This purchase description outlines requirements for a new weld power supply to replace a non-functional unit. Rock Island Arsenal seeks one Miller Invision 450MPa 230/460V power supply under solicitation number W519TC-23-Q-2371. The contractor must deliver the unit in accordance with design, safety, and component specifications. Rock Island Arsenal will perform installation and requires the contractor provide service and support, including on-site response within 48 hours. The contractor must also register the equipment in the IUID registry and affix an IUID matrix data plate.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ROCK ISLAND ARSENAL RIPD: E4000-23-9-51

PURCHASE DESCRIPTION DATE: 21-July-23

WELD POWER SUPPLY

1. GENERAL SYSTEM DESCRIPTION

This statement of work is to purchase one Miller Invision 450MPa per the component specification section. This new power supply will replace anon-functional unit as part of a larger system. The weld power supply will be delivered by the vendor in accordance with the following requirements.

2. DESIGN

2.1 General Design Standards

2.1.1 ID DATA PLATE: The equipment shall include a main data plate which will include the following data as a minimum requirement (additional information is acceptable):

Manufacturer Name, Manufacturer’s Dunns and Bradstreet Number, Manufacturer’s Model Number, Manufacturer’s Serial Number, Year of Manufacture, Contract Number, Machine Weight. This information is necessary for compliance with the governments Unique Identification Program (UID).

2.1.2 DATA PLATES: All instruction, data, and identification plates and labels attached to this equipment and its controls shall be manufactured of corrosion and oil resistant metal or plastic material. All wording shall be in the English language using plain, bold face lettering.

Lettering shall be permanent and have a contrasting background.

2.1.3 ITEM UNIQUE IDENTIFICATION (IUID) REGISTRATION: The contractor shall register the equipment in the IUID Registry (as one single system). IUID registration requires the contractor to input Cage Code, Model Number, and Serial Number into a Government Database to allow for asset and inventory tracking. IUID Registry of the equipment shall be performed at http://dodprocurementtoolbox.com/site/uidregistry/. Training for IUID is available in https://wawftraining.eb.mil. IUID registration of this equipment is required prior to final payment in the Wide Area Work Flow (WAWF). The contractor shall also affix a machine readable 2-dimensional (2-D) matrix representing the IUID registry to the machine. The IUID 2-D matrix may be included on the ID Data Plate outlined in paragraph 3.2.4.

2.1.4 UTILITIES AVAILABLE: Rock Island Arsenal shall be responsible for providing the following:

2.1.4.1 Connection of 460-V, 60-Hz, 3-Ph AC electrical power to the fused or breaker type disconnect switch required in the ELECTRICAL DISCONNECT paragraph of this purchase description. Connection does not include filters, surge protection, or any peripheral equipment necessary to make the equipment functional.

2.1.4.2 If, due to contractor caused problems, the equipment or components of the equipment must be moved or removed and replaced, by RIA after initial placement, the contractor shall be billed for such work at current RIA labor and overhead rates.

2.1.5 NEW EQUIPMENT: The equipment furnished under this purchase description shall be new and unused.

2.1.6 PAINTING: All unfinished surfaces of the equipment shall be painted with a lead free and chromium free commercial grade of metal primer and a minimum of one finish coat. The color shall be in accordance with the manufacturer’s standard commercial practice, or as necessary to maintain compliance with OSHA regulations, as applicable.

http://dodprocurementtoolbox.com/site/uidregistry/ https://wawftraining.eb.mil/

2.2 Safety, Security and Environmental

2.2.1 INDUSTRY AND REGULATIONS: The equipment shall comply with the most current of all local, state, and federal laws and regulations listed in Standards and Publications.

2.2.2 MATERIAL EXCLUSIONS: The equipment shall not contain polychlorinated biphenyl (PCB), ozone depleting substances (Class I or Class II), or asbestos materials.

3. COMPONENT SPECIFICATION

The contractor shall be responsible for supplying all components, tools, and labor necessary to assemble, deliver, and test the weld power supplies to RIA as described below. The Rock Island Arsenal will install the equipment. This equipment shall be Miller Electric brand.

3.1 PACKAGE DETAILS FOR MILLER CONTINUUM:

3.1.1 One, Miller Invision 450MPa 230/460V using part number: 907485.

4. APPROVAL/SHIPPING

4.1 Shipping

4.1.1 RESPONSIBILITY: The contractor is responsible for delivery of the equipment to the Rock Island Arsenal. Adequate preserving of equipment surfaces, packing, marking, and skidding of materials for shipment shall be the responsibility of the contractor. If special lifting devices, such as hooks or eyes, are required for ease of handling, they shall be supplied with the equipment. Any special devices shall be returned to the contractor upon request only if they will not be required for future movement of the equipment, and at the contractor’s expense.

4.1.2 SHIPPING SCHEDULE: Be aware, the Rock Island Arsenal will only off-load equipment arriving between 6:00 am and 12:00 am (noon), local time on Mondays through Thursdays except holidays. For information concerning holidays, the contractor should consult the contracting officer. There is no place to stage transporting vehicles awaiting the arrival of contractors. All equipment shall be delivered at the same time, meaning the same day (multiple trucks are acceptable) unless pre-authorized to deliver on multiple days by the RIA-JMTC contracting officer.

4.1.3 RECEIVER: All shipments to Rock Island Arsenal including installation tools and/or replacement parts, as well as the original shipment of the equipment, shall be marked “ATTN:

Mr. Robert Mcclure or Mr. Dave Holgorsen TARA-LGC”. Items not correctly marked are subject to being returned at the vendor’s expense.

4.1.4 ARRIVAL INSPECTION: Upon receipt of equipment at Rock Island Arsenal, a preliminary inspection shall be performed to determine condition and/or count. This inspection shall be performed by Rock Island Arsenal personnel.

4.2 Installation

4.2.1 PREPARATION EXECUTION SUPPORT: Rock Island Arsenal will perform the installation of the purchased equipment.

4.3 Completion

4.3.1 Final acceptance of the equipment shall occur after the following:

4.3.1.1 Successful completion of performance testing at Rock Island Arsenal.

4.3.1.2 Complete documentation packages are delivered.

5. SERVICE

5.1 Service/Support Requirements

The contractor shall have as a minimum, a verifiable service/repair capability which meets or exceeds the following requirements:

5.1.1 STAFF: Staffed by qualified, English speaking personnel fully knowledgeable in the service/repair of the equipment offered.

5.1.2 TELEPHONE ACCESS: Telephone access to service/repair personnel shall be available for consultation during Rock Island Arsenal normal working hours. Rock Island Arsenal normal working hours are 8:00 am CST to 3:00 pm CST, Monday through Friday, except legal federal holidays.

5.1.3 ON-SITE RESPONSE: Physical, on-site response shall be possible within 48-hrs of notification that service/repair of the equipment is necessary.

5.1.4 MAINTENANCE PARTS: Parts necessary for periodic replacement such as belts, hoses, filters, and other parts normally considered as spare parts, by the manufacturer, shall be stocked and available for shipment.

5.1.5 PRIOR HISTORY: Said service/repair capability shall have been available to the general public prior to the issue date of this purchase description. Adequate proof of prior availability shall be provided upon request.

1. GENERAL SYSTEM DESCRIPTION
2. DESIGN
2.1 General Design Standards
2.2 Safety, Security and Environmental
3. COMPONENT SPECIFICATION
3.1 PACKAGE DETAILS FOR MILLER CONTINUUM:
4. APPROVAL/SHIPPING
4.1 Shipping
4.2 Installation
4.3 Completion
5. SERVICE
5.1 Service/Support Requirements