This is a Performance Work Statement (PWS) for a Tactical Fleet Support Operators Contract at Fort Moore, Georgia. The contract requires the contractor to provide three teams to support tactical vehicle maintenance and operations: one team for the 194th Armor Brigade (approximately 220 vehicles), one team for the 316th Cavalry Brigade (approximately 245 vehicles), and one team for the Directorate of Training Sustainment (DOTS) with unassigned tracked and wheeled vehicles.

The teams will conduct Preventive Maintenance Checks and Services (PMCS) on vehicles including Abrams tanks, Bradley Fighting Vehicles, Strykers, and various wheeled vehicles. Key responsibilities include performing operator-level PMCS and repairs, transporting vehicles between staging areas and maintenance facilities, operating the Global Combat Support System-Army (GCSS-Army) to manage work orders, and maintaining required documentation. Each team must have at least one GCSS-Army operator to handle maintenance tracking and reporting. The contractor must provide all personnel, equipment, supervision, and materials except for government-furnished items. Work hours are 0730-1600 Monday through Friday, excluding federal holidays. The PWS includes detailed requirements for security, safety, environmental compliance, quality control, and various mandatory training programs for contractor personnel.

View the file

Other files

File Type Posted
Tactical Fleet PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mar 24

PERFORMANCE WORK STATEMENT (PWS)

TACTICAL FLEET SUPPORT OPERATORS CONTRACT

7 March 2024

Part 1

General Information

1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.

1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide Tactical Fleet Support Operators.

1.2 Background: The Directorate of Training Sustainment (DOTS) is staffed to provide accountability of equipment and is not staffed with operators to conduct Preventive Maintenance Checks and Services (PMCS) or conduct operator level maintenance tasks.

DOTS also is not staffed with operators to drive vehicles from staging areas to appropriate maintenance facility, PMCS for acceptance, and open/close work orders with the appropriate maintenance facility.

1.3 Scope: The Contractor shall provide non-personal service(s) technical and administrative expertise on all activities related to the performance measures of the PWS and contract. The contractor shall exercise full supervisory responsibility over the contractor work operations and contract employees. Contractor shall perform operator PMCS and operator repairs on all DOTS equipment. The contractor shall have three (3) teams: 1) one (1) to support 194th Armor Brigade, 2) one (1) to support 316th Cavalry Brigade and 3) one (1) to support DOTS with unassigned tracked and wheeled vehicles and equipment. They shall prepare Tactical vehicles by conducting operator tasks contained in the appropriate Technical Manual (TM) to provide fully mission capable (FMC) equipment for training and special events. The contract shall perform operator tasks such as filling oils to proper levels, lubricating and other operator tasks as identified in the TMs of the specific vehicle type. The contractor shall also have at a minimum one (1) Global Combat Support System-Army (GCSS-Army) operator per team above to open work orders and submit to the Fleet Management Expansion (FMX) office, print 5988-E, monitor the maintenance status of vehicles, service schedules, add faults to 5988-E and provide GCSS-Army reports to units and DOTS. Contractor shall be responsible for driving tracked and wheeled vehicles to the appropriate FMX maintenance facilities: Building (Bldg.)

5405 for Tanks, Bldg. 5415 for Stryker’s and Bradley’s, and Bldg. 9116 for wheeled vehicles.

Once FMX QA/QC inspection is complete contractor shall open work order at the appropriate fleet shop office. Contractor shall retain a copy of the work order and provide to the Contracting Officer Representative (COR) or Unit Alternate COR (ACOR). When vehicles are complete with maintenance contractor will pick up the vehicles as requested on workload from the appropriate FMX ready line, PMCS to verify there are no faults and drive to unit parking area near Bldg. 5205. DOTS contract team will drive light and heavy wheeled vehicles to Bldg.

9115 and Stryker’s to Bldg. 9122. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.

1.4 Objectives: Provides operator level PMCS on all tactical tracked and wheeled equipment used to support Unit missions. The contractor shall be responsible for ensuring 100% of PMCS(s) identified by the S&S Division are accomplished so equipment and communication devices are ready for issue to training units.

1.5 General Information:

1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.

The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the COR for review within ten (10) days after date of contract award (A001).

The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within 10 days. If the Government has provided comments, the Contractor shall then have 10 days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the KO’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the KO no later than 10 prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:

(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.

(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals).

(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses.

