600 SF pre-engineered metal building to serve as a heated vehicle storage facility for the Missile Handling Team (MHT) Complex, with an estimated construction value between $1M and $5M and primarily funded by Air Force Operation & Maintenance dollars.
Key submission requirements include a 12-page narrative demonstrating experience with similar construction projects within the last 8-10 years, specifically for prime contractors with a minimum single job bonding capability of $5M. Contractors must provide details on company information, CAGE/DUNS codes, business size certifications, project references, and experience with storage/maintenance facility construction, military installation work, and paving. The project will use a design-build delivery method with a 390-calendar day performance period, and the estimated construction contract award is planned for the fourth quarter of Fiscal Year 2025. Responses are due by 10:00 a.m. CDT on 1 April 2025, to be submitted via email to specified U.S. Army Corps of Engineers contacts.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This is a Sources Sought Notice and is for market research purposes only. THIS IS NOT A
REQUEST FOR PROPOSAL, QUOTATION OR BID. NO SOLICITATION IS CURRENTLY
AVAILABLE.
The U.S. Army Corps of Engineers, Omaha District is conducting market research to identify sources (Small Businesses and Other-than-Small Businesses) that have the knowledge, skills and capability to perform the work concerning the potential project(s) described below. Responses are requested only from: POTENTIAL PRIME CONSTRUCTION CONTRACTORS WITH COMPANY BONDING CAPABILITY (SINGLE JOB) OF AT LEAST $5M. The responses to this source sought announcement will be used by the Government to make appropriate acquisition decisions for this project.
Responses are to be sent via email to Kelly.C.Hopper@usace.army.mil and courtesy copy Jessica.L.Beckman@usace.army.mil no later than 10:00 a.m. CDT, 1 April 2025.
Questions or concerns surrounding small business matters can be sent to cenwo-sb@usace.army.mil. Please include the Sources Sought Notice Identification Number in the Subject line of any email submission.
Magnitude of Construction:
Disclosure of the magnitude of construction, as prescribed in FAR 36.204 and DFARS 236.204, is between $1M and $5M. Project is a FSRM project and will primarily be funded with Air Force Operation & Maintenance (O&M) dollars.
Project Location and Description: Minot AFB, ND This upcoming solicitation will be executed using a design-build (DBB) project delivery method, which will require the contractor to provide the Government with a complete facility and warranty based on the Request for Proposal (RFP).
Requirement includes work components at the Missile Handling Team (MHT) Complex on Minot Air Force Base (MAFB), North Dakota (ND):
Project will construct a new approximately 2,600 SF pre-engineered metal building that will serve as a heated vehicle storage facility. Structure will consist of strip footings, factory finished and insulated metal wall panels, and standing metal seam roof. Installation of electrical, communication, gas, water, and sewer utility connections, along with NIPR and SIPR communications systems may be required. Associated site features and paving will also be required.
Facility will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01, General Building Requirements and UFC 1-200-02, High Performance and Sustainable Building Requirements. Each facility must be compatible with applicable DoD, Air Force, aircraft, and base design standards. In addition, sustainable and maintainable construction materials and techniques shall be used where cost effective and/or where specified. This project will comply with Department of Defense Antiterrorism/Force Protection requirements per Unified Facilities Criteria 4-010-01 (as applicable).
Special construction and functional requirements: Facility will require the establishment of a freezone through the use of temporary fencing to separate this project’s site with the wider MHT Complex.
Project Period of Performance:
Approximately 390 calendar days from construction NTP but may vary depending on individual component of work.
Submission Details:
All interested, capable, qualified (under NAICS code 236210– Industrial Building Construction) and responsive contractors are encouraged to reply to this market survey request. Interested PRIME CONTRACTORS ONLY should submit a narrative demonstrating their experience in construction projects/requirements of similar nature for each facility as described above.
Narratives shall be no longer than 12 pages. E-mail responses are required.
Please include the following information in your response/narrative:
• Company name, address, and point of contact, with (h)is/her phone number and email address
• CAGE Code and DUNS Number
• Statement certifying business size such as WOSB, SDVOSB, etc. to include any official teaming arrangements as a partnership or joint venture
• Details of similar projects within the last 8 years and state whether you were the Prime or
Subcontractor
• Start and end dates of construction work
• Project references (including owner with phone number and email address)
• Project cost, term, and complexity of job
• Information on your bonding capability - SPECIFICALLY IDENTIFY
PERFORMANCE AND PAYMENT BONDS CAPACITIES
Details on similar projects with scope and complexity should identify experience with the following within the past 10 years.
• Construction of similar storage or maintenance facilities (steel, precast, or masonry construction, etc.)
• Construction of asphalt and concrete paving in support of maintenance facilities.
• Construction/renovation of facilities near a DoD Restricted/Controlled Area.
• Construction/renovation of facilities on a DoD Military Installation.
Responses will be shared with Government personnel and the project management team on a need-to-know basis, but otherwise will be held in strict confidence.
PLEASE NOTE: AT THIS TIME, WE ARE ONLY INTERESTED IN RESPONSES FROM
COMPANIES WHO HAVE THE ABILITY TO BE PRIME CONTRACTORS WITH
BONDING CAPABILITY (SINGLE JOB) OF AT LEAST $5M.
ESTIMATED CONSTRUCTION CONTRACT AWARD WILL BE FOURTH QUARTER OF
FISCAL YEAR 2025.
Telephone inquiries will NOT be accepted.
File details come from the government source that posted it. Updated .