A03 Attachment 0004 Appendix C Emb Gui.pdf
PDF 244 KB Posted
- Attached to
- Repair Structure 236, High Tank Federal contract opportunity
- Solicitation number
- W52P1J-22-R-5007
About this file
This document package includes a scope of work and design standards for signage and graphics on military installations. The scope of work provides guidance for the repair of Structure 236, an elevated water tank, on the Rock Island Arsenal in Rock Island, Illinois. Key details include requirements for maintaining standardized graphic designs using approved service branch logos and seals on installation identification signs, water towers, and specialty community identification signs. Specific guidelines address logo and graphic placement, sizing, and color schemes for water tower signage. The design standards specify conformance with the Manual on Uniform Traffic Control Devices and Department of Defense supplement for all traffic control devices.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B08 22R5007 Amendment 0001.pdf | ||
| B08 2022 0726 Site Visit Pictures.pdf | ||
| B08 Repair Structure 236 - Site Visit Attendees - 26-July-2022.pdf | ||
| B04 Attachment 0006 Davis Bacon Wage Determination.pdf | ||
| A02 Attachment 0001 Scope of Work.pdf | ||
| A03 Attachment 0005 Appendix D Insp.pdf | ||
| B08 W52P1J-22-R-5007.pdf | ||
| B08 Attachment 007 Contractor Vendor Guide.pdf | ||
| A03 Attachment 0002 Appendix A - Ref Draw.pdf | ||
| B08 Attachment 0008 High Tower Site Visit.pdf | ||
| A03 Attachment 0003 Appendix B Sol Spec.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW for PR-2015-0120
Rock Island Arsenal Appendix
Appendix C: Emblem Guidance
June 2022
US Army Garrison‐Rock Island Arsenal Directorate of Public Works
Engineering and Services Division
AMIM-RIP-G
1 Rock Island Arsenal Rock Island, IL 61299‐5000
UFC 3-120-01
1 March 2014
Change 3, 12 December 2017
CHAPTER 2 DESIGN STANDARDS
2-1 GRAPHICS STANDARDS.
Standardization of graphic and text information used on military installation signs helps establish consistent visual communication and brand identity. The graphic standards in this chapter provide general guidelines for most sign message requirements, such as the use of logos, seals, fonts, and colors.
2-1.1 Service Branch Logo Identification.
Service branch logo identification includes seals, symbols, and text that are registered trademarks. Use the approved Service branch seals and text of the Army, Navy, and Marines on installation identification signs as specified in this UFC in Figures 2-1 through 2-5. Use the approved Air Force symbol and text on installation identification signs as specified in this UFC. Restrict the use of these logos to installation identification signs and water towers. There are no such restrictions on the use of these logos on interior signs. The logos must not be altered or modified in any way.
Figure 2-1 Army Logo Identification.
3-3.6.1 Specialty Community Identification Signs.
Limited use of specialty community identification signs is permitted to identify communities, housing areas, districts, or other installation-specific specialty facilities.
These signs may be customized to align with the unique architectural characteristics of each area or installation, as required. Use the general guidance and design principles provided in this UFC for these types of non-standard signage options.
3-3.7 Water Tower Signage and Graphics.
Water towers must comply with UFC 3-535-01 for marking and lighting requirements for airfield obstructions. Service logos and shields are not required for all water towers.
When applied, these guidelines apply only to water towers and may not be used for other highly visible structures. The face of the water tower tank must display only the Service branch seal or logo and the approved font identification; no additional graphics or lettering will be applied (see Figure 3-17). The paint scheme for the symbol and letterforms must be consistent with the approved colors associated with the appropriate Service branch logo. The application of each logo template may vary in overall size but must maintain the composition and proportions as provided by the digital artwork. The shapes of the seals, symbols, or letterforms must not be altered in any way.
Only apply Service logos and shields to water towers with a background color for the body of the tank that is a uniform light tone consistent with installation standards. Due to the diversity of water tower tank shapes, configurations, and orientations, the following guidelines are provided to facilitate consistent and effective implementation:
• Avoid a cluttered appearance by having no more than two applications of the symbol and letterforms on one tank.
• Orient the symbol and letterforms on the side(s) of the tank that provide the best visibility for the public.
• Size the symbol and letterforms to be easily read from a reasonable distance.
• Position the symbol and letterforms in a manner that minimizes visual interference by railings or other structural elements and minimizes distortion due to any vertical curvature of the tank surface.
Rectangle
Line
Figure 3-17 Water Tower Signs.
3-4 TRAFFIC CONTROL DEVICES.
All traffic control devices must conform to the requirements specified in the latest versions of the MUTCD and the SDDCTEA DoD Supplement to the MUTCD. The MUTCD defines the standards used to install and maintain all traffic control devices.
Exceptions to the MUTCD must be approved by SDDCTEA. SDDCTEA executes DoD’s overall transportation engineering program on behalf of the Services.
3-4.1 Fabrication and Installation.
All sign colors for traffic control devices will be in accordance with the MUTCD. Material selection and installation must consider the effects of local climatic conditions. Painting sign posts and the backs of signs is prohibited. Wood for sign faces is prohibited.
Rectangle
Line
| PR-2015-0120 Cover sheet Appendix C |
| 2022 0606 Appendix C Emb Gui |
| PR-2018-3284 Cover sheet Appendix C |
| ufc_3_120_01_2014_c3 _Service Logo |
| ufc_3_120_01_2014_Water Tower Signage |
| ufc_3_120_01_2014_c3 36 |
| ufc_3_120_01_2014_c3 37 |
File details come from the government source that posted it. Updated .