(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance.

(e) How the Contractor will ensure all keys issued will remain controlled items

(Paragraph 1.7 Key Control).

(f) How the Contractor will inventory and track maintenance of all Government Provided

Equipment/Materials.

(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and

(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus five (5) years.

1.5.1. RESERVED

1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within one (1) working hour of identifying those issues. Verbal reports shall be followed up by written reports within two (2) working days (A.002).

1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).

1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.)

deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.

1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the KO. When a U.S.

holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.

New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents’ Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th Juneteenth

1.5.3.2 RESERVED

1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.

1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0730 to 1600, Monday through Friday except U.S. Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.

1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0730 to 1600, Monday through Friday. The Government facility is closed during local or national emergencies, administrative closings, or similar Government directed facility closings. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.

1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0730 to 1600, Monday through Friday except when closed during local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.

1.5.4.3.1 Contractor Work Plan: The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.). The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within ten (10) days after date of contract award (A.003). The Government will review and either accept or return their comments to the Contractor within ten (10) days. The Contractor shall then have three (3) days to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum 30 days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.

1.5.5 Training Holidays: Fort Moore has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday.

However, announced training holidays or Holiday block leave of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.

1.5.6 Place of Performance: The work to be performed under this contract will be performed at the Government Maintenance Facilities on Fort Moore, Georgia: 1) Harmony Church (Buildings 5205, 5208, 5310, 5405, 5408, 5409, 5418, 5211 and 5525); 2) Kelley Hill (Buildings 9110, 9111, 9113, 9115, 9116, 9122, 9136, and 9137). The daily operations will be performed on a hard stand or gravel improved surfaces.

1.6 Security Requirements: The following information is provided on security related matters.

1.6.1 Security Program: The contractor will be required to meet the Fort Moore, Directorate of Emergency Services Contractor Policies. This contract requires a NAC / NACI background check.

1.6.2 Personnel Security Clearance Requirements: Reserved

1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings, and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.

The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.

The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.

Contractor and all associated sub- contractors’ employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190- 13), applicable installation, facility and area commander installation/facility access and local security policies and procedures provided by government representative.

1.6.3.1 Installation Pass Log: In addition, the Contractor shall provide the KO, via the COR, an Initial Installation Pass Log within three (3) calendar days after contract award (A.004). The log must at a minimum contain the following information, first name, last name, contact number, scheduled time of entry and time of departure. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five

(5) days after any changes to the log (A.005)

1.6.3.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within three (3) days (A.006).

1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within 3 days (A.007).

1.6.3.4 Common Access Cards (CAC) and CAC Log The Contractor shall provide the following information: Last, First and Middle Names, government issued personal identifier (e.g. Social Security Number, Federal Identification Number, or Tax Identification Number), date of birth, primary email address (this email address will be used to contact the individual) and any other necessary information required to obtain a CAC or installation access card, to the COR with five (5) days) after award (unless circumstances require otherwise and as directed by the Contracting Officer) (A.008). The Contractor shall ensure safeguarding of Personally Identifiable Information (PII) and comply with requirements under 1.22.5.

All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete. AT Level I Awareness training within calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within calendar days after completion of training by all employees and subcontractor personnel. AT level I Awareness training is available at the following website: http://jko.jten.mil.

Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014‐05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on‐site or remotely; (2) remote access, via logon, to a DoD network using DoD‐approved remote access procedures; or (3) physical access to multiple DoD facilities or multiple non‐DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

The Contractor shall provide a CAC log within the first 30 calendar days after contract award and within five (5) days after changes have been made (A.008) (unless circumstances require otherwise and as directed by the Contracting Officer). The COR will provide format and content for the log during the post award meeting. Note - CACs are Government property and must be accounted for.

1.6.3.5 Controlled Unclassified Information (CUI). Include DFARS clause 252.204-7012, which requires the contractor to comply with NIST 800-171. Also include DFARS provision 252.204-2019 into solicitations. Acquisition officials should follow procedures outlined in http://jko.jten.mil/

DFARS 204.73 and verify vendors have an adequate NIST SP 800-171 summary assessment score within the Supplier Performance Risk System (within PIEE). If the score doesn't show a medium- or high-level assessment with a score of 110 or better (as described in the "NIST SP 800-171 DoD Assessment Methodology"), include clause 252.204-7020 and obtain the vendor's "system security plan" and "plan of action" for NIST SP 800-171 verification and assurance by Army security officials.

