A03_SAP_JA_Brand Name_Nitrogen Generator.pdf

PDF 689 KB Posted

Attached to
SOUTH-TEK NITROGEN GENERATION SYSTEM Federal contract opportunity
Solicitation number
M67004-23-Q-0072
Issued by
United States Marine Corps

About this file

This memorandum provides a justification for using other than full and open competition to procure a nitrogen generator system from South-Tek Systems on a sole-source basis under the simplified acquisition threshold. The United States Marine Corps requires the nitrogen generator system as identified in Program of Record documents and Fleet Marine Force training has already been conducted on this specific item. South-Tek Systems is designated as the original equipment manufacturer for replacement and procurement according to approved facilities impact reports. The related solicitation will be for the South-Tek nitrogen generation system with an identification number of M67004-23-Q-0072 and will be issued by the United States Marine Corps on a sole-source basis to the incumbent, South-Tek Systems. Supply and maintenance support have been established for this item.

View the file

Other files for this federal contract opportunity

Other files attached to SOUTH-TEK NITROGEN GENERATION SYSTEM, newest first.
File Type Posted
D01_M6700423Q0072_RFQ_Nitrogen_Generation_System.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Controlled by: DON, USMC, I&L HCA Controlled by: MARCORLOGCOM MCFCS CUI Category(ies): PROCURE Limited Dissemination Control: DISPLAY ONLY POC: MARCORLOGCOM Contracts Department

Justification for Other than Full and Open Competition FAR Part 13 Acquisitions under the SAT

V 1. ( 202 )

MEMORANDUM TO THE FILE

Subj: JUSTIFICATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION FOR A FAR PART

13 ACQUISITION UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND:

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement (or portion of the requirement to be sole-sourced) is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED ON THE FOLLOWING (select all that apply):

A. ___ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. ___ RESTRICTIVE RIGHTS. The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

2. ___ EXCLUSIVE LICENSING AGREEMENTS. The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

3. ___ OTHER REASONS.

CUI

Justification for Other than Full and Open Competition FAR Part 13 Acquisitions under the SAT

B. ___ BRAND NAME

Item required must be a brand name, product, or feature of a product, particular to one manufacturer.

C. ___URGENT AND COMPELLING. The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified: __________________________________

2. Required delivery date/period of performance: __________________________________

3. Explanation of why delivery/commencement of services by the date mentioned above is required:

4. If appropriate, include any additional pertinent information.

IV. CERTIFICATIONS:

A. Technical / Requirements Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date

B. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.

Signature Name (Printed) / Phone # Date

CUI

In accordance with Fielding Plan, FP 13319A/1 paragraph 27 South-Tek Systems is the OEM for replacement and procurement of the required nitrogen generator system. The generator system is included in the Program of Record for the Fleet Marine Force and training has already been provided on this particular item. A Facilities Impact Report (FIR) of the Garrison Nitrogen Generator has been submitted, processed, and approved by Headquarters, US Marine Corps Installation & Logistics (HQ I&L) via the DON Tracker system, supply support and maintenance support have already been established via technical manuals and NSNs (paragraph 18).

File details come from the government source that posted it. Updated .