1.6.4 Background Checks: The contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD- approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.

For information assurance (IA)/information technology (IT) training. All contractor employees and (IT) training. All contractor employees and associated sub-contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working in IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M and AR 25-2 within six (6) months of appointment to IA/IT.

1.6.4.1 U.S. Citizen: Contractors that work with or teach youth under the age of 18 years are subject to U.S background checks. The Requiring Activity Manager will determine the extent of background checks required. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within three (3) days of receipt by the Contractor, identifying such with the appropriate contract number (A.009). The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within three (3) days of receipt by the Contractor, identifying such with the appropriate contract number (A.009). When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.

1.6.4.2 Local Nationals and Third Country Nationals: Local national and third country national Contractors that work with or teach youths under the age of 18 years are subject to background checks as determined by the Requiring Activity Manager. As a minimum prior to beginning performance, Contractors employing local national and third country nationals shall furnish the Contracting Officer via the COR and the Requiring Activity Manager current documents required for working on a US installation, no later than five (5) days after contract award (A.010). Forwarding correspondence from the Contractors shall identify the associated contract number.

1.6.5 PHYSICAL Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13.)

1.6.6 Operations Security (OPSEC) Requirements: The contractor shall adhere to the Government's Operations Security (OPSEC) Standard Operating Procedure (SOP)/Plan during the entire period of performance. Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. In accordance with AR 530-1 all personnel, to include contractor employees and associated sub-contractor employees must complete Level I OPSEC training which is composed of both initial and continual awareness training (annually). All personnel within the first 30 days of arrival in the organization must receive initial training to include a briefing on the organizations critical information read/sign the OPSEC Individual User Compliance Agreement form. The end state of initial and continual awareness training is that each individual should have the requisite knowledge to safeguard critical information.

1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Quality Control Plan.

1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The KO, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance.

At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.

Meetings may start or end outside of regular duty hours.

1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.

1.10 Key Personnel: The following personnel are considered key personnel by the Government: Contract Manager/Alternate Program/Contract Manager, Quality Control Manager. The Contractor shall provide a Program/Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Program/Contract Manager, who shall act for the Contractor when the Program/Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer during the post-award meeting (A011). Acceptance of the CV by the Contracting Officer is required before these individuals are permitted to perform any task on this contract. The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between 0730 to 1600.

Qualifications for all key personnel are listed below:

a. Contract Manager and Alternate Contract: Manager shall be knowledgeable in the use of STAMIS systems, TMs, Lube Orders, and other manuals governing Operator Level PMCS. Assigns and directs the work of personnel executing the performance measures and standards outlined in the PWS explains work requirements, methods, and procedures. Instructs subordinates on new requirements and provides advice when defective services or problems arise. Investigates work related problems (e.g., scheduling problems, late or missed missions) to identify causes and implement corrective actions within the contractor’s capability. Adjusts plans, schedules, assignments, and methods as necessary to accomplish the work as effectively and economically as feasible. Determines equipment and supplies required needed to accomplish the mission. Ensures all equipment is available in the types and amounts required in order to accomplish scheduled tasks and so as not to delay training and vehicle operations. Oversees the -10-level maintenance and readiness of the vehicles assigned.

b. Quality Control Manager / Team Leads: Manager shall be knowledgeable in the use of STAMIS systems, TMs, Lube Orders, and other manuals governing Operator Level PMCSs. Assigns and directs the work of personnel executing the performance measures and standards outlined in the PWS explains work requirements, methods, and procedures. Instructs subordinates on new requirements and provides advice when defective services or problems arise. Investigates work related problems (e.g., scheduling problems, late or missed missions) to identify causes and implement corrective actions within the contractor’s capability. Adjusts plans, schedules, assignments, and methods as necessary to accomplish the work as effectively and economically as feasible. Determines equipment and supplies required needed to accomplish the mission. Ensures all equipment is available in the types and amounts required in order to accomplish scheduled tasks and so as not to delay training and vehicle operations. Oversees the -10-level maintenance and readiness of the vehicles assigned.

c. Special Qualifications: The Contractor shall ensure all employees possess and maintain current:

• Valid state driver’s license.

• Ability to obtain and maintain a Government Issued military driver’s license.

• Pre-employment (drug-test) and Annual physicals.

• High school education or equivalent. .

• Experience or training in tactical tracked and wheeled vehicle operations to include driver responsibilities and Communications equipment.

• Basic vehicle maintenance skills, and experience with hand tools, both manual and power.

• Experience.

Physical requirements - The contractors shall be able to lift items weighing up to 50 pounds individually. Personnel assigned as Team Lead must also have:

• Experience as working leader in accomplishing trades and labor work.

• Experience in transportation administration (planning maintenance schedules, establishing deadlines and priorities, personnel management, and service records).

Personnel assigned as operator must have:

• Experience or training in maintenance, operation, and procedures for vehicle driven.

• Experience or training in preparation of , service records, and accident reports.

• Experience or training in hand tools, manual and power.

• Experience or training with all wheeled and track vehicle operations.

1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.12.1 Contractor Work Areas: Contractor workspace (staging site, on-site office, desk, or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance within (10) calendar days after contract award (A.012).

Workspace sign location shall be coordinated with the COR. Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting, or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name.

Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.

1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (DFARS part 211.1). Service contracts shall require contractor employees to identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contracts shall require contractor personnel to appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence. The badge must include the employee’s name, the contractor’s company name, the functional area of assignment, and a recent color photograph of the employee.

Companies with U.S. Government contracts will require their employees to wear these badges visibly when performing work at Government workplaces unless this would be impractical because of mission or safety considerations. The Contractor shall collect all ID Badges upon completion of the contract or termination of employee. A listing of issued ID cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor personnel changes (A.013).

1.13 Contractor Travel: Reserved

1.14 Other Direct Costs (ODCs): Reserved

1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the

Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.16 Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be averse to the interests of the Government or others. The Contractor and Contractor personnel shall not divulge, or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.

1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery management operations center and contained at www.dimoc.mil/resources/limitations/, the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.

1.18 Non-Disclosure Statements: The Contractor shall provide signed non-disclosure agreements to the Government no later than three (3) days prior to commencement of work under the contract (A.014) Disclosure of information by Contractor personnel may result in removal of Contractor personnel from performance under this contract.

1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI (A.015). The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.20 Phase In /Phase Out Period: To minimize decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have Contract Manager on board (14) days after being awarded the contract. During the phase in period, the http://www.dimoc.mil/resources/limitations/

Contractor and Contract Manager shall become familiar with performance requirements in order to commence full performance of services on the contract start date. All other employees shall be on board within 30 days after the contract being awarded (A.016).

1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:

1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein Department of the Army (DA) Pamphlet 385-10, local, State, Federal Safety Laws, and Regulations.

The requirements under FAR 52.236-13 and specifically of the DA Pam 385-30 include, but are not limited to the following:

(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of; will be reviewed for acceptance by designated Government personnel. Specific requirements for development of the Accident Prevention Plan are found in PM 385-10-8. PM 385-10-8 is available online at MCOE - Home (sharepoint-mil.us).

(b) Before beginning each day involving a type of work presenting hazards not experienced in previous operations or where a new work crew or subcontractor is to perform work. Deliberate Risk Assessment shall be prepared by the Contractor performing the work activity (see paragraph 3.a of PM 385-10-8).

(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work.

(d) The Contractor shall discuss the plans in conferences convened by the Contracting

Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within 15 calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen 15 calendar days prior to initiation of work on each major phase.

(A.017).

(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:

(i) Short sleeve shirt.

(ii) Long trousers.

(iii) Steel-toed safety boots; and gloves https://armyeitaas.sharepoint-mil.us/sites/TR-MCoE

(iv) Hard hat, eye protection and hearing protection

1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on maintenance sites and other applicable occupational safety codes.

The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. For the compliance with state and local laws and regulations, the Contractor shall comply with the non-exclusive list of duties described in this paragraph. If the Contractor determines that additional activities are required to fully comply, the Contractor shall ensure that compliance with the laws is complete. The duties include:

(a) Conditions of maintenance and operational activities to be considered include but are not limited to:

(i) For all maintenance activities meeting the following criteria: Weather conditions performing work under adverse weather conditions.

(ii) Safety briefing prior to transporting vehicles to staging areas.

(b) The Contractor shall prepare a Safety and Health Protection Plan (SIGE) as required under that regulation. The SIGE shall be submitted 30 days after contract award date. In addition, the Contractor shall appoint a qualified Safety Coordinator who will ensure that safety measures are implemented during maintenance and operation of vehicles. The Safety Coordinator must meet minimum training and experience requirements required by Fort Moore Post Safety.

(c) The SIGE will be written in a comprehensive form and explained in language the workers understand and shall contain the following minimum information:

(i) Maintenance of tools and equipment.

(ii) Provisions for the storage and disposal of materials and waste, particular hazardous materials, and substances.

(iii) Modifying performance periods for such work, taking into consideration the site conditions.

(iv) Organizing cooperation between different employers and Contractors without employees.

(v) Interaction between work at the site and other operational activities in the area, on which or near which the first identified work will be performed and taking into consideration the instructions and advice of the coordinator as well as safety and health plans.

1.21.1.2 The Contractor shall complete and provide safety notifications required and will provide documented proof to the Contracting Officer via the COR, no later than five (5) of days such notifications were made.

1.21.1.3 Reserved

1.22 Environmental Compliance: The following provides information on Environmental Compliance.

1.22.1 Environmental Compliance Plan and Program: The Contractor shall ensure that all of its operations and activities conform to the Fort Moore environmental policy requirements.

The Contractor shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on Fort Moore installation are conducted in accordance with the Fort Moore Spill Prevention and Response Plan, Solid Waste Policy, Final Governing Standards, and applicable Georgia environmental laws/standards.

Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Fort Moore environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the Department of Public Works (DPW) Environmental Division.

The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Fort Moore Fire Department at CIV.

The Contractor shall contact the COR Marcus (Mark) Howard for a copy of the Fort Moore Environmental Policy, Spill Prevention and Response Plan, Solid Waste Policy, and Fort Moore Final Governing Standards.

Current Environmental Policy (MCoE DOTS 2024 External Operating Procedures) will be provided to the contract Program Manager.

1.23 Required Training: The following provides information on training requirements.

1.23.1 Anti-Terrorism (AT) Level I Am training: All Contractor employees, including subcontractor employees, who are employed under the contract, shall complete AT Level I Training within 30 calendar day after contract start date or effective date of incorporation of this requirement into the contract, whichever applies, or 30 days after employment of new personnel. Contractor personnel travelling overseas shall complete area of responsibility (AOR) specific AT awareness training for U.S. based Contractor employees and associated subcontractor employees. The Contractor shall submit certificates of completion for each affected Contractor employee and subcontractor employee to the COR (or to the Contracting Officer if a COR is not assigned) within three (3) days after completion of this training by all employees and subcontractor personnel. AT Level I awareness training is available.

Contractor personnel shall complete refresher training every 12 months except AOR specific AT Level I training which shall be completed as required by local AT policies.

If training cannot be conducted on the website, the Contractor shall coordinate with the COR who will contact the local AT Officer at their assigned location for classroom training.

Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the AT Officer. Verification of the training shall be provided to the COR within three (3) days after completion of the training.

1.23.2 OPSEC Training: All Contractor employees, including subcontractors, shall complete Level I OPSEC training within 30 days of employment under this contract. Verification of the training shall be provided to the COR within five (5) days after completion of the training.

OPSEC Level I training is available at http://www.cdse.edu/catalog/elearning/GS130.html.

Contractor personnel must complete refresher training every 12 months. Verification of the training shall be provided to the COR within five (5) days after completion of the training.

If training cannot be conducted on the website, the Contractor shall coordinate with the COR, who will contact the local OPSEC Officer at their assigned location for classroom training.

Contractor personnel completing training in the classroom will receive a certificate or the training attendance roster signed by the OPSEC Officer. Verification of the training shall be provided to the COR within five (5) days after completion of the training.

1.23.3 iWATCH Training: The Contractor and all associated subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days after the contract is awarded and within 30 calendar days after new employees commence contract performance, with the results reported to the COR within 30 calendar says after the contract is awarded and within 30 calendar days after new employees commence contract performance. Verification of the training shall be provided to the COR within three (3) calendar days after completion of the training. Training slides can be found on the Army OneSource we site:

http://www.myarmyonesource.com/familyprogramsandservices/iwatchprogram/default.aspx

1.23.4 Information Assurance (IA) Training

1.23.4.1 All Contractor employees, including subcontractors, requiring access to Government information systems shall complete the DoD IA Cyber Awareness Training within five…

This is the start of the file's text. The full file is on GovTribe.